《液压爬升模板施工技术规程》报批稿(最后定稿)
更新时间:2023-09-22 11:00:01 阅读量: 经管营销 文档下载
UDC
中华人民共和国行业标准
P JGJ XXX—200X
液压爬升模板施工技术规程
Technical specification for construction of the hydraulic climbing
formwork
(报批稿) 2009-03-16
200X—XX—XX发布 200X—XX—XX实施
中 华 人 民 共 和 国 住 房 和 城 乡 建 设 部 发布
中华人民共和国行业标准
液压爬升模板施工技术规程
Technical specification for construction of the
hydraulic climbing formwork
JGJ XXX—200X J XX—200X
主编单位:江苏江都建设工程有限公司 批准部门:中华人民共和国住房和城乡建设部 施行日期:200X年XX月XX日
中国建筑工业出版社
200X 北 京
前 言
本规程是根据住房和城乡建设部建标〔2008〕102号《关于印发2008年工程建设标准规范制订、修订计划(第一批)的通知》的要求,由江苏江都建设工程有限公司会同全国有关单位共同编制而成的。
在编制过程中,编制组进行了广泛深入调查研究,认真总结液压爬升模板施工的实践经验,与国家现行的其他工程技术规范配套,并在广泛征求意见基础上,制定了本规程。
本规程共11章19节和8个附录,其主要内容包括:总则、术语和符号、基本规定、爬模施工准备、爬模装置设计、爬模装置制作、爬模装置安装与拆除、爬模施工、安全规定、爬模装置维护与保养、环保措施、附录。
本规程中以黑体字标志的条文为强制性条文,必须严格执行。本规程由住房和城乡建设部负责管理和对强制性条文的解释,由江苏江都建设工程有限公司负责具体技术内容的解释。(地址:江苏省江都市舜天路200号建工大厦,邮政编码:225200)
本规程主编单位、参编单位和主要起草人: 主 编 单 位:江苏江都建设工程有限公司 参 编 单 位:中国建筑科学研究院
北京市建筑工程研究院 中建一局集团建设发展有限公司 上海建工(集团)总公司 江都揽月机械有限公司 中建柏利工程技术发展有限公司 多卡(上海)建筑工程咨询有限公司 广州市建筑集团有限公司 北京奥宇模板有限公司
主要起草人:王 健 张良杰 赵玉章 施炳华 谢庆华
陆 云 张玉松 丁成堂 张宗建 张志明 刘文赞 符史勇 杨晓东 黄 勇 刘国恩 任海波
主要审查人:徐义屏 孙振声 糜嘉平 毛凤林 高小旺
刘 平 胡长明 赵正嘉 汪道金 李景芳 胡 健
目 次
1 总则 ······································································································································· 1 2 术语和符号 ··························································································································· 2
2.1 术语 ····························································································································· 2 2.2 符号 ····························································································································· 3 3 基本规定 ······························································································································· 4 4 爬模施工准备 ······················································································································· 5
4.1 技术准备 ····················································································································· 5 4.2 材料准备 ····················································································································· 5 5 爬模装置设计 ······················································································································· 7
5.1 整体设计 ····················································································································· 7 5.2 部件设计 ····················································································································· 8 5.3 计算 ··························································································································· 10 6 爬模装置制作 ····················································································································· 12
6.1 制作技术要求 ··········································································································· 12 6.2 制作质量检验标准 ··································································································· 12 7 爬模装置安装与拆除 ········································································································· 14
7.1 安装前的准备工作 ··································································································· 14 7.2 安装程序 ··················································································································· 14 7.3 安装技术要求 ··········································································································· 15 7.4 安装质量验收标准 ··································································································· 16 7.5 拆除 ··························································································································· 16 8 爬模施工 ····························································································································· 18
8.1 施工程序 ··················································································································· 18 8.2 爬模装置爬升 ··········································································································· 18 8.3 钢筋工程 ··················································································································· 20 8.4 混凝土工程 ··············································································································· 20 8.5 工程质量验收标准 ··································································································· 21 9 安全规定 ····························································································································· 22 10 爬模装置维护与保养 ······································································································· 24 11 环保措施 ··························································································································· 25 附录 A 油缸和架体的爬模装置示意图 ·············································································· 26 附录 B 千斤顶和提升架的爬模装置示意图 ······································································ 27 附录 C 爬模装置设计荷载标准值 ······················································································ 28 附录 D 承载螺栓承载力计算 ······························································································ 29 附录 E 支承杆承载力计算 ·································································································· 30 附录 F 导轨的刚度计算 ······································································································· 31 附录 G 爬模工程垂直偏差测量记录表 ·············································································· 32 附录 H 爬模施工安全检查表 ······························································································ 33 本规程用词说明 ······················································································································· 34 引用标准名录 ··························································································································· 35 附:条文说明 ·······························································································································
Contents
1 General guidance ··················································································································· 1 2 Term and symbol ··················································································································· 2
2.1 Term ···························································································································· 2 2.2 Symbol ························································································································ 3 3 Basic provision ······················································································································ 4 4 Climbing formwork construction preparation ······································································· 5
4.1 Technique preparation ································································································· 5 4.2 Materials preparation ·································································································· 5 5 Climbing formwork equipment design ················································································· 7
5.1 Layout design ············································································································ 7 5.2 Component design····································································································· 8 5.3 Calculation ·············································································································· 10 6 Climbing formwork equipment production ········································································· 12
6.1 Fabrication technical requirement ············································································· 12 6.2 Production quality checking standard ······································································· 12 7 Climbing equipment installation and disassembly ······························································ 14
7.1 Preparation before assembly ····················································································· 14 7.2 Assembly procedure ·································································································· 14 7.3 Assembly technical requirement ··············································································· 15 7.4 Assembly quality checking standard ········································································· 16 7.5 Disassembly ·············································································································· 16 8 Climbing formwork construction ························································································ 18
8.1 Construction procedure ····························································································· 18 8.2 Climbing formwork equipment ················································································· 18 8.3 Steel reinforcement work ·························································································· 20 8.4 Concrete work ··········································································································· 20 8.5 Construction quality check and acceptance standard ················································ 21 9 Safety regulation ················································································································· 22 10 Protecting climbing equipment maintenance ···································································· 24 11 Environment measures ······································································································ 25 Appendix A cylinder and climbing bracket climbing device section drawing ·························· 26 Appendix B jack and lift yoke climbing device section drawing ············································· 27 Appendix C climbing device standard design load ··································································· 28 Appendix D bearing screw carrying capacity calculation method ············································ 29 Appendix E climbing rode carrying capacity calculation method ············································ 30 Appendix F climbing rail rigidity calculation method ······························································ 31 Appendix G survey note of climbing formwork vertical windage ············································ 32 Appendix H climbing formwork construction safety checking list ·········································· 33 The instruction glossary illustration ·························································································· 34 Quotation standard catalogue ···································································································· 35 Appendix: item illustration ············································································································
正在阅读:
财务报告分析简答题-0911-01
融资提成协议书05-30
“超级”学生作文500字06-26
打篮球作文400字07-09
蜜蜂做工 教案03-17
超级学生作文500字06-26
洋河蓝色经典广告词(共4篇)分析08-22
牙科器械及用语中英文对照10-12
副班主任工作总结(三月)10-08
- 教育局拟征求中考升学奖励制度
- 2020房地产销售主管年终工作总结
- 虚拟多台位互感器检定装置投资项目可行性分析
- 车间工人辞职报告范本
- 溴投资项目可行性分析
- 改名字申请书怎么写
- 忧与爱作文素材
- 溴苯腈投资项目可行性分析
- 2020清华大学考研复试时间:3月6日至22日
- 2020年蚌埠高考查分系统网址
- 2020年二建《建筑工程实务》测试题及答案(13)
- 生死感悟——人间世观感一
- 武陵源区军地小学观看魏书生《如何当好班主任》讲座录像
- 全球10大安全旅游国出炉日本排名第9
- 企业策划书模板
- 高中英语教师工作总结3篇
- 法定代表人证明范本
- 大学助学金申请书范文1700字
- 案外人申请不予执行仲裁裁决司法解释施行首份申请书递交齐齐哈尔...
- 环球国际房地产开发项目策划
- 爬升
- 定稿
- 报批
- 施工技术
- 规程
- 液压
- 模板
- 最后
- 国家突发事件预警信息发布管理平台预警类型与编码对应表
- 万隆会议历史短剧剧本
- 证券投资分析实验报告
- 《三亚落日》第二课时
- 学校教师年度考核工作总结
- 华业地产关于联合光大控股、IDG资本共同打造“新北京中心 - 产业金融发展聚集区”的请示(20141215)
- 论杜甫诗歌的现实主义成就
- 市场营销学 习题及答案
- 福建省漳州市八校2016届高三12月联考历史试题(原卷版)
- 关于印发大陆企业赴台湾地区投资管理办法 …
- 老年护理学(专升本) 学习指南
- 2015年中级计量A中期作业题(1)
- 仓库管理表单
- 培树宣传先进典型的通知
- 英语辩论赛常用词汇和表达法汇总辩论赛EnglishdebatingCompetition
- 黄冈市三级干部大会上的讲话
- 初一童话:受骗以后
- 浙江大学管理学真题 98-11
- 2014~2015学年度 最新 温州市实验中学2015届初中毕业生一模考试英语试题及答案 - 图文
- Eterm操作201306 - 图文