品质管理相关的英文及缩写大全
更新时间:2024-03-09 08:42:01 阅读量: 综合文库 文档下载
- 品质管理的英文术语推荐度:
- 相关推荐
品质管理相关的英文及缩写大全
部门名称的专有名词
QS: Quality system品质系统 CS: Customer Serves 客户服务 QC: Quality control品质管理
IQC:Incoming quality control 进料检验 LQC:Line Quality Control 生产线品质控制 IPQC:In process quality control 制程检验 FQC: Final quality control 最终检验 OQC: Outgoing quality control 出货检验
QA: Quality assurance 品质保证
SQA: Source(supplier) Quality Assurance 供应商品质保证(VQA) CQA:Customer Quality Assurance客户质量保证 PQA: process Quality Assurance 制程品质保证 QE:Quality engineer 品质工程
CE:component engineering零件工程 EE:equipment engineering设备工程 ME:manufacturing engineering制造工程 TE:testing engineering测试工程 PPE roduct Engineer 产品工程
IE:Industrial engineer 工业工程 ADM: Administration Department行政部 RMA:客户退回维修 CSDI:检修
PC:producing control生管 MC:mater control物管
GAD: General Affairs Dept总务部 A/D: Accountant /Finance Dept会计 LAB: Laboratory实验室 DOE:实验设计 HR:人资 PMC:企划 RD:研发 W/H:仓库
SI:客验
PD: Product Department生产部 PA:采购(PUR: Purchaing Dept)
SMT:Surface mount technology 表面粘着技术 MFG:Manufacturing 制造
MIS:Management information system 资迅管理系统 DCC:document control center 文件管制中心 厂内作业中的专有名词
QT:Quality target品质目标 QP:Quality policy目标方针
QI:Quality improvement品质改善 CRITICAL DEFECT:严重缺点(CR) MAJOR DEFECT:主要缺点(MA) MINOR DEFECT:次要缺点(MI) MAX:Maximum最大值 MIN:Minimum最小值 DIA iameter直径
DIM imension尺寸
LCL:Lower control limit管制下限 UCL:Upper control limit管制上限
ECN:工程变更
ECO:Engineering change order工程改动要求(客户) ECR:工程变更需求单
CPI:Continuous Process Improvement 连续工序改善 Compatibility:兼容性 Marking:标记 DWG rawing图面
Standardization:标准化 Consensus:一致 Code:代码
ZD:Zero defect零缺点 Tolerance:公差
Subject matter:主要事项 Auditor:审核员
BOM:Bill of material物料清单 Rework:重工
ID:identification识别,鉴别,证明
PILOT RUN: (试投产) FAI:首件检查
FPIR:First Piece Inspection Report首件检查报告
FAA:首件确认
SPC:统计制程管制
CP: capability index(准确度)
CPK: capability index of process(制程能力) PMP:制程管理计划(生产管制计划) MPI:制程分析
DAS: Defects Analysis System 缺陷分析系统 PPB:十亿分之一 Flux:助焊剂 P/N:料号
L/N:Lot Number批号 Version:版本 Quantity:数量
Valid date:有效日期
MIL-STD:Military-Standard军用标准 ICT: In Circuit Test (线路测试)
ATE:Automatic Test Equipment自动测试设备 MO: Manafacture Order生产单 T/U: Touch Up (锡面修补) I/N:手插件
P/T:初测
F/T: Function Test (功能测试-终测) AS 组立 P/K:包装
TQM:Total quality control全面品质管理
MDA:manufacturing defect analysis制程不良分析(ICT) RUN-IN:老化实验 HI-pot:高压测试
FMI:Frequency Modulation Inspect高频测试 DPPM: Defect Part Per Million
(不良率的一种表达方式:百万分之一) 1000PPM即为0.1% Corrective Action: (CAR改善对策) ACC:允收 REJ:拒收
S/S:Sample size抽样检验样本大小
SI-SIV:Special I-Special IV特殊抽样水平等级 CON:Concession / Waive特采 ISO:国际标准化组织
ISA:Industry Standard Architecture工业标准体制结构 OBA:开箱稽核 FIFO:先进先出 PDCA:管理循环
Plan do check action计划,执行,检查,总结 WIP:在制品(半成品)
S/O: Sales Order (业务订单) P/O: Purchase Order (采购订单) P/R: Purchase Request (请购单)
AQL:acceptable quality level允收品质水准 LQL;Limiting quality level最低品质水准 QVL:qualified vendor list合格供应商名册
AVL :认可的供货商清单(Approved Vendor List) QCD: Quality cost delivery(品质,交期,成本) MPM:Manufacturing project management制造专案管理 KPI:Key performance indicate重要绩效指标
MVT:Manufacturing Verification Test制造验证试产 Q/R/S:Quality/Reliability/Service质量/可靠度/服务 STL:ship to line(料到上线) NTF:No trouble found误判
CIP:capacity improvement plan(产能改善计划) MRB:material review board(物料审核小组) MRB:Material reject bill退货单 JIT:just in time(即时管理)
5S:seiri seiton seiso seiketsu shitsuke (整理,整顿,清扫,清洁,修养)
SOP:standard operation process(标准作业程序) SIP:Specification inspection process制程检验规格 TOP: Test Operation Process (测试作业流程) WI: working instruction(作业指导书)
SMD:surface mounting device(表面粘着原件) FAR:failure aualysis report故障分析报告 CAR:Corrective action report改善报告
BPR: 企业流程再造 (Business Process Reengineering) ISAR :首批样品认可(Initial Sample Approval Request)- JIT:实时管理 (Just In Time)
QCC :品管圈 (Quality Control Circle) Engineering Department (工程部)
TQEM: Total Quality Environment Management
(全面品质环境管理)
PD: Production Department (制造) LOG: Logistics (后勤支持) Shipping: (进出口)
AOQ:Average Output Quality平均出货质量
AOQL:Average Output Quality Level平均出货质量水平 FMEA:failure model effectiveness analysis失效模式分析 CRB: Change Review Board (工程变更会议)
CSA:Customer Simulate Analysis客户模拟分析
SQMS:Supplier Quality Management System供应商品质管理系统 QIT: Quality Improvement Team 品质改善小组 QIP:Quality Improvement Plan品质改善计划 CIP:Continual Improvement Plan持续改善计划
M.Q.F.S: Material Quality Feedback Sheet (来料品质回馈单) SCAR: Supplier Corrective Action Report (供货商改善对策报告) 8D Sheet: 8 Disciplines sheet ( 8D单)
PDCA:PDCA (Plan-Do-Check-Action) (管理循环) MPQ: Material Packing Quantity (物料最小包装量)
DSCN: Delivery Schedule Change Notice (交期变更通知) QAPS: Quality Assurance Process Sheet (品质工程表)
正在阅读:
品质管理相关的英文及缩写大全03-09
我们班的新变化作文500字07-01
秋天的赞歌作文450字06-23
澳大利亚留学签证怎么做防止拒签05-17
2010学年度第二学期静安区高一地理学习能力测试卷(新) - 图文01-12
曲线的几何变换课程设计报告书10-19
药物经济学说课稿03-18
- 多层物业服务方案
- (审判实务)习惯法与少数民族地区民间纠纷解决问题(孙 潋)
- 人教版新课标六年级下册语文全册教案
- 词语打卡
- photoshop实习报告
- 钢结构设计原理综合测试2
- 2014年期末练习题
- 高中数学中的逆向思维解题方法探讨
- 名师原创 全国通用2014-2015学年高二寒假作业 政治(一)Word版
- 北航《建筑结构检测鉴定与加固》在线作业三
- XX县卫生监督所工程建设项目可行性研究报告
- 小学四年级观察作文经典评语
- 浅谈110KV变电站电气一次设计-程泉焱(1)
- 安全员考试题库
- 国家电网公司变电运维管理规定(试行)
- 义务教育课程标准稿征求意见提纲
- 教学秘书面试技巧
- 钢结构工程施工组织设计
- 水利工程概论论文
- 09届九年级数学第四次模拟试卷
- 英文
- 缩写
- 品质
- 相关
- 大全
- 管理
- 2019 - 2020学年高二英语上学期期中试题
- LINGO使用说明(比较简单)
- 合同范本之个体工商户租房合同
- 毕业设计注塑机PLC控制 - 图文
- 2019-2020最新苏教版1年级上册期末试卷(7)
- 小学美术读书笔记
- 保利中韵花园测量放线方案
- 冬阳童年骆驼队第一课时教学设计
- 交换机802.1x配置
- 股票走势易理分析
- 书香校园建设汇报材料
- 生物化学 糖代谢习题
- 中部污水处理厂广州环境保护局
- 《逐帧动画》课件设计制作解析
- 2017-2022年中国多功能抑尘车市场发展战略及投资前景预测咨询报
- GB6944-2005危险货物分类和品名编号
- 《纳税实务操作实训》课程标准
- 人民币升值负面影响之我见
- 2016年10月浙江省技术选考试卷 - 图文
- 八年级政治上册 第6课合奏好生活的乐章夯基达标训练 鲁教版