FEHSP-4.4.6-04 New Project EHS Management 新项目EHS管理程序
更新时间:2023-04-15 18:04:02 阅读量: 实用文档 文档下载
- 富尔豪斯牌型推荐度:
- 相关推荐
TITLE: New Project EHS Management Procedure 标题:新项目EHS管理程序DOC No.: FEHSP-4.4.6-04 REV:C
Page 1 of 4
Confidential & Proprietary Information of Xxx (Xxx)Revision History 更改记录
REV 版本CHANGE
更改内容
WRITTEN
编写
DATE
日期
A
B
C
Initial Release
Update procedure format
Update Scope 2.1procedure 6.4
March,21th 2006
June 8,2010
2011.12.6
Check & Approval
检查和批准栏
SIGNA TURE DATE SIGNATURE DATE 签名日期签名日期
Originator Program/Project
起案者 xxx 2013-8-1 项目部 xxx 2013-8-20 A
Quality Materials
质量部 xxx 2013-8-22 物料部 xxx 2013-8-22 A
IT/IS HR 资讯部 xxx 2013-8-20 人事部 xxx 2013-8-20 A
Ops. Eng.
运作部 xxx 2013-8-20 工程部 xxx 2013-8-20 A
Facility Logistics
厂务 xxx 2013-8-20 物流部 xxx 2013-8-20 A
BE Finance
卓越运营部 xxx 2013-8-20 财务部 xxx 2013-8-20 GM
总经理 N/A N/A A
Checked by DCC: Date:
文控审核: xxx A 日期: 2013-8-22 A
TITLE: New Project EHS Management Procedure
标题: 新项目EHS 管理程序 DOC No.: FEHSP-4.4.6-04 REV :C Page 2 of 4 Confidential & Proprietary Information of Xxx (Xxx)
1. Purpose (目的)
The organization established this profile to strengthen the environmental management of the construction item of the organization and protect environment and control pollution according to ‘P.R.C. environmental protection law ’, ‘Environment protection management statute of construction item in China ’, ‘About Potentiate Environment
protection management s’ regulation of construction item in Jiangsu ’, etc..
为加强和规范组织的建设项目的环境管理,坚持在发展生产的同时保护环境,严格控制新的污染,根据《中华人民共和国环境保护法》、《建设项目环境保护管理条例》、《江苏省关于加强建设项目环境保护管理的若干规定》等有关法律、法规,结合本公司的实际情况,特制定本程序。
2. Scope (范围)
2.1 All the newly built, rebuilt and enlarging construction project and technical rebuilt construction, as well as new
equipment and new line set up.
适用于组织的一切新建、改建、扩建及技术改造工程建设项目,新设备和线体的建设。
2.2 From the writing of propositional plan to the construction project to be made use of formally
适用于上述工程建设项目由项目建议书(含立项)开始,直至项目建成正式投产,使用。
3. Definitions (定义)
EHS – Environment, Health and Safety 环境健康安全
4. Responsibility (职责)
4.1 ENG department is responsible for carrying on construction propositional plan, feasibility research and the
environmental management from the design, constructing, complete and check and accept period of the construction project.
工程部负责落实项目建议书、可行性研究及设计阶段的环保管理。
4.2 ENG department is responsible for the environmental management during the constructing and check and accept
period.
工程部负责施工和竣工验收阶段的环境管理。
5. Process Flow Chart 流程图
N/A
6. Procedure (程序)
6.1 Environmental management of feasibility research on construction period.
程序可行性研究阶段的环境管理。
6.1.1 Construction project should be devolved upon qualified design institution that is familiar with the production
techniques to compile the ‘Feasibility research report’.
TITLE: New Project EHS Management Procedure
标题: 新项目EHS 管理程序
DOC No.: FEHSP-4.4.6-04 REV :C Page 3 of 4 Confidential & Proprietary Information of Xxx (Xxx)
本项目委托熟悉本公司生产工艺同时又具有相关资格的设计院编写《可行性研究报告》。
i. Contents on environmental protection should be writte n into ‘Feasibility research report’. Contents as
follows
ii. should be included: environmental pollution father, Labor safety and sanitation basis.
在《可行性研究报告》中,应有环境保护章(节)。环保章(节)中,必须具有下列内容:环境污染治理、劳动安全和卫生设施依据。
6.1.3 Construction design should be c arried though after ‘Feasibility research report’ authorized by governmental
protection department and other related departments.
在《可行性研究报告》经政府环保部门和相关部门批准后方可进行项目设计。
6.2 Environmental management of constructing design period.
设计阶段的环境管理
6.2.1 Primary design ‘Environmental impact report table’ should be composed at this period. The output of main product
and raw material, flow of produce techniques, pollution condition, measure and effect of pollution should be included.
首先进行初步设计。在初步设计中必须编制《环境影响报告表》,表中反应主要产品之产量,主要原料用量,生产工艺流程,污染物情况,治理措施,治理效果等。
6.2.2 Constructing design should be carried through after the primary design authorized by governmental environmental
protection department.
在初步设计经政府环保管理部门审查批准后方可进行施工图设计。
6.2.3 Design institution should make sure the shop drawing related to environmental protection to be carried on according
to primary design, so that the environmental equipment and other equipment could be worked on at the same time in the future.
设计单位必须根据初步设计环境保护章节内容、审查和批复意见,认真落实有关环保的施工图设计,确保环境保护设施与主体设施同时施工的要求。
6.2.4 Shop drawing should be delivered to governmental environmental protection department to be checked. The
construction mustn’t be started working before the organization acquires the license.
施工图完成后,必须再送政府环保管理部门审查,并获得《建设项目环境保护“三同时”管理审核通知单》后才能取得《建设工程规划许可证》,才能办妥其它有关前期手续,否则,不能开工。
6.3 Environmental management of constructing period 施工阶段的环境管理
6.3.1 The procedures including ‘Construction license’ should be finished before constructing .
施工前,必须办妥《施工许可证》等一切有关手续。
6.3.2 During the constructing, the organization should pay attention to protecting environment and preventing dust, noise,
sewage, vibrancy to pollute the environment.
施工过程中,必须注意保护现场周围的环境,防止粉尘、噪声、污水、振动等对周围环境造成污染和危害。
6.3.3 The organization should supervise the builder to adopt measure to protect environment and manage the architectural
garbage, noise, and sewage suitably.
在施工中,按照政府环保、环卫部门之规定和要求,督促施工单位采取相应的措施,做好各项环保工作,处理好建筑垃圾、噪声、污水等。
6.3.4 All the environmental equipment and establishment should be carried on according to ship drawing.
按照设计图纸落实各项环保设备和设施,按设计搞好绿化工程。
6.4 Environmental management of check and accept the completed construction project period.
TITLE: New Project EHS Management Procedure
标题: 新项目EHS 管理程序 DOC No.: FEHSP-4.4.6-04 REV :C Page 4 of 4 Confidential & Proprietary Information of Xxx (Xxx)
竣工验收阶段的环境管理。
6.4.1 The construction project should be firstly checked and accepted by EHS and then deliver to governmental
environmental protection department to do check and accept.
工程竣工后,先经环境健康安全部门验收,再报政府环保部门进行竣工验收。
6.4.2 Monitor testing, such as sewage, exhausted gas, noise, should be carried on. All the pollution should be discharged
under the standard of legal and the offal should be managed suitable.
按照要求进行相关监测试验,如生活污水、废气、噪声等的测试数据,一定要达到排放标准,做好废弃物的处理工作。
6.4.3 Virescence and factory show should be carried on. 搞好绿化管理和厂容厂貌管理,美化环境。
6.4.4 Environmental design document, information and other files should be suitably safe kept.
做好环保设计文件、资料的整理、建档工作。
6.4.5 Construction project should be made use of formally after its environmental equipment have been checked and
accepted eligibly. The environmental equipment should be managed and checked in corresponding range.
建设项目环保设施竣工验收合格,项目方可投入正式生产和使用。环保设施则应纳入相应的管理和考核范畴。
6.4.6 Notify EHS for evaluation after the new production line or new coming equipment set up.
新建线体,新采购设备架设完成后通知EHS 做评估确认。
7. Reference (参考)
7.1 P.R.C. environmental protection law 中华人民共和国环境保护法
7.2 Environment protection management statute of construction item in China
建设项目环境保护管理条例
7.3 About Potentiate Environment protection management s’ regulation of construction item in Jiangsu
江苏省关于加强建设项目环境保护管理的若干规定
8. Records and Limited Time (记录及保存年限)
N/A
9. Training (培训)
Facilty, QA, HR department relevant employees must be training.
厂务/质量/人事部门相关雇员必须被培训。
10. Attachments (附录)
N/A
正在阅读:
FEHSP-4.4.6-04 New Project EHS Management 新项目EHS管理程序04-15
基督教结婚誓词中英文02-20
汽车自动变速器结构原理与故障分析06-05
整数规划12-09
道路勘测设计试卷和答案,题库04-19
心灵窗外的战争与和平作文500字07-09
物联网与GIS的结合01-22
指挥中心二期工程创优计划2 - 图文04-06
- 教学能力大赛决赛获奖-教学实施报告-(完整图文版)
- 互联网+数据中心行业分析报告
- 2017上海杨浦区高三一模数学试题及答案
- 招商部差旅接待管理制度(4-25)
- 学生游玩安全注意事项
- 学生信息管理系统(文档模板供参考)
- 叉车门架有限元分析及系统设计
- 2014帮助残疾人志愿者服务情况记录
- 叶绿体中色素的提取和分离实验
- 中国食物成分表2020年最新权威完整改进版
- 推动国土资源领域生态文明建设
- 给水管道冲洗和消毒记录
- 计算机软件专业自我评价
- 高中数学必修1-5知识点归纳
- 2018-2022年中国第五代移动通信技术(5G)产业深度分析及发展前景研究报告发展趋势(目录)
- 生产车间巡查制度
- 2018版中国光热发电行业深度研究报告目录
- (通用)2019年中考数学总复习 第一章 第四节 数的开方与二次根式课件
- 2017_2018学年高中语文第二单元第4课说数课件粤教版
- 上市新药Lumateperone(卢美哌隆)合成检索总结报告
- 新项目
- Management
- EHS
- Project
- 程序
- FEHSP
- 管理
- 4.4
- New
- 04
- 广西壮族自治区义务教育学籍卡
- 自贡市第十四中学校校本研修3年规划实施方案
- (完整版)中考英语阅读理解简答题的答题技巧
- 银行春天行动工作总结通用版
- 三年级下册乘法除法两步计算解决问
- 济南西车辆段驻港列检所丙班QC小组2004-2005年度QC课题
- 2015年高考物理试题分类汇编20个模块专题汇总(解析)
- 煤矿安全大反思材料
- 操作系统磁盘调度算法ava
- 元旦晚会主持人演讲稿汇总6篇
- 私募股权投资基金募集说明书
- 湖北省北大附中武汉为明实验学校八年级英语下册 Unit 4 Why don
- 人教中考数学二模试题分类汇编——反比例函数综合含答案解析
- 交通银行借款合同(合同范本)
- 临沂市中考信息技术操作题指导
- 高一英语百日训练之 阅读理解(78)含答案详解
- 2022年西安工业大学817思想政治教育学原理之陈万柏、张耀灿《思
- 第十一届宿舍文化节策划书
- 先进会计工作者候选人推荐表
- (新)美容院节日邀约标准话术