简阳市2012年中央财政预算内专项资金农村饮水安全项目工程(三星集中供水站)

监理工作报告

监理单位:四川省城市建设监理工程有限公司

2015年1 月 30日

工程名称:

简阳市2012年中央财政预算内专项资金农村饮水安全项目工程

批 准:

审 查:

编 写:

练兵

目 录

1 工程概况································································································ 3 1.1 工程简介 ····························································································· 3 1.1.1 工程位置 ················································································3 1.1.2 工程布置 ················································································3 1.2 工程建设相关单位 ······································································3 1.3 主要工程项目及工程量 ································································3 1.6 主要工程实施情况 ··············································································· 6 2 监理规划································································································ 7 2.1 监理工作依据 ······················································································ 7 2.2 监理范围 ····························································································· 7 2.3 监理目标 ····························································································· 8 2.3.1 投资目标 ················································································8 2.3.2 进度目标 ················································································8 2.3.3 质量目标 ················································································8 2.4 监理组织机构及监理人员配置 ······························································ 8 2.5 项目划分 ···································································· 错误!未定义书签。 3 监理过程································································································ 8 3.1 施工准备阶段监理工作 ········································································ 8 3.1.1 签发开工通知 ···················································································· 8 3.1.2组织设计交底 ····················································································· 8 3.1.3 审查施工单位的开工报审 ·································································· 8 3.1.4 参加第一次工地例会 ········································································· 9

3.1.5 组织监理实施细则交底 ······································································ 9 3.2 质量控制监理工作 ··············································································· 9 3.2.1 质量控制原则 ···················································································· 9 3.2.2 质量控制措施 ··················································································· 10 3.2.3 工程材料、构配件和设备的检测 ······················································· 10 3.3 投资控制监理工作 ·············································································· 11 3.3.1 工程计量 ························································································· 11 3.3.2 工程变更后的投资控制 ············································· 错误!未定义书签。 3.3.3 主要投资控制措施 ···················································· 错误!未定义书签。 3.3.4 完工决算 ································································· 错误!未定义书签。 3.4 进度控制监理工作 ·············································································· 12 3.4.1 进度控制原则 ··················································································· 12 3.5 竣工(完工)验收监理工作································································· 13 3.6 施工合同管理 ····················································································· 13 3.7 信息管理工作 ····················································································· 13 3.8.3协调好参建各方的关系 ··············································· 错误!未定义书签。 4 监理效果······································································· 错误!未定义书签。 4.1 质量控制效果 ····························································· 错误!未定义书签。 4.2 进度控制效果 ····················································································· 14 4.3 投资控制效果 ····························································· 错误!未定义书签。 5 经验 ···································································································· 14 5.1 经验 ··································································································· 14

简阳市2012年中央财政预算内专项资金农村饮水安全项目工程

建设监理竣工报告

1 工程概况

1.1 工程简介 1.1.1 工程位置

该项目位于简阳市三星镇,本工程饮水安全项目受益范围:本项目规划解决简阳市三星镇区,同合乡,宏缘乡,新星乡,踏水镇,青龙乡,平武镇,平窝乡,及禾丰镇等9个乡镇,共计61个村,7个场镇人的100382人口饮水。玉成乡至草池镇的管网延伸工程1处,通过改、扩建配水管网,本项目全镇用水纳入水厂供水区,以解决村民用水问题。项目建成后总受益人口为116210人,其中改善用水人口100382人,新解决用水人口15828人。项目总投资合同价款为20170670.00元。 1.1.2 工程布臵

1.1 工程建设相关单位

项目法人:简阳市水务局

设计单位:四川大学工程设计研究院

监理单位:四川省城市建设监理工程有限公司 承建单位:四川佳和建设工程有限公司 1.2 主要工程项目及工程量

2.1厂区工程

1、坪场、土石方开挖、坚石爆破、回填。

2、综合办公楼、门窗、护栏、通风排气、水电安装、室内外装修。

3、加氯间、门窗、航吊、通风排气、水电安装、机械设备安装、室内外装修。 4、加药间、门窗、航吊、通风排气、水电安装、机械设备安装、室内外装修。 5、机电房、门窗、通风排气、水电安装、机械设备安装、室内外装饰 6、仓库、门窗、通风排气、水电安装、室内外装饰

7、取水井、取水泵房、配电房门窗、通风排气、水电安装、机械设备安装、室内外装饰 8、配水井、管道安装、外墙装饰 9、无阀动滤池、管道安装、外墙装饰 10、沉淀池、管道安装、外墙装饰 11、清水池、管道安装、外墙装饰

12、回水池、回流泵房、排水池、管道安装、、门窗、通风排气、水电安装、室内外装饰 13、厕所、化粪池、管道安装、、门窗、通风排气、水电安装、机械设备安装、室内外装饰