西门子CP314作为DP主站应用和实现S7 connection
更新时间:2023-04-22 11:19:01 阅读量: 实用文档 文档下载
西门子CP314高级应用,CP314作为Profibus主站使用,方便实现系统的扩展,利用CP314实现PLC之间的通讯
Part2: S7-300 master station with ET200M through the CP342-5
Step1: create a new project and insert a S7-300 station, make the hardware configuration:
Step2: double click the CP342-5 module, choose the ‘Operating Mode’ manual, active the ‘DP
master’. Then choose the ‘General’ set the CP address and create a new profibus network.
西门子CP314高级应用,CP314作为Profibus主站使用,方便实现系统的扩展,利用CP314实现PLC之间的通讯
CP342-5 now is the master of the new network..
Step3: insert the ET200M slave station
西门子CP314高级应用,CP314作为Profibus主站使用,方便实现系统的扩展,利用CP314实现PLC之间的通讯
Step4: Compile and save, then download into the CPU. Now the LED BF is on, it is not the system fault but haven’t active by programming. Step5: programming
FC1, FC2 are the function block to send and receive data from the CP. There are two important addresses using in the program: the I/O address assigned to CP by the PLC.
西门子CP314高级应用,CP314作为Profibus主站使用,方便实现系统的扩展,利用CP314实现PLC之间的通讯
It can be set here or use the system default (320).
Attention: when you set the address yourself, the two must be set the same one.
西门子CP314高级应用,CP314作为Profibus主站使用,方便实现系统的扩展,利用CP314实现PLC之间的通讯
Here in the FC1, the means of the data MB0-MB9 is shown in the following table:
No matter there is Q0.0 / I0.0 or not.
西门子CP314高级应用,CP314作为Profibus主站使用,方便实现系统的扩展,利用CP314实现PLC之间的通讯
Part3: S7 connection between the S7-300 and S7-300 with CP342-5
Step1: Create a new project and make the hardware configuration of the two stations A, B. Be careful with the station address, the two stations must be different with each other. Step2: set CP property for each station
Station A:
as the active connection partner
Open the CP 342-5 property window and choose the Operation Mode menu, then active the No DP.
Create a new profibus connection.
西门子CP314高级应用,CP314作为Profibus主站使用,方便实现系统的扩展,利用CP314实现PLC之间的通讯
Do the same thing to the station B. But when create the profibus connection, choose the profibus
created by the CP342-5 of station A.
Save and compile, then download the hardware configuration to both stations separately through the MPI.
Step3: Establish the S7 connection
Open the Netpro, highlight the CPU of the station A, and then a list will be shown in the down window.
西门子CP314高级应用,CP314作为Profibus主站使用,方便实现系统的扩展,利用CP314实现PLC之间的通讯
Right click in the first line of the Local ID, choose Insert New Connection, a new window will be
created.
Choose the CPU of station B and select the S7 connection in the menu of Connection Type. Click OK.
西门子CP314高级应用,CP314作为Profibus主站使用,方便实现系统的扩展,利用CP314实现PLC之间的通讯
In the new pop window, active the Establish an active connection (for the station A, as the active connection partner, for station B, no active) and set a Hex number for the Local ID witch will be used in the program. Press OK, then a new connection will be created both in the station A and
station B. T
The difference is just the Partner and the Active connection Partner. Save and compile. Then
download.
Connect the two stations with profibus cable through the CP342-5 DP interface. Step4: program
FB12, FB13 are used for the CP342-5-CP342-5 data transfer. They work in couple. For example, if you want to transfer data from station A to station B, you have to use FB12 in station A and FB13 in station B.
西门子CP314高级应用,CP314作为Profibus主站使用,方便实现系统的扩展,利用CP314实现PLC之间的通讯
Profibus experiment
22
正在阅读:
西门子CP314作为DP主站应用和实现S7 connection04-22
社区重点人群中医药保健指导方案04-16
110变电站监理细则 - 图文04-17
中国法制史01-24
民营温泉酒店业的管理问题、发展及对策05-07
2018年第三军医大学应用心理学347心理学专业综合之心理与教育测量考研冲刺五套模拟题05-03
小学文言文阅读练习题(打印)01-31
《预包装食品营养标签通则》(GB 28050-2011)问答(修订版)01-18
国学与人生境界12-22
- 教学能力大赛决赛获奖-教学实施报告-(完整图文版)
- 互联网+数据中心行业分析报告
- 2017上海杨浦区高三一模数学试题及答案
- 招商部差旅接待管理制度(4-25)
- 学生游玩安全注意事项
- 学生信息管理系统(文档模板供参考)
- 叉车门架有限元分析及系统设计
- 2014帮助残疾人志愿者服务情况记录
- 叶绿体中色素的提取和分离实验
- 中国食物成分表2020年最新权威完整改进版
- 推动国土资源领域生态文明建设
- 给水管道冲洗和消毒记录
- 计算机软件专业自我评价
- 高中数学必修1-5知识点归纳
- 2018-2022年中国第五代移动通信技术(5G)产业深度分析及发展前景研究报告发展趋势(目录)
- 生产车间巡查制度
- 2018版中国光热发电行业深度研究报告目录
- (通用)2019年中考数学总复习 第一章 第四节 数的开方与二次根式课件
- 2017_2018学年高中语文第二单元第4课说数课件粤教版
- 上市新药Lumateperone(卢美哌隆)合成检索总结报告
- 西门子
- connection
- 作为
- 实现
- 应用
- CP314
- WINDOW7操作系统环境下证书访问被拒绝解决方法
- 数据结构与数据库实验作业(最新)(1) (1)
- 经济地理学复习试题及答案
- PE工程师技术员绩效考核表1
- 江钻股份:独立董事关于董事会授权公司与江汉石油管理局沙市钢管
- 10.2 最短路径与选址问题
- 四川省说明文阅读练习
- C语言N02 C语言基本数据类型 2学时+2学时
- 2009-2013年浙江省家用厨房电器具制造行业经营状况分析年报
- 构建大学生朋辈心理辅导模式的思考
- 鲁教版八年级上册思想品德复习提纲
- 2022盐城公务员(时政)选调生成长心态调查
- 2011年第三季度中国激光打印机市场分析报表(简版)
- 数字示波器教程_示波器使用方法
- 徐州市新城区防洪规划中的问题及对策
- 铁塔基础施工控制点及控制点技术质量要求
- 土木工程概论复习题答案
- 九年级上册各科教材知识点复习
- 2014年湘潭市中考化学模拟试题(10-7)
- 2022年上半年《审计理论与案例》课程第一次作业