Item Description BILL NO. 5 DAY WORKS (ALL PROVISIONAL) Unit Qty Rate, UGX. A B C D E F G H J In accordance with Clause 13.6 of the Conditions of Contract, the Contractor will be paid day work rates for extra work that cannot properly be measured and valued, and the Contractor is to insert in the space provided below the basic rates and costs of labour, materials and plant as described hereunder:- LABOUR WALLER CARPENTER SCAFFOLDER JOINER PLUMBER ELECTRICIAN PLASTERER PAINTER LABOURER hours hours hours hours hours hours hours hours hours 1 1 1 1 1 1 1 1 1 To the basic nett rates of labour used for work carried out on dayworks, an addition 30 % percent which is to include for task work and incentive schemes, tools, standing, scaffolding, supervision, insurace, transport profit and overheads. To collection of Day works 5/1
%
A B C D E F G H
Marmoran Finish
MATERIALS
Per SQ.M. Per SQ.M. Per SQ.M. Per Tonne Per Tonne Per Tonne Per Tonne Per Tonne
1 1 1
Armstrong Suspended Ceilings
Gypsum board Ceilings Cement Lime Sand
Aggregate (grade 25 - 5mm) Hardcore
1 1 1 1 1
I J
Steel reinforcement
(i) Mild steel bar
(ii) High tensile bar
BRC A 142 Fabric Mesh Steel Reinforcement 2.4 x 48M
Kg Kg Per Roll 1 1 1
K L M N O P Q R S T U V W X Y
APP-Modified Bitumen
Wrot timber (Mahogany)
Steel formwork
2mm thick approved aluminium roof edge trim
Approved Anti-termite treatment
Paint, Gloss
Paint, Emulsion
Mahogany Varnish
200mm diameter PN6 uPVC water pipe 6M
160mm diameter PN6 uPVC rainwater downpipe 6M
Ditto bends
Ditto offsets
Ditto watershoe
Fixing brackets
Fixing screws
Per SQ.M Per C.M Per SQ.M Per M Per 4 Litres Per 4 Litres Per 4 Litres Per 4 Litres Per Each Per Each Per Each Per Each Per Each Per Each Per Packet
1 1 1
1 1
1
1
1 1 1 1 1 1 1
1
Per Z Structural glazing To collection SQ.M. 1
A B C D E F G H I J K L M N
2750mm x 1830mm x 12mm Melawood board
10mm Clear sheet glass
8mm clear sheet glass
6mm clear sheet glass
10mm Translucent glass
8mm Translucent glass
10mm clear PVB glass
8mm one way reflective glass
Complete PC Econo lockset
Complete WC Econo lockset
102mm x 76mm stainless steel butt hinge
Lever Action Flush bolt
Coat Hooks
Indicator Signage
5/2
Per No. Per SQ.M. Per SQ.M. Per SQ.M. Per SQ.M. Per SQ.M. Per SQ.M. Per SQ.M. Per Each Per Each Per Each Per Each Per Each Per Each
1
1
1
1
1
1
1
1 1 1 1 1 1 1
O P Q R S T U V W Door stop Door closer Solid clay bricks 450mm x 200mm x 100mm hollow concrete blocks 450mm x 200mm x 100mm solid concrete block 450mm x 200mm x 150 ditto 400mm x400mm x 10mm Porcelain tiles 600mm x 600mm x 10mm granite tiles 300mm x 200mm x 6mm Ceramic tiles To collection 5/3
Per Each Per Each Per Each Per Each Per Each Per Each Per SQ.M. Per SQ.M. Per SQ.M. 1 1 1 1 1 1 1 1 1
A B C D
300mm x 300mm x 300mm Maxpan block
25mm x 3mm earth copper tape
70mmsq bare copper cable
35mmsq PVC/SWA/PVC copper cable
Per SQ.M Per M Per M Per M
1 1 1 1
E F G H I 35mmsq XLPE/PVC copper cable
2.5mmsq. SC PVC copper cable
35mmsq. SC PVC-I copper cable
25mm Heavy gauge PVC conduit
T5 1x28W 1200mm single bare batten fluroscent luminare Per M Per M Per M Per M Per Each 1 1 1 1 1
J K L M N O P Q R T U V W
T5 4x14W,600x600mm recessed fluroscent luminare Per Each
3 section PVC trunking size 250x65mm as Marshall Tufflex Per M
6.0mmsq. 4C PVC-SWA-PVC copper cable Per M
10.0mmsq SC PVC-I copper cable Per M
2.5mmsq. 4C PVC-SWA-PVC copper cable Per M
1.5mmsq SC PVC-I copper cable Per M
100mm diameter galvanised steel tubing 6M Per M
100mm diameter chlorinated poly vinyl chloride (CPVC) pipes 6m Per Each
80mm diameter ditto Per Each
65mm diameter ditto Per Each
25mm diameter ditto Per Each
80mm diameter CPVC globe valves Per Each
65mm diameter ditto Per Each
25mm diameter ditto Per Each
1 1 1 1 1 1 1
1 1 1 1 1 1 1
S
To collection 5/4
A
15mm diameter CPVC angle valves Per Each 1
B C D E F G H I J K L M N
160mm diameter uPVC soil waste water pipe 6M
110mm diameter ditto
38mm diameter ditto Floor trap
110 x 50mm diameter trapped floor gully
110mm ditto floor gully inlet
110mm diito wc connector 'P' outlet
32mm ditto self-releasing bottle trap
40 x 32mm diameter socket reducer
50mm Bronze gate valves
'S' trap WC bowl to BS 3402
32mm diameter back entry, low pressure flush valve
530 x 450mm counter top viterous china wash hand basin with one tap hole
Armitage Shanks viterous china semi-recessed toilet roll holder complete
Automatic hand dryer
Armitage shanks viterous china urinal bowl complete
Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each
1 1 1 1 1 1 1 1 1 1 1 1
1
1 1 1
O P Q
Ariston 80 liter pressure type water heater 6mm Plane glass mirror size 610x 475mm single bowl single drain stainless steel kichen sink size 1000 x 500 x 200mm To collection 5/5
Per Each Per Each Per M 1 1 R S T 1
COLLECTION
Page5/1
Page5/2
Page5/3
Page5/4
Page5/5
To the basic nett rates of materials used for work carried out on dayworks, an addition of 30% which is to include for unloading and storing as necessary, the use of hand plant, and machinery etc. available on site, profit and overheads. To collection of Day works 5/6
%
A
PLANT
D4 Tractor or equivalent
Hrs
3
-
B C
D7 Tractor or equivalent
Motor Grader Cat. 14 or equivalent (complete with scarifier)
Hrs Hrs Hrs 3
3
-
2 1/4 cu. Yd. Tractor excavator with loader attachment 3
- D - E F G H J K L
Mechanical excavator with 22 cu. Ft bucket capacity or equivalent
Portable Compressor with 2 breakers or equivalent with 1500 mm hoses and reels
Damp Truck (0.75 tonne)
Lorry tipper (7 tonne)
Concrete Mixer (14/10) complete for weight batch mixing
50 mm self priming centrifugal pump with hose and ancillary equipment
Concrete Vibrators
To the basic rates of plant used for work carried out on dayworks, an addition of 30% per cent, which is to include for driver and/or attendance, fuel and consumable stores supervision, insurance, road licence, profit and overheads.
Hrs hours hours hours hours hours hours
3 - 3
- 3
- 3
- 3
- 3
- 3 - - -
To collection of Day works COLLECTION LABOUR MATERIALS PLANT TOTAL CARRIED TO GRAND SUMMARY 5/7 Item DEMOLITIONS GENERAL SUMMARY OF LEVELS BILL NO. 4 PARKING TOWER Description PROPOSED CONSTRUCTION OF UGANDA REVENUE AUTHORITY HEADQUARTERS BUILDINGS AT NAKAWA Unit - C - - - - Quantity Rate Amou USH -
LEVEL 1
-
LEVEL 2
-
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
-
-
-
-
Item Reinforced insitu concrete grade 25 as described in:- The prices for the following ready-mix concrete by a supplier with capacity of not less than 250M3 placement per day are to include for filling into formwork, well vibrating and packing around rod reinforcement (measured separately) R.C SUPERSTRUCTURE ELEMENT NO. 2 BILL NO. 4 PARKING TOWER PROPOSED CONSTRUCTION OF UGANDA REVENUE AUTHORITY HEADQUARTERS BUILDINGS AT NAKAWA Total Carried to Grand Summary Description Unit Quantity SHS. Rate, UGX. - A Beams M3 215 B Upstand beams M3 30 C Columns M3 24 D 250mm thick lift shaft wall
E 250mm thick wall
F 200mm thick shear wall
G
175mm thick suspended solid slab with approved hardener, mechanically floated
Reinforcements High tensile steel bar reinforcement to BS 4461
H Bars up to and including Y 32
Steel formwork to form fair faces as described to:-
J Sides and soffites of beams with chamfered edges
K Soffites of suspended slab
L Sides of upstand beams with sloping edges
M Sides of wall
N Sides of columns
P Sides of shear wall
Q Sides of lift shaft wall
M2 25
M2 45
M2 32
M2 2,547
Kg 122,949
M2 2,101
M2 2,547
M2 304
M2 91
M2 197
M2 65
M2 49
Total Carried to Summary at the End of Elements 4/2/1
BILL NO. 4
ELEMENT NO. 4 EXTERNAL WALLS Solid concrete blockwall in cement mortar (1:4) reinforced with one layer of 25mm wide x 16 gauge hoop iron built into every second course and laped 300mm at joints and intersections and carried at least 115mm into abutting walls in:
A 200mm thick wall
M2 177
Total Carried to Summary at the End of Elements 4/4/1
Solid concrete blockwall in cement mortar (1:4) reinforced with one layer of 25mm wide x 16 gauge hoop iron built into every second course and laped
INTERNAL WALLS ELEMENT NO. 5 BILL NO. 4
300mm at joints and intersections and carried at least 115mm into abutting walls in:
A 150mm thick wall
M2
359
Total Carried to Summary at the End of Elements 4/5/1
A B C D
ALUMINIUM WINDOWS
Purpose made powder coated Aluminium windows complete with Aluminium section frames and subframes for single glazing including glazing beads, wash leather strips, sealing, all ironmongery and accessories all as per Architect's detailed drawings in:
WINDOWS ELEMENT NO. 6 BILL NO. 4
Window size 5050mm wide x 2200mm high overall
No
11
Window size 4620mm wide x 2200mm high overall
No
1
Window size 3850mm wide x 2200mm high overall No
1
Window size 3714mm wide x 2200mm high overall
No
1
E F Window size 1807mm wide x 2200mm high overall Glass and Glazing fixed as per Architect's details No 5 10mm thick clear PVB laminated fixed to aluminium frame with and including wash leather strips, seals and aluminium beads M2 169 Total Carried to Summary at the End of Elements 4/6/1
BILL NO. 4
ELEMENT NO. 7 DOORS Supply and Fix the following Purpose made doors in wrought mahogany as described in:-
A 45mm thick Purpose made Solid Core Flush door size 900mm x 2100mm high overall, covered both sides with mahogany veneered plywood and hardwood lipping to all exposed edges, complete with 200mm wide x 300mm high framed glazed vision panel filled in with and including 8mm clear victorian wire mesh glass, wash leather strips and
15mm x 15mm hardwood beadings all fixed as per Architect's
details (D3) No
B 45mm thick Solid Core Flush doors size 750mm x 2100mm high overall covered both sides with mahogany veneered
plywood and hardwood lipping to all exposed edges as per
Architect's detail (D4) No
C 45mm thick Purpose made Solid Core Flush double door size 1450mm x 2100mm high overall covered both sides with mahogany veneered plywood and hardwood lipping to all exposed edges, comprising 2No. unequal side hung openable leaves, 1No. leaf size 850mm wide x 2100mm high, 1No. leaf size 600mm wide x 2100mm high with 3no Circular glazed vision panels filled in with and including 8mm clear victorian wire mesh glass, wash leather strips and 15mm x 15mm
hardwood beadings, panels circular to 110mm, 170mm and
217mm radii, all fixed as per Architect's details (D9) No
D Extra over door size 850mm wide x 2100mm high for forming
framed opening size 600mm wide x 400mm high for metal
louvre unit (louvre unit measured elsewhere) No
9
10
6
6
Door frames, linings and mouldings in wrought mahogany as described to Architect's details:- E 50mm x 20mm splayed architrave M 259 F 225mm x 50mm rebated frame M 129 G 225mm x 50mm rebated transome M 9 H 200mm x 50mm rebated mullion M 13 To collection 4/7/1
A
Glass and Glazing
6mm thick x 300mm wide x 1450mm long clear sheet glass horizontal louver fixed in grooves made in timber frame to
Architect's satisfaction
Suppy and Fix the following \ or equal approved Ironmongery
No
12
B 102mm x 76mm Butt hinges; ref. Cat. No. 926.29.603 Pair 37.5
C
Complete PC Econo lockset including handle set; Cat. No.
902.92.076, mortise lock; Cat. No. 911.02.153 and double cylinder; Cat. No. 916.59.007
D
Complete WC Econo lockset including handle set; Cat. No.
902.93.076, mortise lock; Cat. No. 911.02.155
E Pull handle; ref. Cat. No. 903.03.163
F Coat hooks; ref. Cat. No. 842.20.904
G Indicator bolts; ref. Cat. No. 903.53.740
H Door stop, floor mounted; ref. Cat. No. 937.41.104
J Door closer DCL110 swing arm; ref. Cat. No. 931.84.229
K Stainless Steel Push plate size 300mm x 100mm; ref. Cat. No. 987.11.300
L
Stainless Steel kick plate size 800mm wide x 150mm high x 3mm thick; ref. Cat. No. 987.28.000
M Ditto size 500mm wide x 150mm high ditto
Symbol (Male); ref. Cat. No. 987.20.010
N
Symbol (Female); ref. Cat. No. 987.20.020
P
To collection
No 15
No 10
No 12
No 100
No 10
No 31
No 25
No 9
No 18
No 24
No 5
No 5
C Page No. 4/7/1 Page No. 4/7/2 Total Carried to Summary at the End of Elements 4/7/2
A
BILL NO. 4
ELEMENT NO. 8
INTERNAL FINISHINGS
Cement and sand (1:4) screed :-
25mm thick paving finished wood float to receive porcelain
floor tiles (measured separately)
M2
573
Gypsum Board suspended ceiling
Supply and Fix 12mm Thick Plaster Board on and including 65 x 20 x 0.5mm thick omega profile channels at 600mm centres one way; 40 x 10 x 0.5mm \centres other way; 20 x 20 x 0.5mm thick angles fixed to walls or hung from ceilng soffites at 1000mm centres to
Architect's detailed drawing; on
B
Ceilings suspended exceeding 150mm and not exceeding
500mm below concrete slab soffites
M2
C
Extra over ceiling for trap door including all edge triming and framing
No
Floor Tiling
Supply and Fix 600 x 600 x 10mm Thick approved non-slip Porcelain floor tiles bedded and jointed in approved water proof adhesive, pointed with approved water proof coloured cement to:
D Floors M2
E
10mm thick x 200mm high approved colour porcelain tile
skirting finished flush with wall plaster with aluminium top edge M
Cement and sand (1:4) :-
F
12mm thick wall backing to receive ceramic wall tiles
(measured separately) M2
Supply and Fix White Glazed Wall Tiles;
G 300mm x 200mm x 6mm thick approved glazed ceramic wall
tiles in approved colour fixed with adhesive on rendered
backing (measured separately) and flush pointed in grout M2
Extra over for PVC rounded edge top
H M
573
3
573
392
295
295
141
Extra over for PVC corner strip J Two coat lime plaster; 12mm thick; first coat of cement lime and sand (1:2:9); second coat of cement lime putty and sand 1:1:6 steel trowelled on: M 221 K Walls M2 732 L Columns M2 61 M Beams M2 1,051 To collection 4/8/1
Prepare and apply one undercoat and two finishing coats of silk vinyl paint in accordance with manufacturer's instructions to:
A
Plastered walls
M2
732
B
Ditto columns
Prepare and apply one undercoat and two finishing coats of matt emulsion paint in accordance with manufacturer's instructions to:
Plasterboard ceiling soffites
M2
61
C
M2
573
D Beams
M2
1,051
Prepare and apply three coats of polyurethane clear vanish in accordance with manufacturer's instructions to:
E General surfaces of wood
F Wood surfaces not exceeding 100mm girth
G Wood surfaces 200 - 300mm girth
To collection
Page No. 4/8/1
Page No. 4/8/2
M2 102
M 259
M 151
C Total Carried to Summary at the End of Elements 4/8/2
BILL NO. 4
ELEMENT NO. 9
EXTERNAL FINISHINGS
Cement and sand (1:4) backing including approved waterproofing additive finished smooth with a steel trowel:
A
50mm thick average laid to falls to receive bitumen roofing
M2
2,623
APP - Modified Bitumen
4mm thick EPDM APP modified bituminous water proofing membrane reinforced with polyester with 50mm side and 75mm end laps, fully bonded and torch applied onto solvent base primer conforming to ASTMD- 41 applied in accordance with manufacturers instructions; to
B
Flat roof terrace
M2
2,623
Concrete Pavers
Provide and lay 600mm x 600mm x 60mm thick approved precast concrete paving slabs; bedded on 50mm sand blinding including jointing with approved
water proof cement and sand mortar (1:4) in straight continuous joints not exceeding 2mm thick in both directions on bitumen (Measured Separately); flush pointed in water proofed grout as described on: C Flat roof terrace Parking Lines M2 1,930 D E 25mm wide yellow parking lines painted with road paint Rainwater Installation 160mm diameter uPVC PN 6 heavy duty drainage down pipe; M 402 plugged to wall/concrete with and including holderbats Extra over for 160mm water shoe. M 120 F 160mm diameter fulbora cast iron outlet. G 450 x 450mm stainless steel grating. H No 10 No 10 No 10 Total Carried to Summary at the End of Elements 4/9/1
PROPOSED CONSTRUCTION OF UGANDA REVENUE AUTHORITY HEADQUARTERS
BUILDINGS AT NAKAWA
PARKING TOWER BILL NO. 4 LEVEL 6 SUMMARY OF ELEMENTS
Element No. 2: Superstructure
Element No. 4: External Walls
Element No. 5: Interrnal Walls
Element No. 6: Windows
Element No. 7: Doors
Element No. 8: Internal Finishings
Element No. 9: External Finishings
Total Carried to General Summary S
Item R.C SUPERSTRUCTURE ELEMENT NO. 2 BILL NO. 4 PARKING TOWER PROPOSED CONSTRUCTION OF UGANDA REVENUE AUTHORITY HEADQUARTERS BUILDINGS AT NAKAWA Description Unit Quantity Rate, UGX. Amount USHS
The prices for the following ready-mix concrete by a supplier with capacity of not less than 250M3 placement per day are to include for filling into formwork, well vibrating and packing around rod reinforcement (measured separately)
Reinforced insitu concrete grade 25 as described in:-
A Columns
B Beams
C Upstand beams
D Stair case
E 250mm thick lift shaft wall
F 250mm thick wall
G 200mm thick shear wall
175mm thick suspended solid slab with approved
H
hardener,
mechanically floated
I 175mm thick stair case landings
J
175mm thick susupended sloping ramp with approved hardener, tamped finish
Reinforcements
M3 56
M3 176
M3 34
M3 6
M2 25
M2 45
M2 108
M2 1,783
M2 27
M2 133
-
-
-
-
- -
-
-
-
High tensile steel bar reinforcement to BS 4461 K Bars up to and including Y 32 Steel formwork to form fair faces as described to:- Kg 133,974 - L Sides of columns with chamfered edges M2 467 - M Sides and soffites of beams ditto M2 1,648 - N Sides and soffites of sloping ramp beams ditto M2 64 - P Soffites of suspended slab M2 1,783 - Q Sides of upstand beams with chamfered edges M2 260 - R Sides of sloping upstand beams ditto M2 80 - To collection -
4/4/1
A
Sides of shear wall
M2
91
-
B
Sides of shear wall
M2
215
-
C
Sides of lift shaft wall
M2
49
-
D
Soffites of staircase landing
M2
27
-
E
Soffites of staircase sloping slab
M2
24
-
F
Soffites of sloping ramp
M2
133
- G
Edge of landing 175m high
M
11
- H Risers 150mm high
I
Sides of staircase stringer 300mm wide overall including cutting to profile of treads and risers.
Concrete Column Protection J 75mm x 75mm x 6mm thick galvanised mild steel angle
1000mm high with fixing lugs welded on back, cast into lower end of concrete columns at corners
To collection
Page No. 4/4/1
Page No. 4/4/2
M 73
M 12
No 196
- - - - - Total Carried to Summary at the End of Elements -
4/4/2
A
50mm diameter x 3mm thick mild steel hollow section handrail set on rake secretly welded to top of balusters Mild steel balustrade as described to Architect's details: Staircase
INTERNAL FINISHINGS
ELEMENT NO. 8 BILL NO. 4
(measured separately)
M
6
-
B C
Extra over for closed rounded end Ditto horizontal ditto
M No
2 7
-
-
D E
25mm diameter x 3mm thick mild steel hollow section raked middle rail and bottom rail welded to baluster Ditto for mitres
No
2
-
(measured separately)
F Ditto horizontal ditto
G 40mm diameter x 3mm mild stainless steel balusters 900mm high welded to top handrail, middle rail and bottom rails at
900mm centers; bottom end anchored in concrete treads (15 No.)
Prepare and apply one undercoat and two finishing coats of gloss oil paint in accordance with manufacturer's instructions to:
H Mild steel surfaces (balustrade both sides)
Parking Lines
I 25mm wide yellow parking lines painted with road paint
M 12
M 14
M 14
M2 23
M 402
-
-
-
-
-
Total Carried to Summary at the End of Elements -
4/8/1
A
50mm diameter x 3mm thick mild steel hollow section handrail set on rake secretly welded to top of balusters Mild steel balustrade as described to Architect's details: Staircase
EXTERNAL FINISHINGS
ELEMENT NO. 9
BILL NO. 4
(measured separately)
M
12
-
B
Ditto horizontal ditto
M
1
-
C
Extra over for closed rounded end
No
4
-
D E
25mm diameter x 3mm thick mild steel hollow section raked middle rail and bottom rail welded to baluster Ditto for mitres
No
4
-
(measured separately)
M
24
-
F G 40mm diameter x 3mm mild stainless steel balusters 900mm high welded to top handrail, middle rail and bottom rails at 900mm centers; bottom end anchored in concrete Ditto horizontal ditto M 1 - treads (15 No.) Prepare and apply one undercoat and two finishing coats of gloss oil paint in accordance with manufacturer's instructions to: M 14 - H Mild steel surfaces (balustrade both sides) M2 22 - Total Carried to Summary at the End of Elements 4/9/1
PROPOSED CONSTRUCTION OF UGANDA
- REVENUE AUTHORITY HEADQUARTERS
BUILDINGS AT NAKAWA
PARKING TOWER BILL NO. 4 LEVEL 5 SUMMARY OF ELEMENTS
Element No. 2: Superstructure
Element No. 8: Internal Finishings
Element No. 9: External Finishings
-
-
-
Total Carried to General Summary -
S
Item A Excavate oversite average 150mm deep to remove top Site Clearance, Excavations and Earthworks SUBSTRUCTURE (ALL PROVISIONAL) ELEMENT NO. 1 BILL NO. 4 PARKING TOWER PROPOSED CONSTRUCTION OF UGANDA REVENUE AUTHORITY HEADQUARTERS BUILDINGS AT NAKAWA Description Unit Quantity Rate, UGX. Amount USHS
vegetable soil and remove from site
M2
2,343
-
B
Excavate to reduce levels
M3
4,686
-
C Ditto not exceeding 1.5M deep from reduced level
D Ditto 1.5M - 3.0M deep ditto
E
Excavate pit for Column base not exceeding 1.5M deep starting from the basement floor level
F
Ditto pit for Column base exceeding 1.5M but not exceeding 3.0m deep ditto
G
Ditto pit for Column base exceeding 3.0M but not exceeding 4.5m deep ditto
H
Ditto pit for Lift Shaft not exceeding 1.5M deep starting from the basement floor level
I
Excavate pit for retaining wall base not exceeding 1.5M deep starting from the basement floor level
J
Ditto pit for retaining wall base exceeding 1.5M but not exceeding 3.0m deep ditto
K
Ditto pit for retaining wall base exceeding 3.0M but not exceeding 4.5m deep ditto
L Extra over lift pit excavation for forming embarkments
M
Extra over excavation for breaking up rock
M3 3,514
M3 3,514
M3 555
M3 555
M3 370
M3 12
M3 549
M3 549
M3 366
M3 80
M3
10
- - - - - - - - - -
正在阅读:
建筑类常见词汇,句子翻译06-22
Aroma compounds resulting from the acid-catalyzed breakdown of citral05-19
证券价值评估05-19
顽皮的小猫作文700字07-01
模拟商务谈判决赛案例05-15
二(1)班主任工作交流发言稿05-19
FreeBSD流量监控系统安装笔记04-03
数学人教版八年级上册相关资源 2.1二次根式的乘除 - 数学 - 初中03-22
第二轮面试问题(1)02-27
- 多层物业服务方案
- (审判实务)习惯法与少数民族地区民间纠纷解决问题(孙 潋)
- 人教版新课标六年级下册语文全册教案
- 词语打卡
- photoshop实习报告
- 钢结构设计原理综合测试2
- 2014年期末练习题
- 高中数学中的逆向思维解题方法探讨
- 名师原创 全国通用2014-2015学年高二寒假作业 政治(一)Word版
- 北航《建筑结构检测鉴定与加固》在线作业三
- XX县卫生监督所工程建设项目可行性研究报告
- 小学四年级观察作文经典评语
- 浅谈110KV变电站电气一次设计-程泉焱(1)
- 安全员考试题库
- 国家电网公司变电运维管理规定(试行)
- 义务教育课程标准稿征求意见提纲
- 教学秘书面试技巧
- 钢结构工程施工组织设计
- 水利工程概论论文
- 09届九年级数学第四次模拟试卷
- 建筑类
- 句子
- 词汇
- 常见
- 翻译
- 第五章《曲线运动》单元测试(人教版必修2)
- 安全施工管理方案
- 973项目申报书——2009CB941500-植物重要器官形成的遗传和表观遗
- 追寻聂绀弩的生命轨迹
- 版高中化学第1章有机化合物的结构与性质第1节认识有机化学学案鲁
- 2011黑龙江省会计人员入职最新考试试题库(完整版)
- 承压板锚索技术交底2
- 老业主情感维系活动方案
- 3.刘博:《蜕变与抉择,传统企业转型电商之路》
- 目标成本法的主要实施程序
- 镇总体规划说明书
- 网页设计习题
- 自考学前儿童特殊教育历年真题及答案
- 汽车电器与电控技术复习题
- 九年级(上)第13周周考数学试题(含部分参考答案)
- 人教版五年级上册平行四边形的面积教学设计
- 上庄 - 西柏坡
- 北朝诗人与北方少数民族文化关系研究
- 对省以下环保机构监测监察执法垂直管理制度的思考
- 苏教版三年级数学下册教案