桥梁标准化 - 图文

更新时间:2024-07-09 11:26:01 阅读量: 综合文库 文档下载

说明:文章内容仅供预览,部分内容可能不全。下载后的文档,内容与下面显示的完全一致。下载之前请确认下面内容是否您想要的,是否完整无缺。

目 录

第一章 人工挖孔桩······················································································································································································································································································· 第一节 人工挖孔桩开挖示意图······························································································································································································································································ 第二节 孔口安全防护················································································································································································································································································ 第二章 第一节第二节第三章 第一节第二节第四章 第一节第五章 第一节第六章 第一节第七章 第一节

泥浆池································································································································································································································································································ 泥浆池平面布置示意图······························································································································································································································································ 泥浆池临边防护 ··········································································································································································································································································· 水上作业平台 ·················································································································································································································································································· 水上作业平台断面图 ·································································································································································································································································· 水上作业平台的安全防护 ························································································································································································································································· 墩柱盖梁施工平台 ········································································································································································································································································· 盖梁施工平台示意图 ·································································································································································································································································· 桥梁通道 ··························································································································································································································································································· 桥梁通道示意图 ··········································································································································································································································································· 桥面临边防护 ·················································································································································································································································································· 桥面临边防护示意图 ·································································································································································································································································· 上下桥面人行斜道 ········································································································································································································································································· 上下桥面人行斜道示意图 ·························································································································································································································································

1

第一章 人工挖孔桩 第一节 人工挖孔桩开挖示意图

说明:

1、孔桩开挖过程中,必须有专人巡视各开挖桩孔的施工情

况,,严格做好安全监护。

2、挖孔、起吊、护壁、余渣运输等所使用的一切设备、设

施、安全装置(含防毒面具)、工具、配件、材料和个人 防护用品等,必须经常检查,做好管、用、养、修、换, 确保完好率和使用安全度。

3、当桩径小于(或等于)1.2米时,每次下孔作业前必须 先通风,作业过程中必须保持继续通风。

4、开挖过程中,必须及时施作护壁,第一节护壁应高出孔 口不小于25厘米。

5、挖出的土石方应及时运走,孔口周边2米范围内不得堆 放孔渣及杂物,机动车辆通行时,应做出预防措施或暂 停孔内作业。

6、当桩孔开挖深度超过5米,每天开工前应进行有毒气体检测;遇到不良地质时,应采取相应措施以防塌孔。

1

第二节

孔口安全防护

说明:

1、钢管护栏四周密布安全网,红白色油漆间距30厘米。 2、钢管立柱每2米设置一根;护栏横杆设置两道,其中第 一道距地面60厘米,上下横杆间距60厘米。

红白色油漆粉刷,间距300

安全网基础埋入土体300-5002

第二章 泥浆池

第一节 泥浆池平面布置示意图

说明:

1、本图尺寸仅为示意,泥浆池的平面尺寸及容量应根据工程需要确定。 2、泥浆池基础需设置在稳定的地质上,如在城市施工,则应将泥浆池底部硬化并采取措施防止泥浆外溢。

3、在循环池和沉淀池中间隔墙上设空洞以连通两池。

旱地和浅水面钻孔桩泥浆池示意图铁路红线墩台墩台钻孔桩平台泥浆池钻孔桩平台铁路红线施工便道钻孔桩平台钻孔桩平台安全安全防护防护浅水、芦苇地,旱地地方围栏围栏换填片石或毛渣填土筑岛原地面水位面泥浆池3

第二节

泥浆池临边防护

说明:

1、泥浆开挖后立既进行防护,泥浆池采用钢管或竹杆沿泥 浆池四周布置安全防护围网,围网高度1.2米左右,要求所

有泥浆池防护网高度一致。

2、竹杆外面采用蓝色的细网围裹,上面围设小彩条旗,外 挂安全标志牌。 3、钻孔时,钻孔循环泥浆必须在钻孔平台上挖出排放沟,

沟深0.3米左右,沟宽0.3米左右,在灌注前,因排浆量较 大,必须加深或沟侧堆码一定的高度约30厘米高;在不使

用时,将沟填平,必要时可以在钻孔下根桩基循环利用。 4、所有钻机的泥浆管当有损坏时,必须进行修整或更换新 管,保证在施工时泥浆不从损坏处漏出,倒处排放。

5、泥浆池中的泥浆装满后用泥浆车拉运出去,在抽浆时, 泥浆车停放位置处不得出现漏浆现象。

泥浆池临边防护

4

第三章 水上作业平台 第一节 水上作业平台横断面图

钢平台横断面图12#槽钢钢管36a#槽钢盒拉森Ⅲ钢板桩密排36a#槽钢 说明:

1、水上作业平台的结构设计应经过计算确定,并进行静载试验验证,以满足施工要求。

5

第二节 水上作业平台的安全防护

说明:

1、平台四周设置防护栏杆,栏杆高1.2米,钢管立柱间距2.0米;

横杆间距0.5米,护栏外挂密目安全网。

2、平台上的电气设备必须使用“三相五线制”和“三级配电两级

保护” 电线(缆)必须按要求架设,不得随地拖拉,各类配电箱 要安装在适当的位置,并进行防护。

3、为防止过往船只及施工船只撞击施工平台,平台首尾须设置航

标灯、信号旗及防撞装置。另外,要密切观测平台处钢管桩的冲刷 情况,必要时进行二次抛石防护。

4、为确保平台和施工人员的安全,每时每刻注意与气象部门的气

象信息,如遇大风、台风等恶劣天气和海况,严禁作业。

防护栏平台水水上作业平台6

第四章 墩柱盖梁施工平台 第一节 盖梁施工平台示意图

2、为保证人员上下的安全,须搭设专用人行步梯。

型工字钢千斤顶千斤顶防护栏

安全网枋木@2010工字钢@30大块钢模施工平台型工字钢墩柱Φ90实心钢棒墩柱楼梯说明:1、本图盖梁施工平台仅为示意,应根据工程实际情况进行盖梁施工平台的设计。 3、盖梁施工平台的临边防护参见“第三章第二节”的“水上作业平台的安全防护”。

7

第五章 桥梁通道 第一节 桥梁通道示意图

说明:

1、 本图仅为示意,应根据工程的实际受力情况进行通道结构设计。

2、 通道两侧应设置限高、限宽及限速标志。

3、 通道两侧须设置防撞墙,以免过往

车辆碰撞支架体系。

4、 通道两侧及顶部应设置至少3道安

全防护网,以免高空坠物伤及行人及过往车辆。

5、 通道两侧的临边安全防护参见“第三章第二节”的“水上作业平台的

安全防护”。

箱梁底板底模板次梁主横梁门洞主横梁2Ⅰ10门洞纵梁10小横梁顶托顶托调节螺帽通道

通道

钢管支架×××8

ⅠⅠ

第六章 桥面临边防护 第一节 桥面临边防护示意图

说明:

1、 在施工桥梁防撞墙之前,应对桥面进行临边防护。 2、 桥面临边防护设施采用钢管+安全网。 3、 钢管立柱高1.2米,立柱间距2.0米,每3根立柱设置一道斜撑。斜撑与桥面通过预埋钢筋连接。

4、 横杆间距0.5米,共3道;防护栏杆外挂密目安全网。

安全网防护栏杆桥面防护栏杆安全网桥面9

第七章 上下桥面人行通道 第一节 人行通道示意图

说明: 1、上人通道应横平竖直并分布均匀,楼梯步距应保

持一致,横杆外露长度应保持一致且不得超过100mm。

2、斜道应满铺脚手板,脚手板上每隔300mm设置一根防滑木条。

3、上下人斜道宽度不小于1m,坡度宜采用1:3。休

息平台宽度不应小于斜道宽度。运料斜道宽度不宜小于1.5m,坡度宜采用1:6.。上人斜道两侧应设置踢脚板和双道防护栏杆(上道栏杆高度1.2m,中栏杆居中设置。踢脚板高度180mm,栏杆和踢脚板表面刷红白警示色油漆)。

4、斜道外侧挂密目安全网封闭。斜道的侧立面应设置剪刀撑。

5、斜道的基础与外脚手架基础设置一致。斜道连墙件设置方法按照开口型脚手架要求设置。

桥面桥面上下桥面人行斜道10

第七章 上下桥面人行通道 第一节 人行通道示意图

说明: 1、上人通道应横平竖直并分布均匀,楼梯步距应保

持一致,横杆外露长度应保持一致且不得超过100mm。

2、斜道应满铺脚手板,脚手板上每隔300mm设置一根防滑木条。

3、上下人斜道宽度不小于1m,坡度宜采用1:3。休

息平台宽度不应小于斜道宽度。运料斜道宽度不宜小于1.5m,坡度宜采用1:6.。上人斜道两侧应设置踢脚板和双道防护栏杆(上道栏杆高度1.2m,中栏杆居中设置。踢脚板高度180mm,栏杆和踢脚板表面刷红白警示色油漆)。

4、斜道外侧挂密目安全网封闭。斜道的侧立面应设置剪刀撑。

5、斜道的基础与外脚手架基础设置一致。斜道连墙件设置方法按照开口型脚手架要求设置。

桥面桥面上下桥面人行斜道10