HP_C7000机箱快速安装指南
更新时间:2023-04-17 20:43:02 阅读量: 实用文档 文档下载
- hp c7000推荐度:
- 相关推荐
HP BladeSystem c7000 Enclosure Quick Setup Instructions
41762-401
Part Number 1
2
3
Site requirements
Select an installation site that meets the detailed installation site requirements described in the server user guide on the Documentation CD and on the HP website (5d1b9d7401f69e3143329427). Verifying the pallet contents * Not shown
4
Installing the enclosure
WARNING: Because the fully-populated enclosure can weigh up to 217.7 kg (480 lb), remove all components and the rear cage from the enclosure before removing the enclosure from the pallet to reduce the risk of personal injury when moving the enclosure.
CAUTION: When removing the rear cage and midplane assembly, the connectors on the midplane assembly are susceptible to damage. Use caution to avoid damage to the pins and connectors.
CAUTION: Be sure the hinges are completely open before installing the rear cage into the enclosure. Failure to do so can cause damage to pins and connectors.
1. The enclosure can be installed in a rack or rack-free environment.
Select the proper location based on requirements detailed in the HP BladeSystem c7000 Enclosure Setup and Installation Guide.
2. Remove all components from the front and rear of the enclosure,
and then remove the rear cage.
3. (Optional) Install the enclosure into a rack. See the HP BladeSystem c7000 Enclosure Rack Template. For rack-free installations, omit this step.
5
4. Install the rear cage into the enclosure, close the hinges, and
tighten the thumbscrews.
Enclosure bay identification Before installing front or rear components into the enclosure, review
enclosure bay numbering for each component. Full-height device bay numbering
Half-height device bay numbering
Power supply bay numbering Fan bay numbering
Installing the front components
CAUTION: To prevent improper cooling and thermal damage, do not operate the enclosure unless all bays are populated with a component or a blank.
6
CAUTION: Do not mix HP 2250W, HP 2400W High Efficiency, HP BL7000 2400W Platinum, or -48vDC power supplies in one enclosure. Install only one type of power supply in a single enclosure.
If your HP BladeSystem c7000 Enclosure is equipped with a three-phase power configuration, you need six power supplies. To install a power supply: 1. To gain access to all power supply bays, slide the HP BladeSystem Insight Display to the right or left as needed. 2. Remove the power supply blank.
3.
Insert the power supply into the enclosure, and then close the power supply bracket.
NOTE: This document discusses installation of AC power supplies only. For information on configuring DC power
supplies or HP Carrier Grade Solutions, see the documentation that came with your power supply.
4.
Add any ordered options to each server blade: o Additional processor o Additional memory o Mezzanine option cards
5.
(Optional) If you are installing a full-height device, remove the half-height device bay shelf. If you are installing a half-height device, omit this step.
6. Remove the connector covers.
7. Install the server or storage blades.
8.
Install device bay blanks into any unused device bays. If the empty bays are configured for a full-height device, join two device bay blanks to create a full-height blank.
7
Installing the rear components
CAUTION: To prevent improper cooling and thermal damage, do not operate the enclosure unless all bays are populated with a component or a blank.
1.
Install fans in even-numbered groups, based on the total number of blades installed in the enclosure:
o Four fan configuration—Fan bays 4, 5, 9, and 10 are used
to support a maximum of two devices located in device bays 1, 2, 9, or 10. Only two device bays can be used with four fans. o Six fan configuration—Fan bays 3, 4, 5, 8, 9, and 10 are
used to support devices in device bays 1, 2, 3, 4, 9, 10, 11, or 12. o Eight fan configuration—Fan bays 1, 2, 4, 5, 6, 7, 9, and
10 are used to support devices in all device bays.
o Ten fan configuration—All fan bays are used to support
devices in all device bays.
NOTE: When installing a fan in the top row of fan bays, orient the fan so that the LED is in the lower right corner. When installing a fan in the bottom row of fan bays, orient the fan so the LED is in the upper left corner.
2. Install fan blanks in any unused fan bays.
3.
Install the Onboard Administrator with KVM modules into the
Onboard Administrator with KVM tray based on the total number ordered:
o One Onboard Administrator with KVM module: Bay 1 o Two Onboard Administrator with KVM modules: Bays 1 and 2
Install an Onboard Administrator with KVM blank into any unused Onboard Administrator with KVM bay.
Connecting the cables
1.
Identify all connectors.
8
2.
To connect to the management network, connect a standard CAT5 patch cable to the OA/iLO port of each installed Onboard Administrator with KVM module.
3.
If more than one enclosure is installed in the rack, use a CAT5 patch cable to connect the enclosure link-down port on the upper enclosure to the enclosure link-up port on the lower enclosure.
NOTE: The enclosure link ports are designed only to support c-Class enclosures in the same rack. The enclosure
link-up port on the top enclosure is the service port, and the enclosure link-down port on the bottom linked enclosure is unused.
NOTE: The HP BladeSystem c-Class enclosure link ports are not compatible with the HP BladeSystem p-Class enclosure link ports.
Mapping to interconnect ports
Several port types are referenced in the following tables. ? Examples of 1x ports are 1-Gb Ethernet (1 GbE) switch modules and Fibre Channel interconnect modules.
? An example of a 2x port is a Serial Attached SCSI (SAS) interconnect module. (Reserved for future use.)
?
Examples of 4x ports are 10-Gb Ethernet (10 GbE) interconnect modules.
NOTE: 1x and 2x port mezzanine cards interface with single-wide interconnect modules. 4x port mezzanine cards interface with double-wide interconnect modules.
The term "1x/2x" refers to the number of interconnect lanes per port provided by the controller. The more lanes provided per port, the higher the data transmission rate coming from that port.
Mapping half-height blades
The following table lists the available configurations for half-height devices installed in device bay N (1–16).
* Connectivity to interconnect bays 7 and 8 is only available with four-port mezzanine cards or port 2 of 4x card in Mezzanine slot 2. Mapping full-height blades
The following table lists the available configurations for full-height devices installed in device bay N (1–8).
* Connectivity to interconnect bays 7 and 8 is only available with
four-port mezzanine cards or port 2 of 4x card in Mezzanine slot 2.
Mapping BL2x220c Blades
9
10
To support network connections for specific signals, install an
interconnect module in the bay corresponding to the embedded NIC or mezzanine signals.
Interconnect device mapping for double dense server blades
The following table lists the available configurations for double dense server blades installed in device bay N (1-16).
Interconnect device mapping for AMC Telco I/O expansion blades
The following table lists the available configurations for AMC Telco I/O expansion blades installed in device bay N (1-16).
Bay-to-bay crosslinks
Four trace SerDes signals between adjacent bays are provided in the enclosure midplane to permit bay-to-bay communications. Interconnect modules can only connect horizontally.
Device bay crosslinks
Device bay crosslinks are wired between adjacent horizontal device bay pairs.
For half-height blades, these signals connect a four-lane PCIe module to a partner blade such as a tape blade or a PCI expansion blade. For full-height blades, these signals are used to connect a PCIe module to a partner blade in the lower adjacent bay and require a PCIe pass-thru mezzanine card installed in mezzanine connector 3. The Onboard Administrator with KVM disables the device bay crosslinks when they cannot be used, such as when two server blades reside in adjacent device bays.
Interconnect bay crosslinks
Interconnect bay crosslinks are wired between adjacent interconnect bay pairs.
You can enable these signals to provide module-to-module
connections, such as Ethernet crosslink ports between matching switches, or Virtual Connect modules as stacking links. Onboard
Administrator with KVM disables the interconnect bay crosslinks when they cannot be used, such as when two different modules reside in adjacent horizontal interconnect bays.
Installing interconnect modules
NOTE: For information on the location of LEDs and ports
on inpidual interconnect modules, see the documentation
that ships with the interconnect module.
1.Install the interconnect modules based on the number ordered
and the number of fabrics in the configuration.
The enclosure ships with interconnect bay piders installed. The
interconnect bay piders must be removed before installing
double-wide interconnect modules. To remove an interconnect
bay pider, press the release tab, and pull the interconnect bay
pider out of the enclosure.
2.Install interconnect blanks in any unused interconnect bays.
3.Connect each installed interconnect module to the external
connections with the appropriate cable.
Powering up the enclosure
Single-phase power configuration
For a single phase power configuration:
1.Connect the AC power cables to the power connectors on the
rear of the enclosure corresponding to the power supply that was
populated on the front of the enclosure.
2.Be sure each power cable is securely attached to the power
connectors.
3.Connect the AC power cables to the AC power source or to an
installed power distribution unit (PDU).
4.Turn on the AC circuit breakers that power the power cables
installed in the enclosure.
5.Locate the power retention bracket that came with the enclosure.
6.Verify that the power cord retention tabs are on the correct side.
o On the left side: To install the power cord retention bracket
on the left side of the enclosure, ensure the power cord
retention tabs are located to the right of the snap clamps.
o On the right side: To install the power cord retention bracket
on the right side of the enclosure, ensure the power cord
retention tabs are located on the left side of the snap clamps.
7.Place the power cord retention bracket under the power cords,
and then align the power cords with the snap clamps.
8.Open the snap clamps, and then insert each power cord inside
each clamp.
9.Slide the power cord retention bracket until the bracket touches
the enclosure.
11
12
10. Insert the power cord retention tabs into the slots on the enclosure
until they snap into place.
11. Slide each snap clamp over the end of each power cord
overmold, and then squeeze each snap clamp closed.
Three-phase power configuration
For a three-phase power configuration, the AC power cables are already attached to the enclosure. To cable the enclosure using a three-phase AC configuration: 1. Connect the AC power cables to the AC power source. 2.
Turn on the AC circuit breakers that power the power cables installed in the enclosure.
The installation is complete.
Setting up the HP BladeSystem Insight Display
To identify the enclosure, the rear enclosure UID light and the background of the Insight Display are illuminated blue when the
enclosure is powered on initially. When the enclosure is powered up for the first time, the Insight Display launches an installation wizard to guide you through the configuration process. At the beginning of the installation, the wizard automatically powers on the enclosure UID. After the installation is complete, the wizard powers off the enclosure. After configuring the enclosure, the Insight Display verifies that there
are no installation or configuration errors. If errors are present, the Insight Display guides you through the process of correcting the errors. To set up an enclosure with network connectivity to the Onboard Administrator with KVM: 1.
On the Enclosure Settings screen, confirm the default settings. o Use the navigation arrows to navigate to a particular setting,
and then press OK . o Navigate to the ? box next to a setting, and then to get help,
press OK. 2. Confirm the Power mode for the power supplies, which is typically AC Redundant.
3. If the facility must limit AC power to the enclosure below what the power supplies can draw, set the Power Limit.
4.
To provide the highest power efficiency without affecting server performance, enable Dynamic Power Savings.
5.
Record the OA1 and OA2 (if present) IP address. This information is needed when deploying the management software.
o If the OA1 or OA2 IP address is 0.0.0.0., set the address.
Navigate to the address, and then press OK . Use the up and down arrows to select Static IP address. Use the up and down arrows on each field to set the IP, netmask, and gateway one octet at a time. Press OK, and then press OK again on Accept to confirm the new IP address settings. o If neither IP address is 0.0.0.0., record the displayed
address to use for remote login to the Onboard Administrator with KVM over the management network. 6. (Optional) Edit the Enclosure Name. The default value is the enclosure serial number.
7.
(Optional) Edit the Rack Name. The default value is UnnamedRack.
8. Set the Insight Display PIN to prevent other users of the LCD from changing the settings.
9.
Select Accept All at the bottom of the Enclosure Settings, and then press OK to Accept all the settings to continue. If you are setting up a single enclosure, proceed to step 11.
13 10. Select Accept, and then press OK to apply the Enclosure Settings
(Redundancy Mode, Limit AC, Power Savings, Rack Name, and Insight Display PIN) to other linked enclosures.
11. Follow the instructions on the Check: Installation & Cables
screen, and then select Continue.
12. Follow the instructions on the Blades Powering Up screen, and
then select Main Menu. 13. Open a browser and connect to the active Onboard Administrator with KVM module using the Onboard Administrator with KVM IP address that was configured during the Insight Display installation wizard process. 14. Enter the user name and password from the tag supplied with the Onboard Administrator with KVM module to access the remote Onboard Administrator with KVM web interface and complete the Onboard Administrator with KVM first time installation wizard. To set up the enclosure without network connectivity to the Onboard Administrator with KVM, see the Onboard Administrator User Guide. Installing the operating system for Gen8 servers ProLiant Gen8 blades do not ship with provisioning media. However, ProLiant Gen8 blades are preloaded with the media to manage and install the system software and firmware. To operate properly, the blade must have a supported operating system. For the latest information on operating system support, see the HP website (5d1b9d7401f69e3143329427/go/supportos). To install an operating system on the blade, use one of the following methods: ? Intelligent Provisioning—The iLO Management Engine is a new feature on ProLiant blades that contains Intelligent Provisioning for embedded deployment, updating, and provisioning capabilities. Intelligent Provisioning can configure the blade and install an operating system, eliminating the need for SmartStart CDs and Smart Update Firmware DVDs. To install an operating system on the blade with Intelligent Provisioning (local or remote): a. Ensure network connectivity and power on the blade. b. Through a remote control session, during server POST, press the F10. c. Complete the initial Preferences and Registration portion of Intelligent Provisioning. d. At the Home screen, click the Configure and Install button. e. Follow the on-screen prompts to finish the installation. (To
update the firmware and systems software, an Internet
connection is required.)
? Remote deployment installation—Use Insight Control server
deployment for an automated solution to remotely deploy an operating system.
For additional system software and firmware updates, download the HP Service Pack for ProLiant (SPP) from the HP website (5d1b9d7401f69e3143329427/go/spp/download).
The Smart Update Firmware DVD ISO is also available at the download tab on the HP website (5d1b9d7401f69e3143329427/go/foundation).
For information on using these installation methods, see the HP website (5d1b9d7401f69e3143329427/go/ilo).
Installing the operating system for
G7 servers
To operate properly, the server must have a supported operating system installed. For the latest information on supported operating systems, see the HP website (5d1b9d7401f69e3143329427/go/supportos). Methods to install an operating system on the server include: ?SmartStart assisted installation—Insert the SmartStart CD into the DVD-ROM drive and reboot the server.
?Manual installation—Insert the operating system CD into the DVD-ROM drive and reboot the server. You might have to obtain
additional drivers and firmware from the SPP download site
(5d1b9d7401f69e3143329427/go/spp/download).
For more information, download the HP Service Pack for ProLiant (SPP) from the HP website (5d1b9d7401f69e3143329427/go/spp/download). Troubleshooting resources
The HP BladeSystem c-Class Enclosure Troubleshooting Guide
provides procedures and solutions for troubleshooting HP BladeSystem
c-Class enclosures. This guide explains how to use the Insight Display
to troubleshoot enclosures, and it includes a flowchart to help you navigate the troubleshooting process. To view the guide, see the HP website
(5d1b9d7401f69e3143329427/support/BladeSystem_Enclosure_TSG_en).
Before contacting HP Technical Support, be sure to have an Onboard Administrator Show All report available. HP Technical Support must analyze the Onboard Administrator Show All report for configuration errors before proceeding. For instructions on how to create an Onboard Administrator Show All report, see the HP website
(5d1b9d7401f69e3143329427/bizsupport/TechSupport/Document. jsp?lang=en&cc=us&objectID=c02843807).
For more information
Refer to the HP website
(5d1b9d7401f69e3143329427/go/bladesystem/documentation) for more detailed setup and configuration information as well as regulatory, safety, and environmental notices. This information can be found in the
HP BladeSystem c-Class Solution Overview and the HP BladeSystem
c7000 Enclosure Setup and Installation Guide.
14
15
? Copyright 2006, 2011 Hewlett-Packard Development Company, L.P.
The information contained herein is subject to change without notice. The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall not be liable for technical or editorial errors or omissions contained herein.
Bluetooth is a trademark owned by its proprietor and used by Hewlett-Packard Company under license.
Part Number: 411762-401
October 2011
Edition: 9
*411762-401*
411762-401
正在阅读:
HP_C7000机箱快速安装指南04-17
王镜岩生物化学下册复习总结 - 图文11-05
浅谈涉农职务犯罪法律适用问题01-04
2022-2026年中国生物芯片行业市场调查及投资战略预测报告04-19
对于2022青春心向党建功新时代演讲稿范本征文5篇.doc04-12
语文课教学如何激发学生的学习兴趣12-27
2015年度青海海湖水泥制品有限公司销售收入与资产数据报告 -10-24
重庆市南开中学2015届高三高考前最后一次模拟考试12-15
清洁工,我心中的阳光作文500字07-03
日月潭的传说教学反思02-21
- 教学能力大赛决赛获奖-教学实施报告-(完整图文版)
- 互联网+数据中心行业分析报告
- 2017上海杨浦区高三一模数学试题及答案
- 招商部差旅接待管理制度(4-25)
- 学生游玩安全注意事项
- 学生信息管理系统(文档模板供参考)
- 叉车门架有限元分析及系统设计
- 2014帮助残疾人志愿者服务情况记录
- 叶绿体中色素的提取和分离实验
- 中国食物成分表2020年最新权威完整改进版
- 推动国土资源领域生态文明建设
- 给水管道冲洗和消毒记录
- 计算机软件专业自我评价
- 高中数学必修1-5知识点归纳
- 2018-2022年中国第五代移动通信技术(5G)产业深度分析及发展前景研究报告发展趋势(目录)
- 生产车间巡查制度
- 2018版中国光热发电行业深度研究报告目录
- (通用)2019年中考数学总复习 第一章 第四节 数的开方与二次根式课件
- 2017_2018学年高中语文第二单元第4课说数课件粤教版
- 上市新药Lumateperone(卢美哌隆)合成检索总结报告
- 机箱
- 快速
- 安装
- 指南
- 7000
- HP
- 高考英语必修1到选修8重点单词短语汇总
- 2022年中国政法大学761马克思主义理论综合一之马克思主义基本原
- 广东省清远市连南高中高一(上)第一次月考数学试卷(b卷)
- 2022年中考备考英语阅读理解模拟题及答案:Technology
- 小学高效阅读训练材料
- 三年级下册道德与法治教案- 2 不一样的你我他 人教部编版
- 2022-2022年高二数学第六章不等式教材分析 新课标 人教版
- 高效 推荐给广告设计公关营销策划人7款实用营销策划方案工具
- 语文版2022年备战中考初中英语训练专题—阅读理解(人生百味类)(I
- 《酒店管理系统-软件项目范围说明书》
- 六级单词一笑而过最新版
- 小班区域教研活动方案
- 成本控制部工作总结
- 为什么有些软件安装完后需要重启电脑
- 话剧社未来发展策划书
- 精品解析:【百强校】安徽省六安市第一中学2022届高三高考模拟试
- 驿站传书拓展项目4篇.doc
- 2022年陕西省宝鸡市眉县教师招聘《教育学、教育心理、教师法》真
- 蔗-汁-清-净-第一章
- 功能性糖果出口国际市场分析