洲际酒店工程建设标准中英文对照版
1) STANDARDS SUMMARY
© InterContinental Hotels Group – Asia Pacific 2005 Revision All Rights Reserved
1
洲际酒店工程建设标准中英文对照版
1.1 1.2
SUMMARY
............................................................................................................................. 3
COMMON OMISSIONS AND PROBLEMS ......................................... 9
1.2.1 1.2.2 FIRE LIFE SAFETY .................................................................................. 9 MECHANICAL, ELECTRICAL AND PLUMBING .............. 11
© InterContinental Hotels Group – Asia Pacific 2005 Revision All Rights Reserved
2
洲际酒店工程建设标准中英文对照版
1.1
SUMMARY
Section
System General
RequirementsAll public areas fully air conditioned. Service areas ventilation except staff cafeteria, offices. HVAC in locations with average temp of o
13C >5hrs/yr.
AIR
CONDITIONING
Air changes & temperature
Guest rooms
13C/5
o
/
Public areas
As detailed in tables
Moderate climate: 4-pipe overhead fan coil, tropical: 2-
o
pipe. Temperature summer: 22C;
ooo
winter: 24C. Thermostat setting 23C +/- 3C.
4
o
o
2 o22C
24C
o
Swimming Pool – Indoors
23C +/- 3C
Fresh primary air/ exhaust: with thermal wheel heat recovery.
/ 90/85cbm/
Administration, Telephone Medium pressure multiple zone variable air
ooperator & Department head volume systems. 23oC. 23C
offices
Service areas
VAV with latent heat recovery. 28oC
o
28 C
Minimum fresh air/exhaust + inpidual fan coils
/ +
Staff cafeteria Computer room
Lift plant rooms
Laundry 100% fresh air/exhaust. 28C with spot cooling. o
100% / 28 C (
)
o
Kitchens Induction hood. 27C with spot cooling. o
27 C
oo
HVAC. 23C 23CIndependent self-contained unit. 23C.
o
23 C
Tropical locations: Self-contained unit, unless supplied by room exhaust
o
o
Equipment
洲际酒店工程建设标准中英文对照版
© InterContinental Hotels Group – Asia Pacific 2005 Revision All Rights Reserved
3
洲际酒店工程建设标准中英文对照版
ENGINEERING STANDARDS SECTION 1 – SUMMARY
Cooling Towers
Cross-flow/ induced draft-2speed fans. Not required
for air-cooled chillers. /
Boilers - Hot water
–
Cold climate <4C: 2 hot water units @
o
Warm climate >5C: 2@50%. of maximum demand. Diversity: 80%. 94% efficiency or heat pump.
o
<4 C 2 67%
2 units @ 100%. 3-pass water tubes boilers.
2 100%
o
Boilers – Steam
–
laundry.120
ppm cooling towers & hot water.
0 50 ppm
ppm
120 ppm
Dedicated water treatment systems for cooling towers, boilers, closed circuits heating & cooling
Water Treatment
洲际酒店工程建设标准中英文对照版
Kitchens Effluent
& Laundry
Grease traps for kitchen effluent. PH correction for laundry-as required.
PH
© InterContinental Hotels Group – Asia Pacific 2005 Revision All Rights Reserved
4
洲际酒店工程建设标准中英文对照版
ENGINEERING STANDARDS SECTION 1 – SUMMARY
Hot water
Duplex storage type with circulation pumps. Shell/tube heat exchangers. Where non-scale forming exterior plate/frame heat exchangers. General oo
supply: 60C. Dishwasher booster to 80C. Thermostatic anti-scald mixing valves in all public
o
areas to limit to 40C.
o
o
Irrigation
80 C
60 C
40 oC
Sub-surface automatic piping system
Storm drainage
Materials
Separate system discharging into sewer, combination sewer as per local situation.
Domestic water: copper or Pool, fountains, irrigation: PVC. Stand-pipe, sprinklers, heating, cooling: BS. Sewer: Cast iron or PVC (Insulated).
PVC
BS
PVC
Sewage Treatment Plant
As required and/or feasible for recycling.
/
Tub: 3.5 mm steel, white. Showerhead:
mixer. Tap:
6 ltrs/min. Toilet: 6/3 ltrs dual flush. 3.5 mm 13 / Requirements
Bathrooms
Section
System Supply
ELECTRICAL
Gas & Fuel
Swimming Pool
HV loop to air-cooled transformers rated at 2*100% or
3*50% capacity. High or low voltage 6/3
per local code & best tariff. Power factor correction. As per local conditions-most feasible supply.
2*100% –
Emergency Power
o
Dedicated water treatment. Indoor pool heated to 28C. 3*50%
o 28 C
Distribution
Emergency generator for all life safety systems, lifts, partial lighting, coldrooms, domestic & sump pumps & specific other equipment. Fuel, enough
for 48 hours. UPS for all computer equipment.
Guest Rooms
洲际酒店工程建设标准中英文对照版
© InterContinental Hotels Group – Asia Pacific 2005 Revision All Rights Reserved
5
洲际酒店工程建设标准中英文对照版
ENGINEERING STANDARDS SECTION 1 – SUMMARY
Lighting
As per interior designer, IC room & other standards.
Dimming for all public areas except corridors, rooms.
Audio-visual
MATV & Sound systems for all rooms, specific public areas. Pocket paging system.
Communication
system.
,
& Data See separate standards
Systems
ELEVATORS
Guest Elevators
Adequate number to answer all calls within 30 seconds for 50%, 45 sec. for 95%, 60 sec. for 100% of waiting persons. 30 50%
45 95% 1
Service Elevators
Minimum of two (2) units for hotels 400 rooms, but minimum of 50% of guest elevators. 400
2
Banquet
50%
Larger elevator to accommodate all guests within 30
minutes and transport exhibition goods (car etc).
30
Firemen's lift
As required by local code.
Escalators
As required by layout.
洲际酒店工程建设标准中英文对照版
© InterContinental Hotels Group – Asia Pacific 2005 Revision All Rights Reserved
6
LIFE SAFETY
Suppression
Fire Detection & Alarm
Fully sprinklered building, concealed quick response
type.
2.5" fire hoses in high rise; low rise at discretion of IHG
2.5"
Fire extinguishers throughout
Kitchen hood: Wet chemical ext. system
Computer room: Pre-action dry sprinkler
Section
System RequirementsInterfaces with paging systems, BMS, smoke control systems, elevator recall, other ext. sub-systems, door
洲际酒店工程建设标准中英文对照版
ENGINEERING STANDARDS SECTION 1 – SUMMARY
BMS
Guest rooms: Addressable smoke detector with integral acoustic alarm
Central Control Room
All high-rise
Emergency Power
Generator for all life safety systems, lifts, telephone
system, lighting: 15% public area, 20% service areas,
100% stairs, exit signs, GM's apartment, doctor's office, engineering office, generator & switchgear rooms. Vestibule in each guestroom.
15%
20%
100%
Non-life safety: sump pumps, domestic water refrigeration, computer systems
Emergency Exit Signs
Battery back-up
Atrium exhaust
Smoke Control
Stair pressurization in high-rise.
Guest rooms corridor smoke exhaust via ventilation system- built to higher standard.
–
Smoke Doors Can be omitted in fully sprinklered building-unless req. by local code.
Fire Dampers
All fire-rated walls. 2 hours and over. 2
ENERGY
MANAGEMENT
GENERAL UTILITY CONSUMPTION
Annual consumption shall not exceed per square meter net area the following in climate zones: Moderate: 145, Mediterranean: 155, Tropical: 200 KWh/sqm/year.
Electricity
洲际酒店工程建设标准中英文对照版
145
155
/
Peak demand: Moderate: 2.5 KW/room, Mediterranean: 2.7 KW, Tropical: 3.5 KW.
2.5 /
200 /
2.7 /
3.5 /
Energy (net calorific value
& net energy available at boiler discharge)
Annual consumption shall not exceed per square meter net area the following in climate zones: Moderate: 180, Mediterranean: 140, Tropical: 80 KWh/sqm/year.
&
180 /
140
80 /
© InterContinental Hotels Group – Asia Pacific 2005 Revision All Rights Reserved
7
洲际酒店工程建设标准中英文对照版
ENGINEERING STANDARDS SECTION 1 – SUMMARY
District heating peak demand: Moderate climate: KW/room. 6 /
6
Water
Moderate: 560 Tropical: 900.
ltrs/guest, 560 900/
/
Mediterranean:
600, 600/
Air Conditioning
K-factors for wall construction: 0.35; windows: 1.3.
K 0.35 1.3
boilers, heating etc.
Section
System Requirements
Centr. & screw chillers shall have an efficiency of
<0.55 KWh/ton, boilers: 91%.
& <0.55
KWh/ton 91%
Air conditioning systems shall be variable air volume
Thermal wheel heat recovery for all systems >10,000 cbm/hr. Indoor pool with latent heat recovery to heat pool water.
>10,000 cbm/hr
Secondary heating & cooling water systems shall have variable speed drives.
District heating: air conditioning systems shall be designed for maximum temp. spread, e.g.
o
70/50C, fan coils 60/40oC. Hot water heating shall have pre-heating via recovery from common return.
70/50C
o
60/40C
o
Building Automation system with detailed energy control functions.
PLUMBING
Induced draft cooling towers with variable speed fans, controlled from chiller for max. efficiency.
洲际酒店工程建设标准中英文对照版
© InterContinental Hotels Group – Asia Pacific 2005 Revision All Rights Reserved
8
洲际酒店工程建设标准中英文对照版
ENGINEERING STANDARDS SECTION 1 – SUMMARY
5
All toilets 6/3 ltrs dual flush.
6/3
All sink faucets in rooms, public areas, staff lockers 6
ltrs/min.
6 /
All showerheads in staff lockers 9 guest
rooms 13
ltrs/min.
9 / 13 /
Sub-metering of all major departments
Automatic sub-surface irrigation with timers, humidity
sensors.
Water treatment to all open systems to prevent scale
shall be recovered for further treatment to reduce losses by
90%.
90%
Laundry: Washing machines w. recovery or
tunnel washers.
洲际酒店工程建设标准中英文对照版
1.2 COMMON OMISSIONS AND PROBLEMS
1.2.1
FIRE LIFE SAFETY
© InterContinental Hotels Group – Asia Pacific 2005 Revision All Rights Reserved
9
Section
System ELECTRICAL
RequirementsCheapest electricity tariff. Power factor correction.
Peak demand control via BMS, where applicable
BMS
Lighting: Efficient compact fluorescent in all public areas, unless decorative effect restricts use.
All corridor lighting to shut off via timers or motion detectors. Exception: Emergency Exit Signs.
Motion detectors for public toilets, luggage room, staff lockers, cafeteria, banquet rooms
洲际酒店工程建设标准中英文对照版
ENGINEERING STANDARDS SECTION 1 – SUMMARY
1. Sprinklers are to be provided in all plantrooms.
2.
All fire rated doors must be certified as to their rating.
3. Fire dampers must be installed where air ducts penetrate 2-hr fire rated walls and floor and
must be fitted at the wall floor penetration.
2
4.
Dead end corridors must be minimum 8m in length in new constructions.
8
5.
Egress corridors must be minimum 1120mm in width.
11200
6. Exit doors must be minimum 815mm wide.
815
7. Fire Stairs must exit at ground level to an area outside the building.
8.
Smoke detectors are required in all areas, including store rooms, pantries and at the top of all
fire stairs.
9.
Smoke detectors to be spaced at 9-10m between adjacent detectors or 1 detector per 85m².
9-10 8.5
10.
25 detectors maximum per zone, all must be addressable.
25
11.
All fire pumps and jockey pumps must have status displayed at fire control room for running, fault and auto mode.
12. Guestroom detectors must have a buzzer or audible base.
13.
Common problems with detector locations include: too low from ceiling, too close to supply air grill, placed in nuisance areas.
14.
All wiring to smoke detectors, heat detectors, speakers must be class A. A
洲际酒店工程建设标准中英文对照版
15.
Evacuation speakers are required in all areas, including public toilets, staff areas, back of the house offices, boilers rooms, chiller rooms, switchgear rooms, Genset rooms, stores and elevators.
16.
Horn type speakers with strobes to be used where ambient noise level is high.
© InterContinental Hotels Group – Asia Pacific 2005 Revision All Rights Reserved
10
洲际酒店工程建设标准中英文对照版
ENGINEERING STANDARDS SECTION 1 – SUMMARY
17. Evacuation speakers to have fire proof back box.
18. Guestroom sidewall sprinklers to be extended coverage type, quick response.
19.
Sprinklers are required in bathrooms exceeding 5sqm.
5
Test drain to be provided after each flow switch in sprinkler pipework at convenient location.
20.
21.
Combustible ceiling voids over 800mm to have upper layer of sprinklers.
800
22. Piping to be hydrostatically tested at not less than 13.8 bars or 3.8 bar in addition to
highest
system pressure when system working pressure is 10 bars. (Not to exceed 12 bars)
13.8
10
12
3.8
23. Fire water reserve should be sufficient for one hour full operation.
24. Side wall sprinkler is often mounted too low from ceiling (150-300mm maximum).
150 – 300
25. Jockey pump oversized resulting in main sprinkler pump not operating when a
sprinkler is
activated.
26. Hose reels are to be located externally of the fire escape stairs.
27. Adjustable fog nozzles are required on hose reels.
28. Computer room to be protected with wet sprinklers.
29.
Sprinkler isolation construction valves left in system. All valves must be removed or have tamper proof alarm fitted.
30.
Dry pendant sprinkler heads are required in freezers and coolrooms.
正在阅读:
洲际酒店工程建设标准中英文对照版04-22
在Linux上配置FTP服务09-03
Tomcat配置技巧03-11
家长如何配合学校做好期末复习05-03
(最新)李莲英身首异处之谜(1)04-21
第五章 滴定分析法11-18
10.3摄影光圈快门1407-27
人生哲理的段落摘抄11-20
初中英语时态和语态专项练习题及答案09-03
税收宣传资料(四)01-04
- 教学能力大赛决赛获奖-教学实施报告-(完整图文版)
- 互联网+数据中心行业分析报告
- 2017上海杨浦区高三一模数学试题及答案
- 招商部差旅接待管理制度(4-25)
- 学生游玩安全注意事项
- 学生信息管理系统(文档模板供参考)
- 叉车门架有限元分析及系统设计
- 2014帮助残疾人志愿者服务情况记录
- 叶绿体中色素的提取和分离实验
- 中国食物成分表2020年最新权威完整改进版
- 推动国土资源领域生态文明建设
- 给水管道冲洗和消毒记录
- 计算机软件专业自我评价
- 高中数学必修1-5知识点归纳
- 2018-2022年中国第五代移动通信技术(5G)产业深度分析及发展前景研究报告发展趋势(目录)
- 生产车间巡查制度
- 2018版中国光热发电行业深度研究报告目录
- (通用)2019年中考数学总复习 第一章 第四节 数的开方与二次根式课件
- 2017_2018学年高中语文第二单元第4课说数课件粤教版
- 上市新药Lumateperone(卢美哌隆)合成检索总结报告
- 洲际
- 中英文
- 工程建设
- 对照
- 酒店
- 标准
- 道路桥梁工程毕业论文两篇
- 外研版英语九上完成句子练习
- 中国-欧盟GMP的异同
- 60后——80后保险规划
- 招商银行信用卡章程
- 直升飞机飞行模拟器解决方案
- 《计算机辅助设计二》课程标准
- 2015-2022年中国投影电视接收机市场调研及投资战略研究报告
- KS D 3504-2011韩标钢筋混凝土用钢筋
- 湖工单片机实验报告
- Book1.xls慢病随访质量评价表
- 人教版一年级下册语文生字表二组词
- 人脐血来源内皮祖细胞的分离、培养及鉴定
- 2013年河南省普通高校招生本科二批院校平行投档分数线(理科)
- 银行负责人先进材料 基层员工的领头兵
- 春节相关英语词汇大汇总
- 下学期初中文科组教研工作计划
- 顺德华侨中学2011年上期高一年级单元考试卷
- Reading reflection on Homer’s Odyssey 荷马史诗奥德赛英文读
- 法律服务委托合同书