SAP PP-SAP生产订单状态变更测试手册
更新时间:2024-03-19 17:19:01 阅读量: 综合文库 文档下载
- sap是什么意思呀推荐度:
- 相关推荐
SAP培训:http://www.51sap.cn
SAP生产订单状态变更测试手册
SAP生产订单状态变更测试手册
Business Solution
以标准的生产配置业务为背景。
Configure
生产业务配置-参照标准配置
1/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
Operation
技术性完成和关闭业务
维护生产订单-CO01
下达后的状态为:REL PRC GMPS MANC SETC
2/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
发料-MB1A
3/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
技术性完成-CO02
技术性完成是针对于订单不需要继续发料或者入库,直接进行结算的订单。
4/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
技术性完成后的状态:TECO PRC GMPS MANC SETC
技术性完成后,订单将不允许修改。如果希望取消技术性完成,可以直接取消。(是否允许跨月取消关闭??)
关闭订单-CO02
如果订单没有结算,直接关闭订单时,系统会提示余额不为0.
Balance of ORD 1000120 is not zero
Message no. KO115
Diagnosis
The balance on object ORD 1000120 is not zero. That is, there are still costs on the object.
System Response
The object cannot be closed and the deletion flag must not be set.
5/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
Procedure
Settle the object before you close it or set the deletion flag.
生产订单结算-KO88
6/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
7/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
可以看到系统产生的凭证中,借方为差异科目,贷方为原始发生业务的科目,而不是生产成本转出科目。
生产订单取消技术性完成-CO02
订单补发料-MIGO
8/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
9/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
重新生产订单技术性完成-CO02
重新结算-KO88
10/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
关闭订单-CO02
订单一旦关闭后,系统将不允许取消技术性完成。 CO02
11/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
取消关闭订单
取消技术性完成
订单锁定-CO02
只能在下达状态下才可以锁定生产订单。 CO02
12/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
订单状态:REL PRC LKD GMPS MANC NTUP SETC 订单锁定后不允许进行领料、入库、技术性完成等操作。
对生产订单发料-MIGO
系统会给出错误提示,不允许发料:
\
Message no. BS007
Diagnosis
The current status of object 'ORD 1000120' prohibits business transaction 'Goods Movement' ('RMWA').
Procedure
13/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
To process business transaction 'Goods Movement', you first have to change the status of object 'ORD 1000120' to allow the transaction 'Goods Movement'.
This gives you an overview of the system and user statuses that affect the transaction. A transaction can only be executed if there is at least one status that allows it and there is no status that forbids it. Transaction analysis
生产订单入库-MB31
不允许生产入库,系统给出错误提示:
Current order status 1000120 does not allow goods receipt
Message no. C6009
Diagnosis
You want to post a goods movement for an order. However, the present status of the order (for ex. \
Procedure
Change the status of the order (for example by releasing the order), so that you can post the goods movement.
总结
1. 生产订单的订单状态主要的顺序为:创建-》下达-》(锁定)-》技术性完成-》关闭。其
中锁定状态是根据需要操作的,不必一定要锁定。 2. 状态的取消需要按照从后往前的方式进行取消。
3. 锁定状态时,不允许进行领料、入库、技术性完成等操作。
4. 订单在技术性完成后将进行生产订单的结算,结算时借方科目为差异科目,贷方为成本
发生的源科目。
5. 订单只要取消技术性完成等操作恢复到下达状态,系统就可以进行正常的发料和入库。
14/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
SAP培训:http://www.51sap.cn
Sample
Reference 概念
Table
No. Table name Short Description Memo
End
15/15
Edited by 陆大春(Trigger Lau) at 2012-03-21 Version:1.0 For SAP ERP6.0 EHP5
正在阅读:
我的护蛋行动作文500字06-30
微生物习题12-09
激励小故事02-19
安徽干部教育在线党章知识测试题及答案11-22
电力系统静态稳定性分析05-22
2022年新高考政治主观题分类(经济生活+供给侧结构性改革)04-13
中国政法大学法律英语课程03-01
- 多层物业服务方案
- (审判实务)习惯法与少数民族地区民间纠纷解决问题(孙 潋)
- 人教版新课标六年级下册语文全册教案
- 词语打卡
- photoshop实习报告
- 钢结构设计原理综合测试2
- 2014年期末练习题
- 高中数学中的逆向思维解题方法探讨
- 名师原创 全国通用2014-2015学年高二寒假作业 政治(一)Word版
- 北航《建筑结构检测鉴定与加固》在线作业三
- XX县卫生监督所工程建设项目可行性研究报告
- 小学四年级观察作文经典评语
- 浅谈110KV变电站电气一次设计-程泉焱(1)
- 安全员考试题库
- 国家电网公司变电运维管理规定(试行)
- 义务教育课程标准稿征求意见提纲
- 教学秘书面试技巧
- 钢结构工程施工组织设计
- 水利工程概论论文
- 09届九年级数学第四次模拟试卷
- 变更
- SAP
- 订单
- 状态
- 手册
- 测试
- 生产
- PP