投资学第10版习题答案06分析解析
更新时间:2024-06-02 13:59:01 阅读量: 综合文库 文档下载
- 投资学第10版答案推荐度:
- 相关推荐
Chapter 6 - Capital Allocation to Risky Assets
CHAPTER 6: CAPITAL ALLOCATION TO RISKY ASSETS
PROBLEM SETS
1. (e) The first two answer choices are incorrect because a highly risk averse investor
would avoid portfolios with higher risk premiums and higher standard deviations. In addition, higher or lower Sharpe ratios are not an indication of an investor's
tolerance for risk. The Sharpe ratio is simply a tool to absolutely measure the return premium earned per unit of risk.
2. (b) A higher borrowing rate is a consequence of the risk of the borrowers’ default.
In perfect markets with no additional cost of default, this increment would equal the value of the borrower’s option to default, and the Sharpe measure, with appropriate treatment of the default option, would be the same. However, in reality there are costs to default so that this part of the increment lowers the Sharpe ratio. Also, notice that answer (c) is not correct because doubling the expected return with a fixed risk-free rate will more than double the risk premium and the Sharpe ratio.
3. Assuming no change in risk tolerance, that is, an unchanged risk-aversion
coefficient (A), higher perceived volatility increases the denominator of the equation for the optimal investment in the risky portfolio (Equation 6.7). The proportion invested in the risky portfolio will therefore decrease.
4. a. The expected cash flow is: (0.5 × $70,000) + (0.5 × 200,000) = $135,000.
With a risk premium of 8% over the risk-free rate of 6%, the required rate of return is 14%. Therefore, the present value of the portfolio is:
$135,000/1.14 = $118,421
b.
If the portfolio is purchased for $118,421 and provides an expected cash inflow of $135,000, then the expected rate of return [E(r)] is as follows:
$118,421 × [1 + E(r)] = $135,000
Therefore, E(r) = 14%. The portfolio price is set to equate the expected rate of return with the required rate of return.
c.
If the risk premium over T-bills is now 12%, then the required return is:
6% + 12% = 18%
The present value of the portfolio is now:
$135,000/1.18 = $114,407
d.
For a given expected cash flow, portfolios that command greater risk
6-1
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
Chapter 6 - Capital Allocation to Risky Assets
premiums must sell at lower prices. The extra discount from expected value is a penalty for risk.
5.
When we specify utility by U = E(r) – 0.5AσThe utility level for the risky portfolio is:
U = 0.12 – 0.5 × A × (0.18)2 = 0.12 – 0.0162 × A
In order for the risky portfolio to be preferred to bills, the following must hold:
0.12 – 0.0162A > 0.07 ? A < 0.05/0.0162 = 3.09
A must be less than 3.09 for the risky portfolio to be preferred to bills. 6.
Points on the curve are derived by solving for E(r) in the following equation:
U = 0.05 = E(r) – 0.5Aσ2 = E(r) – 1.5σ2
The values of E(r), given the values of σ2, are therefore: ? 0.00 0.05 0.10 0.15 0.20 0.25
? 2 0.0000 0.0025 0.0100 0.0225 0.0400 0.0625
E(r) 0.05000 0.05375 0.06500 0.08375 0.11000 0.14375
2
, the utility level for T-bills is: 0.07
The bold line in the graph on the next page (labeled Q6, for Question 6) depicts the indifference curve. 7.
Repeating the analysis in Problem 6, utility is now:
U = E(r) – 0.5Aσ2 = E(r) – 2.0σ2 = 0.05
The equal-utility combinations of expected return and standard deviation are presented in the table below. The indifference curve is the upward sloping line in the graph on the next page, labeled Q7 (for Question 7). ? 0.00 0.05 0.10 0.15 0.20 0.25
6-2
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
? 2 0.0000 0.0025 0.0100 0.0225 0.0400 0.0625
E(r) 0.0500 0.0550 0.0700 0.0950 0.1300 0.1750
Chapter 6 - Capital Allocation to Risky Assets
The indifference curve in Problem 7 differs from that in Problem 6 in slope. When A increases from 3 to 4, the increased risk aversion results in a greater slope for the indifference curve since more expected return is needed in order to compensate for additional σ. E(r) U(Q7,A=4) U(Q6,A=3) 5 U(Q8,A=0) U(Q9,A<0) 8.
The coefficient of risk aversion for a risk neutral investor is zero. Therefore, the corresponding utility is equal to the portfolio’s expected return. The corresponding indifference curve in the expected return-standard deviation plane is a horizontal line, labeled Q8 in the graph above (see Problem 6).
A risk lover, rather than penalizing portfolio utility to account for risk, derives greater utility as variance increases. This amounts to a negative coefficient of risk aversion. The corresponding indifference curve is downward sloping in the graph above (see Problem 6), and is labeled Q9.
9.
6-3
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
Chapter 6 - Capital Allocation to Risky Assets
10.
The portfolio expected return and variance are computed as follows: (1) (2) (3) (4) rPortfolio ?Portfolio
? 2 Portfolio
WBills rBills WIndex rIndex (1)×(2)+(3)×(4) (3) × 20% 0.0 5% 1.0 13.0% 13.0% = 0.130 20% = 0.20 0.0400 0.2 5 0.8 13.0 11.4% = 0.114 16% = 0.16 0.0256 0.4 5 0.6 13.0 9.8% = 0.098 12% = 0.12 0.0144 0.6 5 0.4 13.0 8.2% = 0.082 8% = 0.08 0.0064 0.8 5 0.2 13.0 6.6% = 0.066 4% = 0.04 0.0016 1.0 5 0.0 13.0 5.0% = 0.050 0% = 0.00 0.0000
11. Computing utility from U = E(r) – 0.5 × Aσ2 = E(r) – σ2, we arrive at the values in
the column labeled U(A = 2) in the following table:
WBills 0.0 0.2 0.4 0.6 0.8 1.0
WIndex 1.0 0.8 0.6 0.4 0.2 0.0
rPortfolio 0.130 0.114 0.098 0.082 0.066 0.050
?Portfolio ?2Portfolio 0.20 0.0400 0.16 0.0256 0.12 0.0144 0.08 0.0064 0.04 0.0016 0.00 0.0000
U(A = 2)
0.0900 0.0884 0.0836 0.0756 0.0644 0.0500
U(A = 3) .0700 .0756 .0764 .0724 .0636 .0500
The column labeled U(A = 2) implies that investors with A = 2 prefer a portfolio that is invested 100% in the market index to any of the other portfolios in the table.
12. The column labeled U(A = 3) in the table above is computed from:
U = E(r) – 0.5Aσ2 = E(r) – 1.5σ2
The more risk averse investors prefer the portfolio that is invested 40% in the market, rather than the 100% market weight preferred by investors with A = 2.
13. Expected return = (0.7 × 18%) + (0.3 × 8%) = 15%
Standard deviation = 0.7 × 28% = 19.6%
14. Investment proportions: 30.0% in T-bills 0.7 × 25% = 17.5% in Stock A 0.7 × 32% = 22.4% in Stock B 0.7 × 43% = 30.1% in Stock C
.18?.08?0.3571 15. Your reward-to-volatility ratio: S?.28Client's reward-to-volatility ratio: S?
.15?.08?0.3571 .1966-4
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
Chapter 6 - Capital Allocation to Risky Assets
16.
30 25 20 E(r)% 15 10 5 0 0 10 20 30 40 CAL (Slope = 0.3571) Client P ?????
17. a.
E(rC) = rf + y × [E(rP) – rf] = 8 + y × (18 ? 8) If the expected return for the portfolio is 16%, then:
16% = 8% + 10% × y ?y?.16?.08?0.8 .10Therefore, in order to have a portfolio with expected rate of return equal to 16%, the client must invest 80% of total funds in the risky portfolio and 20% in T-bills. b.
Client’s investment proportions: 0.8 × 25% = 0.8 × 32% = 0.8 × 43% = c.
σC = 0.8 × σP = 0.8 × 28% = 22.4%
20.0% in T-bills
20.0% in Stock A 25.6% in Stock B 34.4% in Stock C
6-5
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
Chapter 6 - Capital Allocation to Risky Assets
18. a.
σC = y × 28%
If your client prefers a standard deviation of at most 18%, then: y = 18/28 = 0.6429 = 64.29% invested in the risky portfolio.
b. 19. a.
E(rC)?.08?.1?y?.08?(0.6429?.1)?14.429%
y*?E(rP)?rfAσ2P?0.18?0.080.10??0.3644
3.5?0.2820.2744
b.
20. a.
Therefore, the client’s optimal proportions are: 36.44% invested in the risky portfolio and 63.56% invested in T-bills.
E(rC) = 0.08 + 0.10 × y* = 0.08 + (0.3644 × 0.1) = 0.1164 or 11.644% ?C = 0.3644 × 28 = 10.203%
If the period 1926–2012 is assumed to be representative of future expected performance, then we use the following data to compute the fraction allocated to equity: A = 4, E(rM) ? rf = 8.10%, σM = 20.48% (we use the standard deviation of the risk premium from Table 6.7). Then y* is given by:
That is, 48.28% of the portfolio should be allocated to equity and 51.72% should be allocated to T-bills. b.
If the period 1968–1988 is assumed to be representative of future expected performance, then we use the following data to compute the fraction allocated to equity: A = 4, E(rM) ? rf = 3.44%, σM = 16.71% and y* is given by:
y*?E(rM)?rf2A?M?0.0344?0.3080 24?0.1671
Therefore, 30.80% of the complete portfolio should be allocated to equity and 69.20% should be allocated to T-bills. c.
In part (b), the market risk premium is expected to be lower than in part (a) and market risk is higher. Therefore, the reward-to-volatility ratio is expected to be lower in part (b), which explains the greater proportion invested in T-bills.
6-6
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
Chapter 6 - Capital Allocation to Risky Assets
21. a.
b.
c.
E(rC) = 8% = 5% + y × (11% – 5%) ? y?σC = y × σP = 0.50 × 15% = 7.5%
.08?.05?0.5
.11?.05The first client is more risk averse, preferring investments that have less risk as evidenced by the lower standard deviation.
22. Johnson requests the portfolio standard deviation to equal one half the market
portfolio standard deviation. The market portfolio ?M?20%, which implies
?P?10%. The intercept of the CML equals rf?0.05and the slope of the CML
equals the Sharpe ratio for the market portfolio (35%). Therefore using the CML:
E(rP)?rf?E(rM)?rf?M?P?0.05?0.35?0.10?0.085?8.5%
23. Data: rf = 5%, E(rM) = 13%, σM = 25%, and rfB= 9%
The CML and indifference curves are as follows:
24. For y to be less than 1.0 (that the investor is a lender), risk aversion (A) must be
large enough such that:
y?E(rM)?rfAσ2ME(rM)?rfAσ2M?1 ? A?0.13?0.05?1.28 20.25For y to be greater than 1 (the investor is a borrower), A must be small enough:
y??1 ? A?0.13?0.09?0.64 20.256-7
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
Chapter 6 - Capital Allocation to Risky Assets
For values of risk aversion within this range, the client will neither borrow nor lend but will hold a portfolio composed only of the optimal risky portfolio:
y = 1 for 0.64 ≤ A ≤ 1.28
25. a.
The graph for Problem 23 has to be redrawn here, with: E(rP) = 11% and σP = 15%
b. For a lending position: A?0.11?0.05?2.67
0.152
For a borrowing position: A?0.11?0.09?0.89 20.15Therefore, y = 1 for 0.89 ≤ A ≤ 2.67
26. The maximum feasible fee, denoted f, depends on the reward-to-variability ratio.
For y < 1, the lending rate, 5%, is viewed as the relevant risk-free rate, and we solve for f as follows:
.11?.05?f.13?.05.15?.08??.012, or 1.2% ? f?.06?.15.25.25For y > 1, the borrowing rate, 9%, is the relevant risk-free rate. Then we notice that,
even without a fee, the active fund is inferior to the passive fund because:
.11 – .09 – f
= 0.13 <
.13 – .09
= 0.16 → f = –.004
.15 .25
More risk tolerant investors (who are more inclined to borrow) will not be clients of the fund. We find that f is negative: that is, you would need to pay investors to choose your active fund. These investors desire higher risk–higher return complete
6-8
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
Chapter 6 - Capital Allocation to Risky Assets
portfolios and thus are in the borrowing range of the relevant CAL. In this range, the reward-to-variability ratio of the index (the passive fund) is better than that of the managed fund. 27. a.
.13?.08?0.20 .25The diagram follows. Slope of the CML? 18 16 14 12 10 8 6 4 2 0 0 CML and CAL CAL: Slope = 0.3571 Expected Retrun CML: Slope = 0.20 10 20 30 Standard Deviation b.
28. a.
My fund allows an investor to achieve a higher mean for any given standard deviation than would a passive strategy, i.e., a higher expected return for any given level of risk. With 70% of his money invested in my fund’s portfolio, the client’s expected return is 15% per year with a standard deviation of 19.6% per year. If he shifts that money to the passive portfolio (which has an expected return of 13% and standard deviation of 25%), his overall expected return becomes: E(rC) = rf + 0.7 × [E(rM) ? rf] = .08 + [0.7 × (.13 – .08)] = .115, or 11.5% The standard deviation of the complete portfolio using the passive portfolio would be:
σC = 0.7 × σM = 0.7 × 25% = 17.5%
Therefore, the shift entails a decrease in mean from 15% to 11.5% and a decrease in standard deviation from 19.6% to 17.5%. Since both mean return and standard deviation decrease, it is not yet clear whether the move is beneficial. The disadvantage of the shift is that, if the client is willing to accept a mean return on his total portfolio of 11.5%, he can achieve it with a lower standard deviation using my fund rather than the passive portfolio. To achieve a target mean of 11.5%, we first write the mean of the complete
6-9
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
Chapter 6 - Capital Allocation to Risky Assets
portfolio as a function of the proportion invested in my fund (y):
E(rC) = .08 + y × (.18 ? .08) = .08 + .10 × y
Our target is: E(rC) = 11.5%. Therefore, the proportion that must be invested in my fund is determined as follows:
.115 = .08 + .10 × y ? y?.115?.08?0.35 .10The standard deviation of this portfolio would be:
σC = y × 28% = 0.35 × 28% = 9.8%
Thus, by using my portfolio, the same 11.5% expected return can be achieved with a standard deviation of only 9.8% as opposed to the standard deviation of 17.5% using the passive portfolio.
b.
The fee would reduce the reward-to-volatility ratio, i.e., the slope of the CAL. The client will be indifferent between my fund and the passive portfolio if the slope of the after-fee CAL and the CML are equal. Let f denote the fee:
Slope of CAL with fee ?.18?.08?f.10?f?
.28.28.13?.08?0.20 .25Slope of CML (which requires no fee)?Setting these slopes equal we have:
.10?f?0.20?f?0.044?4.4%per year .28
29. a.
The formula for the optimal proportion to invest in the passive portfolio is:
y*?E(rM)?rfAσ2M
Substitute the following: E(rM) = 13%; rf = 8%; σM = 25%; A = 3.5:
y*?0.13?0.08?0.2286, or 22.86% in the passive portfolio 23.5?0.25
6-10
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
Chapter 6 - Capital Allocation to Risky Assets
b.
The answer here is the same as the answer to Problem 28(b). The fee that you can charge a client is the same regardless of the asset allocation mix of the client’s portfolio. You can charge a fee that will equate the reward-to-volatility ratio of your portfolio to that of your competition.
CFA PROBLEMS
1. Utility for each investment = E(r) – 0.5 × 4 × σ2
We choose the investment with the highest utility value, Investment 3. Expected
return Investment E(r)
1 0.12 2 0.15 3 0.21 4 0.24
Standard
deviation
? 0.30 0.50 0.16 0.21
Utility U -0.0600 -0.3500 0.1588 0.1518
2. 3. 4. 5. 6. 7. 8.
When investors are risk neutral, then A = 0; the investment with the highest utility is Investment 4 because it has the highest expected return. (b)
Indifference curve 2 because it is tangent to the CAL. Point E
(0.6 × $50,000) + [0.4 × (?$30,000)] ? $5,000 = $13,000
(b) Higher borrowing rates will reduce the total return to the portfolio and this results in a part of the line that has a lower slope.
Expected return for equity fund = T-bill rate + Risk premium = 6% + 10% = 16% Expected rate of return of the client’s portfolio = (0.6 × 16%) + (0.4 × 6%) = 12% Expected return of the client’s portfolio = 0.12 × $100,000 = $12,000 (which implies expected total wealth at the end of the period = $112,000) Standard deviation of client’s overall portfolio = 0.6 × 14% = 8.4%
6-11
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
Chapter 6 - Capital Allocation to Risky Assets
9. Reward-to-volatility ratio =
.10?0.71 .14
CHAPTER 6: APPENDIX
1. By year-end, the $50,000 investment will grow to: $50,000 × 1.06 = $53,000
Without insurance, the probability distribution of end-of-year wealth is:
No fire Fire
Probability 0.999 0.001
Wealth $253,000 53,000
For this distribution, expected utility is computed as follows:
E[U(W)] = [0.999 × ln(253,000)] + [0.001 × ln(53,000)] = 12.439582 The certainty equivalent is:
WCE = e 12.439582 = $252,604.85
With fire insurance, at a cost of $P, the investment in the risk-free asset is:
$(50,000 – P)
Year-end wealth will be certain (since you are fully insured) and equal to:
[$(50,000 – P) × 1.06] + $200,000 Solve for P in the following equation:
[$(50,000 – P) × 1.06] + $200,000 = $252,604.85 ? P = $372.78
This is the most you are willing to pay for insurance. Note that the expected loss is “only” $200, so you are willing to pay a substantial risk premium over the expected value of losses. The primary reason is that the value of the house is a large proportion of your wealth. 2.
a.
With insurance coverage for one-half the value of the house, the premium is $100, and the investment in the safe asset is $49,900. By year-end, the investment of $49,900 will grow to: $49,900 × 1.06 = $52,894 If there is a fire, your insurance proceeds will be $100,000, and the probability distribution of end-of-year wealth is:
No fire Fire
Probability 0.999 0.001
Wealth $252,894 152,894
For this distribution, expected utility is computed as follows:
E[U(W)] = [0.999 × ln(252,894)] + [0.001 × ln(152,894)] = 12.4402225 The certainty equivalent is:
WCE = e 12.4402225 = $252,766.77
6-12
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
Chapter 6 - Capital Allocation to Risky Assets
b.
With insurance coverage for the full value of the house, costing $200, end-of-year wealth is certain, and equal to:
[($50,000 – $200) × 1.06] + $200,000 = $252,788
Since wealth is certain, this is also the certainty equivalent wealth of the fully insured position.
c.
With insurance coverage for 1? times the value of the house, the premium is $300, and the insurance pays off $300,000 in the event of a fire. The investment in the safe asset is $49,700. By year-end, the investment of $49,700 will grow to: $49,700 × 1.06 = $52,682 The probability distribution of end-of-year wealth is:
No fire Fire
Probability 0.999 0.001
Wealth $252,682 352,682
For this distribution, expected utility is computed as follows:
E[U(W)] = [0.999 × ln(252,682)] + [0.001 × ln(352,682)] = 12.4402205 The certainty equivalent is:
WCE = e 12.440222 = $252,766.27
Therefore, full insurance dominates both over- and underinsurance.
Overinsuring creates a gamble (you actually gain when the house burns down). Risk is minimized when you insure exactly the value of the house.
6-13
Copyright ? 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
正在阅读:
投资学第10版习题答案06分析解析06-02
小学三年级英语阅读理解专项训练1-4012-28
单位员工离职证明15篇03-31
变电所毕业设计12-30
EIMu8知识清单 合09-18
助学金申请书优秀10篇03-26
东华服装材料学复习题03-03
胰岛素注射的注意事项05-15
勘察技术标勘察方案11-25
- 天大砼方案 - 图文
- 农业科技网络书屋能力提升_玉米错题选
- DNS习题
- 浅议检察官对罪犯谈话的技巧与效果
- 高考语文文言文翻译专题训练
- AB类学科竞赛目录(2015)
- 建筑面积计算新规定(2015最新)
- Revit2012初级工程师题集一
- 十三五项目米线可行性报告
- 2013体育学院党组织建设工作总结
- 2014Revit工程师题库
- 高中数学如何实施研究性学习
- 茶艺表演 中英互译
- 小学音乐湘文艺版 四年级下册 第十一课《(歌表演)脚印》优质课公
- 山西省农村合作经济承包合同管理条例
- 2015年镇江市中考化学一模试题参考答案及评分标准(定稿)
- 统计 题集
- 批评意见清单
- 8潞安集团蒲县黑龙关煤矿矿业公司2
- 鄂教版四年级语文上册复习精要(光谷四小)
- 习题
- 解析
- 答案
- 分析
- 投资
- 管理学原理核心英语词汇
- 物业管理协会讲话
- xxxx公司员工表扬立功管理规定
- 基础会计学 ( 第3次 )
- 2018党员思想汇报:反腐倡廉建设向纵深发展
- EDA课程设计--八位全加器 - 图文
- 小学数学教师基本功考试-试题及答案
- 年产1500吨大豆蛋白纤维生产线项目建议书-优秀甲级资质可行性建
- 施工安全管理体系
- 试卷项目可行性研究报告(目录)
- 反击跳闸率计算详细说明
- 高等教育心理学与高等学校教师重点试题解析
- 初中语文现代文阅读专题(二)
- 外国新闻事业史(笔记)
- 出口非公路用摩托车全地形车注册工厂
- 《中国古代文学史》名词解释、论述题汇总
- 我国水果产业物流供应链存在的问题及对策研究
- 2018-2019年鄂教版八年级下语文月考试卷2
- 超星尔雅《心理、行为与文化》章节练习满分答案2016最新
- 冀教版小学语文四年级下册:8.树上的鞋(说课稿)