IBM AS400 Security Procedures
更新时间:2024-04-25 04:44:01 阅读量: 综合文库 文档下载
- ibm体重指数推荐度:
- 相关推荐
IBM AS400 Security Procedures
Table of Contents
A. Purpose and Scope B. Preparatory Steps C. General information D. Standards E. Documentation F. Physical Security G. Backup Procedures H. Disaster Recovery
I. Implementation & Change Control
J. Operations/Processing
(Job Scheduling, Tape Library Management, Output Handling) K. System Security - General
System Security Values User Group Profiles Libraries Objects
System Utilities System Commands System Logs L. Physical Inventory M. Systems Performance N.
Preventative Maintenance
Page 1 2 3 5 6 8 9 11 12 16 19 20 27 34 35 36 37 39 41 42 43
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
A.
Purpose And Scope
This program is designed to enable the auditor to examine and test the effectiveness of controls and procedures at data centers using IBM System/34, 36, 38 and AS/400 computers.
Included in the audit program are suggested audit steps that are designed to obtain evidence that key control procedures are operating effectively.
The audit approach includes: background information, standards, documentation, implementation/change controls, backup procedures (including those financial files required by law - such as general ledger, payroll, receivables, sales, cost of sales and any master file/tables required to complete the financial information - such as chart of accounts, cost, price masters), disaster recovery, computer operations and logical access security.
This guide should be read through in its entirety before an audit is commenced in order to gain a thorough understanding of the audit approach.
The Appendix contains added information on classifying data and background information on the various machines that are covered in this audit program.
1
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
B.
Preparatory Steps 1.
Review existing corporate computer policies and guidelines and evaluate their impact on the planned audit scope.
Review the workpapers and response to the prior audit report. Obtain and review the current organizational chart for the relevant data center location.
Review the letter of recommendations issued by the external audit firm when evaluating the audit scope.
Document interviews and meetings with key audited personnel.
2.
3.
4.
5.
2
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
C.
General Information
1.
Document the type of data processing equipment, ownership, capacity and future expansion plans.
2.
Document the type of major software applications currently in production, who owns them and future development plans.
3.
Review insurance coverage for hardware, software, facility, etc.
4.
Determine if outside service bureaus or contract programmers are employed and list all applications processed or programmed.
5.
Review procedures for obtaining these services.
6.
Determine if any additional controls are provided to ensure all work performed by contract programmers is reviewed and approved.
7.
Evaluate the contract with the service bureau(s) or outside programmer(s) for ownership of data, confidentiality statements, etc.
8.
Review relevant job descriptions to ensure adequately defined duties, lines of responsibilities, etc.
9.
Verify that procedures are in place for management review of the daily history log of computer processing activity and program changes.
10.
Review EDP staffing policies relating to absenteeism, training, transfers and employee terminations.
11.
Verify that an EDP steering committee has been established and review objectives, members and frequency of meetings.
GENERAL
C/PROG
3
Page 1 of 2
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
C.
General Information (continued)
12.
Review minutes of steering committee and management policy meetings to identify EDP activities and progress on these projects.
13. Review management reports for evidence of management review and coordination of EDP activities.
14.
Review EDP budget versus actual cost reports to ascertain whether data center resources are properly monitored.
15.
Review procedures that are in place for the evaluation and approval of computer equipment and software packages prior to acquisition and implementation.
GENERAL
C/PROG
4
Page 2 of 2
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
D.
Standards
1.
Document who is responsible for creating and updating policies and procedures for the EDP Standards Manual.
2.
Verify that the EDP Standards Manual contains an adequate explanation of the policies for EDP procedures.
3.
Verify that the EDP Standards Manual contains: a.
Detailed procedures regarding the preparation of documentation for application systems.
b.
Conventions to be used in the development of programs.
c.
Standard forms, illustrations and their use.
d.
Security requirements for both the applications and the computer itself.
e.
Operational standards for the EDP department and surrounding areas.
STANDARDS
D/PROG
5
Page 1 of 1
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
E.
Documentation
1.
Document who is responsible for creating, maintaining and distributing application documentation.
2.
Verify that there is a formal, signed approval of each element of documentation at an appropriate management level.
3.
Verify that the documentation is maintained in secure on-site and off-site storage facilities.
4.
Verify that all major applications processed on the computer system have appropriate levels of corresponding documentation.
5.
Review selected application documentation against corresponding software programs to ensure that documentation is accurate, complete and current.
6.
For each application, verify that corresponding System Documentation contains an overview that includes: a.
The general nature and purpose of the system.
b.
The functional requirements of the system.
c.
The logical flow of the system or flow charts.
7.
For each application, verify that corresponding Program Documentation contains:
a.
Descriptions of each program and system interfaces.
b.
Input and output description.
c. Description of program logic and flow. d.
Record layouts and file descriptions.
DOCUMENTATION
E/PROG
6
Page 1of 2
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
E.
Documentation (continued)
8.
For each application, verify that corresponding User Manuals are developed, which describe the operations performed and contain: a.
Application description.
b.
Procedural requirements.
c.
Sample reports and input screens.
d.
Source documents required.
e.
Description of screens, edits, etc.
9.
Verify that current computer Operating Instructions contain:
a.
Set-up instructions.
b.
Operating system requirements.
c.
Restart and recovery procedures.
d.
Emergency procedures.
e.
Listing of program messages, responses, etc.
DOCUMENTATION
E/PROG
7
Page 2 of 2
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
F.
Physical Security 1. 2.
Verify that the building is protected by an automatic fire extinguishing system, appropriate to the environment.
Verify that the computer room is equipped with appropriate classes and sufficient number of clearly visible fire extinguishers. Determine whether there are sufficient fire and smoke alarms appropriate to the environment.
Ensure that all exits and evacuation routes are clearly marked. Ensure that smoking is prohibited in the computer room. Document the provisions made to detect and report fires on a timely basis.
Review provisions for preventing water damage to the equipment. Verify that the computer room is accessible to only authorized personnel.
Document computer room layout and location of all major hard- ware components.
Document the procedures in place for notifying security when an employee is no longer allowed access to the building.
Review established emergency procedures for the data center, which should include at a minimum: a. b. c.
Turning off data processing equipment.
Turning off electrical power to the computer room. Evacuation of personnel.
3.
4.
5.
6.
7.
8. 9.
10.
11.
12.
13.
Review procedures for maintenance of appropriate temperature levels, periodic maintenance/inspection of equipment.
F/PROG
Page 1 of 1
PHYSICAL SECURITY
Ensure that all emergency procedures have been posted or distributed to all personnel.
8
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
G.
Backup Procedures
1.
Obtain a copy of the formal backup schedule for creating copies of production program and data files.
2.
Describe how the company determines which files are to be saved and how often. Also, describe the number of generations of files kept.
3. Describe backup procedure for the following:
a.
Production programs and procedures for both source and object code.
b.
Systems documentation.
c.
Operating system or other software.
4.
Verify that the frequency of backups is appropriate for the environment.
5.
Describe the secured area designated for on-site storage of backup media.
6.
Document who has authorized access to on-site backup area.
7.
Describe the off-site storage facility and the contents.
8.
Ensure that access to the off-site storage facility is restricted to only authorized personnel. List their names and functions.
9.
Review the arrangement for a computer backup site, for appropriate telecommunications facilities, operating systems, etc.
BACKUP PROCEDURES
G/PROG
9
Page 1 of 1
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
Testing (Backup Procedures)
1. Select a critical application to be tested based on the scope of
the review.
2. Obtain a current backup schedule for the programs and data files
selected.
3. Identify critical files used with this application on the Volume
Table Of Contents (VTOC) listing.
4. Trace files on the VTOC to the backup schedule.
5. Locate backup files in on-site storage.
6. Verify that dates on backup media agree with backup schedule.
7. Locate backup files on off-site storage. 8. Verify that dates on backup media agree with backup schedule. 9. Describe the contents of off-site storage facility.
BACKUP PROCEDURES G/TEST
10
Page 1 of 1
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
H. Disaster Recovery 1. Obtain a formal copy of the company's current disaster recovery plan.
2.
Obtain the company's list of employees and vendors to be contacted in the event of an emergency.
3.
Describe the method and extent of user involvement in the creation and maintenance of the plan.
4.
Ensure that all critical systems have been identified.
5.
Review interim manual procedures, prepared for users to continue processing critical transactions, for completeness.
6.
Review the documented results from the test of the disaster recovery plan.
7.
Review the disaster recovery plan for completeness. Some items to be considered in the review are: a.
Possible alternate processing sites.
b.
Alternate sites tested at least annually.
c.
Agreement exist for the use of the alternate sites.
d.
Availability of peripheral equipment.
e.
Defining critical systems to be processed.
f. Ability to process without key personnel.
g.
Ability to adapt plan to lesser disasters.
DISASTER RECOVERY
H/PROG
11
Page 1 of 1
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
I.
Implementation/Change Controls 1.
Verify that a formal method of project control has been established which covers all phases for the development of new/modified systems.
Document the method and reports used to control and prioritize projects.
Review the justification proposal created for all new systems, or major enhancements to existing systems, which may include: a.
Scope and purpose of the system User requirements. Cost analysis. Time estimates.
2.
3.
b.
c.
d.
4.
5.
a.
b.
c.
d.
e.
6.
CHANGE CONTROL
I/PROG Page 1 of 3
Ensure the programming phase is properly supervised by EDP management.
Completion of a programming checklist. Required approval points.
Adherence to programming standards. Target dates for completion. The assignment of programmers.
Ensure that a detailed plan has been prepared and documented which should include:
Document the approval process to ensure that a steering committee or top management is involved.
12
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
I.
Implementation/Change Controls (continued) 7. 8.
Verify that programmers perform all development work only in test libraries and using test data.
Document testing procedures established for all new/modified systems.
Ensure that users participate in the creation of test.
Verify that test results are reviewed by both EDP and User management to provide compliance with specifications.
Review the plan for converting new/modified systems from development to production. Does it include at a minimum: a. b. c.
The training of users.
Completion of documentation.
Defining user access requirements.
9.
10.
12.
13.
14.
15.
16.
CHANGE CONTROL
I/PROG Page 2 of 3
Ensure that a designated official regularly reviews changes not yet implemented.
Verify that all program changes are supported by appropriate authorization.
Verify that programs are recompiled after modifications, prior to being placed into production.
Document the process used to transfer completed programs from test to production libraries.
13
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
I.
Implementation/Change Controls (continued) 17.
Verify that procedures are in place for saving current versions of programs to diskette/tape prior to substituting the new programs to allow for restoration of the older version in case of program problems.
Review procedures in effect to ensure that changes are correctly made and approved, when immediate modifications have to be made to production programs, bypassing normal procedures. Examine evidence for documentation being created or updated, including: a. b.
Operator instructions. Data entry instructions. User manuals.
System Documentation.
18.
19.
c.
d.
20.
21.
22.
CHANGE CONTROL
I/PROG Page 3 of 3
Describe how user access requirements are defined, how passwords are assigned and who are authorized to perform these activities.
Review evidence that old versions of programs are saved before making final changes.
Review evidence of final approval before project is transferred to projection library.
14
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
Testing (Implementation/Change Controls)
Select a representative number of completed program changes or new programs and trace from the initial request to the completion phase, performing or reviewing the following steps:
1. Ensure that user management has evidenced their approval on
the initial project request form.
2. Describe the method of prioritizing requests submitted to steering
committee or management for major projects.
3. Review log or method used to control all requests to ensure they
are being followed up.
4. Determine if cost for purchase versus in-house development was
considered.
5. Document method of assigning programmers to the project.
6. Review procedures for approval and progress reporting.
7. Examine project progress reports for evidence that systems
development is controlled in accordance with established procedures.
8. Detail method used to create test data.
9. Ensure that EDP and user management evidence their review
and approval of test results.
10. Review evidence of programmer having completed all necessary
steps:
a. File specifications. b. Program specifications. c. Files created. d. Test results filed.
CHANGE CONTROL I/TEST
15
Page 1 of 1
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
J.
Operations/Processing
1.
Obtain a copy of the EDP department work schedules for computer processing to ensure:
a. There is adequate staffing for each area of work.
b.
All tasks are accomplished in a timely manner to meet user requirements.
2.
Ensure schedules are periodically reviewed to determine if they are current.
3.
Review the computer activity log, which is maintained for all work performed and any errors that occur, and compare it to the workload schedules to determine if schedules are satisfactorily met.
4.
Describe how frequently the computer activity utilization reports are reviewed.
5.
Review the operator’s manual, which should include job control procedures, operating instructions and computer facility maintenance requirements.
6.
Document the procedures in place for the periodic review and update of the operator’s manual.
7.
Describe the times the computer is operational and the various shifts that are maintained.
8.
Ensure adequate cross training of EDP personnel has occurred for continued functioning of the computer if the operator is absent.
9.
Determine if a concentration of duties exists and if compensating controls are in place.
OPERATIONS/PROCESSING
J/PROG
16
Page 1 of 3
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
J. Operations/Processing (continued)
10. Review procedures in place which would allow management to detect if operators process unauthorized jobs.
11.
Review procedures to control access to and usage of production files stored on diskette or tape.
12.
Review procedures for the proper handling of diskettes or tapes, which include:
a. External labeling requirements. b. Internal labeling requirements.
c.
Provisions to ensure only the correct diskettes or tapes are used.
13.
Describe the transmittal form used to control the movement of each batch of source documents or input forms between the users and data entry.
14.
Ensure that batches are identified by a serial number or sequence number to provide subsequent accountability and for reference purposes.
15.
Review completed batches for specially marked indicators to prevent duplication or omissions.
16.
Obtain a copy of the log maintained in the data entry area to record the flow of batches. Is a similar log maintained in user departments.
17.
Review procedures for requirement of data entry personnel to contact users if there are any errors in batches prior to input.
18.
Describe the method of storing the source documents while they are in the custody of the EDP department.
OPERATIONS/PROCESSING
J/PROG
17
Page 2 of 3
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
J.
Operations/Processing (continued) 19.
Obtain a copy of the current output distribution list. What about output ques? Are they separated for confidential reports (payroll, accts payable, etc.)?
20. Review output distribution list for accuracy, completeness, etc. 21.
Document flow of output, to ensure proper safeguards are placed on the output, until it arrives in the user departments.
22.
Review procedures for output, which should include:
a. Review of all output for completeness. b. All errors are recognized and reported. c. Batch totals match output totals.
d.
Confidential outputs handled properly.
23.
Review the tape inventory list.
a. Are scratch tapes all accounted for (in scratch bin and missing from tape rack).
b.
Are other empty slots accounted for.
24.
If the tape inventory is separated by machine:
a. are the tapes physically segregated?
b. are the tapes identified in some way so as to distinguish one set of tapes from the other (color coordinated - as an example)?
c.
is the serial number sequence unique?
OPERATIONS/PROCESSING
J/PROG
18
Page 3 of 3
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K. SYSTEM ACCESS CONTROLS
Objective: To ensure that system security options are appropriately set to
provide an adequate level of logical security.
Procedures:
K.1 System Access Security - General
K.1.1 Ensure that all security files are backed-up to diskette/tape every time
they are changed.
K.1.2 Document who has access to the system console.
K.1.3 Document applications that cannot be secured using built-in system
security and ensure that the following controls are programmed into the application:
1. edits on data fields. 2. secondary passwords. 3. exception reports. 4. audit trails.
K.1.4 Ensure that EDP duties are separated from user department duties.
K.1.5 Ensure that the responsibility of controlling diskettes/tapes is separated
from that of programming or processing transactions.
K.1.6 Ensure that the responsibility of monitoring computer activity is separate
from that of programming and operating.
K.1.7 Review cross training procedures to ensure there is no segregation of
duties problem.
K.1.8 Determine if procedures have been developed for reporting and
following-up on security violations.
K.1.9 Determine the required length of passwords. [Recommend 6 to 8]
K.1.11 Review the procedure in establishing the initial user-id. [How is the user-id established, how is the user informed, is the password set at expired, etc.]
SYSTEM SECURITY K/PROG
19
Page 1 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.2 System Security Values - Cont'd
K.2.1.1 Determine who is/are assigned the QSECOFR profile.
All system inquiries in this section must be made with the QSECOFR profile as any others won't have enough privilege. The person holding the QSECOFR profile is typically the master security officer or someone of high management level.
K.2.1.2 Review other duties performed by the Master Security Officer (MSO) to
ensure they do not conflict with the responsibilities required by the MSO position (e.g. if the MSO is a programmer).
K.2.2 System values are defined by the client. Obtain the system values report
which lists all system values together with a brief description of each value by entering the following command:
WRKSYSVAL
The system values can also be displayed one by one on the terminal by using this command:
DSPSYSVAL SYSVAL (system value)
To print one by one use the command:
WRKSYSVAL *SEC OUTPUT(*PRINT)
System values are defined by the client according to their specific and unique security requirements. Security could be compromised if options are changed or inappropriate.
All possible options of each system value are listed and explained in this audit program as a guide. IBM default values are underscored.
SYSTEM SECURITY K/PROG
20
Page 2 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.2 System Security Values - Cont'd
K.2.2.1 Determine the system security level:
QSECURITY
10: No user authentication, no resource protection.
20: User authentication through password security only, no resource
protection.
30: User authentication and default resource protection.
40: Similar to level 30 but controls privileged instructions and the
machine interface.
E&Y recommended value: 30.
Level 40 should be considered for clients with high inherent risk. It prevents direct access to objects, data of other jobs and internal system programs.
K.2.2.2 Determine the maximum number of sign-on attempts allowed:
QMAXSIGN
NOMAX: the system allows an unlimited number of sign-on attempts.
15: a user can try to sign on a maximum of 15 times.
After the specified maximum number of invalid sign-on attempts is reached, the terminal is varied (forced) off and a message is logged.
E&Y recommended value: maximum of 3.
SYSTEM SECURITY K/PROG
21
Page 3 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.2 System Security Values - Cont'd
K.2.2.3 Determine action taken by system when QMAXSIGN is exceeded:
QMAXSGNACN
1: disable terminal.
2: disable user profile.
3: disable terminal and user profile.
E&Y recommended value: 3.
K.2.2.4 Determine the user-selected options related to password security:
? QPWDEXPITV - password expiration interval
*NOMAX: unlimited number of days.
1-366: valid range of days.
E&Y recommended value: 30-90 days.
? QPWDRQDDIF - duplicate password control.
0: can be identical as the previous 32 passwords.
1: must be different from the previous 32 passwords.
E&Y recommended value: 1.
? QPWDMINLEN - minimum password length
1: minimum of 1 character.
1 - 10: valid range of number of characters.
E&Y recommended value: 6 or more.
SYSTEM SECURITY
22
K/PROG Page 4 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.2 System Security Values - Cont'd
? QPWDMAXLEN - maximum password length.
10: Maximum of 10 characters.
1 - 10: Valid range of number of characters.
E&Y recommended value: 7-8 if connecting to systems other than AS/400 or S/38.
? QPWDVLDPGM - password validation program.
*NONE: no password validation program is used.
Review specified program(password exit routine) used, if any, and ensure that it does not allow user to bypass password security and does not contain hard-coded passwords.
K.2.2.5 Determine if users with all object (*ALLOBJ) or service (*SERVICE)
special authorities may sign on to only work stations they have specific authority to access.
QLMTSECOFR - limit security officer device access.
0: allows all users with *ALLOBJ authority to sign on to any display
station, and users with *SERVICE can sign on to any display station with public authority of *CHANGE.
1: not allow users with *ALLOBJ or *SERVICE authorities to sign on any
work stations unless they have specific authority to access.
E&Y recommended value: 1.
SYSTEM SECURITY K/PROG
23
Page 5 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.2 System Security Values -Cont'd
K.2.2.6 Determine the appropriateness of time-out system value:
QINACTITV - inactive job time-out.
*NONE: no time out.
5 - 300: valid range for maximum minutes before time-out.
E&Y recommended value: 15.
Terminals left unattended for an extended period of time may be used by unauthorized persons to perform functions that are available under that session, possibly affecting production data and processing. In addition, unauthorized users of unattended terminals may remain unidentifiable.
Authorized users can re-key their user-ids and passwords to continue from the screen left off in the previous session. This is possible when we set the disconnect job (*DSCJOB) value to disconnect any interactive, secondary or group jobs. Alternatively, *ENDJOB can be used. However, this will end any job, secondary or group.
K.2.2.7 Determine if concurrent device sessions are limited:
QLMTDEVSSN - limit device sessions.
0: does not limit the use of a user-id to one work station at a time.
1: limits the use of a user-id to one work station at a time.
E&Y recommended value: 1.
SYSTEM SECURITY K/PROG
24
Page 6 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.2 System Security Values -Cont'd
K.2.2.8 Determine if sign-on information is displayed on screen.
QDSPSGNINF - sign-on display information control.
0: no sign-on information is displayed upon sign-on.
1: users are shown:
? date and time of last sign-on.
? invalid sign-on attempts since last sign-on.
? when applicable, a warning that the password is due to expire in
seven days or less.
This information can alert users to unauthorized attempts to use their profiles to access the system.
The sign-on screen should show a restricted access message such as \should also not show the company, system, and application names.
E&Y recommended value: 1.
K.2.3 Changing the Automatic Configuration of Virtual Devices Value
The QAUTOVRT values controls the creation of virtual device descriptions on a remote system when users pass-through to that system.
The system value QAUTOVRT specifies if pass-through virtual devices (as opposed to the workstation function virtual device) are automatically configured. This value can only be changed by the security officer or someone with all object (*ALLOBJ) and security administrator (*SECADM) special authority.
The value of QAUTOVRT should be set as low as possible. In most cases the value of 0 (zero) or 1 (one) is recommended. How ever in some locations where the passthrough activity is higher, it should be set as low as possible to minimize logon opportunities of unauthorized users.
SYSTEM SECURITY K/PROG Page 7 of 22
25
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.2 System Security Values -Cont'd
K.2.4 Changing the Remote Sign-on Value
The QRMTSIGN value controls if users can bypass the sign-on display on the remote system when using the display station pass-through function or the workstation function of PC support.
The possible values are:
? FRCSIGNON: All pass-through sessions that begin on the system
must go through the normal sign-on procedure.
?
SAMEPRF: Pass-through sessions without going through the sign-on procedure are allowed only for users whose user profile name on the remote system is the same as the user profile name on the local system
?
VERIFY: Pass-through sessions without going through the sign-on procedure are allowed for all pass-through requests and no checking of passwords is done if the QSECURITY value is 10. Must sign-on if QSECURITY value is 30.
?
REJECT: Pass-through sessions are not allowed to start on the remote system.
K.2.5 Create Authority Parameter in System Value
Review the QCRTAUT parameter on the system values report, and ensure that it has been changed from the default value of *CHANGE, to a setting of *USE or less.
Determine that the production database and production source code files are maintained in a library with appropriately restricted access. Or, use the Display Object Authority command and determine whether the Public Authority Access (PUBAUT) access parameter for each significant individual production database and production source code file is *EXCLUDE and individual access allowed are appropriate.
SYSTEM SECURITY
K/PROG
26
Page 8 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.3 User/Group Profiles
Objective: To ensure that user or group profiles are authorized and defined
appropriately to maintain adequate segregation of duties.
Procedures:
K.3.1 Obtain all user and group profiles by entering the command:
DSPAUTUSR SEQ (*GRPPRF)
K.3.2 Inspect each significant group profile to ensure that it is authorized by
appropriate management personnel and covers a common group of users with a common function. Ensure that only one group profile is assigned to a user.
K.3.3 Inspect selected user profiles to ensure that they are authorized by
appropriate management personnel and that their settings are compatible with their work functions.
K.3.4 A number of IBM user profiles are pre-defined when the system is
shipped. The passwords to these user profiles are identical to the user profile names, except for DST's which is \ Determine that the client has changed the passwords for these user profiles:
User Profile Description QSECOFR security officer QSRV full service functions QSRVBAS basic service functions QSYSOPR system operator QPGMR programmer QUSER work station user DST Dedicated Service Tools
Note: QSRVBAS and QSRV passwords should be changed after every maintenance trip by authorized IBM personnel. Vendor-supplied passwords for any commercial software products should also be changed.
SYSTEM SECURITY K/PROG
27
Page 9 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K. 3 User/Group Profiles - Cont'd
K.3.4.1 Signing on with IBM-supplied user profiles that are designed to be object
owners is not permitted. Use a DSPAUTUSR list to verify that the following IBM-supplied user profiles have a password of *NONE:
QDBSHR QDFTOWN QDOC
QTSTROS
QDSNX QFNC QGATE QLPAUTO QLPINSTALL QSNADS QSPL QSPLJOB QSYS
K.3.5 Obtain a listing of user and group profiles using the following command:
To get to magnetic file: Enter [DSPUSRPRF]: press (PF4): Select output file and name the file: have the file transferred to a PC or XCOMM to mainframe where Office Services will copy the file/s to audits cc 0820 G drive.
DSPUSRPRF USRPRF(profile name) TYPE(*BASIC)
For each profile review the following settings:
K.3.5.1 GROUP (Group Profile)
Determine if members of each group are related to a common user function.
K.3.5.2 PWDEXPITV (Password Expiration Interval) UPGRPF
*SYSVAL: system default specified in QPWDEXPITV
If a number is specified it means that a specific interval has been set for this user.
K.3.5.3 CURLIB (Current Library) UPCRLB
Determine that the specified library is suitable to the user function. Ensure that this library is adequately secured.
SYSTEM SECURITY K/PROG
28
Page 10 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.3 User/Group Profiles - Cont'd
K.3.5.4 LMTCPB (Limited Capability) UPLTCP
Specifies whether the user can change the initial program, initial menu, current library and attention-key-handling program values.
*NO: user may change all the values in his own user profile with the
CHGPRF command.
*PARTIAL: the initial program and current library values cannot be
changed. The initial menu value can be changed (using CHGPRF) and commands can be run from the command line of a menu.
*YES: the initial program, initial menu and current library values
cannot be changed. Some commands can be run on the command line of a menu.
E&Y recommended value: *YES for production users.
K.3.5.5 SPCAUT (Special Authority) UPSPAU
*ALLOBJ - allows unlimited access to almost every object *SECADM - allows administration of user profiles
*SAVSYS - for saving and restoring the system and data
*JOBCTL - allows manipulation of work queues and subsystems *SERVICE - allows many uncontrolled functions *SPLCTL - allows control of spool functions
*USRCLS: - user given special authorities that are appropriate for his
class
*NONE - no special authority assigned
Determine if the special authority assigned to each user class is suitable.
Generally, users and programmers should not have any special authorities. SECADM, QSECOFR, and SYSOPR by default, have *SAVSYS and *JOBCTL special authorities. IBM engineers may have *SERVICE.
E&Y recommendation: *PUBLIC must be set to *EXCLUDE.
SYSTEM SECURITY K/PROG
29
Page 11 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.3 User/Group Profiles - Cont'd
K.3.5.6 INLPGM (Initial Program) UPINPG
*NONE: No initial program is used. User is given access to the
command level.
The initial program may not provide a way to exit from the program except to sign-off.
If a menu name is specified in the initial menu parameter then that menu is displayed. Ensure that there is no option in the menus/sub-menus to exit and access the command level.
K.3.5.7 INLMENU (Initial Menu) UPINMN
*SIGNOFF: the user will be signed off the system once the initial
program ends.
Menu security limits a user's capabilities and restricts the user to a predefined secured environment. The initial menu appears after the initial program terminates. Ensure that users are assigned menus and menu options that are suitable for their job functions.
The advantages of menu security are that it is easy to implement and therefore, incurs low security management cost; and provides ease to use interface.
Caveat: Initial menus are mostly user-defined and therefore, may contain loop-holes. The application design is critical to menu security.
E&Y recommendation: Use the limited capability approach where appropriate with library and object security.
K.3.5.8 LMTDEVSSN (Limit Device Sessions) UPLDVS
*(SYSVAL: the system value selected determines if the user is
limited to one device session.
*NO: does not limit the use of a user-id to one device session.
*YES: limits the use of a user-id to one device session.
E&Y recommended value: *YES or *SYSVAL and QLMTDEVSSN - Set to Option One(limit number of device sessions to one).
SYSTEM SECURITY K/PROG
30
Page 12 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.3 User/Group Profiles - Cont'd
K.3.5.9 STATUS (Status of user profile) UPSTAT
K.3.5.10
K.3.5.11
Specifies whether the user profile is usable or not.
*ENABLED: profile is usable.
*DISABLED: profile is not usable.
E&Y recommendation: Inactive or dormant user profiles should be set to *DISABLE to prevent unauthorized usage.
Note that system profiles such as QSYS, QSECOFR, etc. must be set to *ENABLE.
Obtain a list of user profiles and review for the following: 1. Identify the users permitted access to individual and each group
profile.
2. Determine if all users are permitted access based on written
authorization by Departmental Management.
3. Confirm that all users are currently employed.
Determine whether unauthorized users can process critical
functions from their menu(s).
SYSTEM SECURITY K/PROG
31
Page 13 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.3 User/Group Profiles - Cont'd
K.3.6
List all programs which adopt the privileged QSECOFR authority: DSPPGMADP USRPRF(QSECOFR)
[optional
?OUTPUT(*PRINT)? to print]
Plan for running the above command overnight as it slows down the system.
Adopted authority provides a means to handle situations where programs or commands called by a user may require a higher level of authority than is normally available to that user. It allows a user to adopt the authority of the owner of a program whenever it executes, in addition to the authority of the user. This provides a method to give a user more access to objects, but the user is limited to the program function during execution.
K.3.6.1 Determine if the security officer is aware of such programs and if he/she
evaluates any new ones that use the adopted authority.
E&Y recommendation: The security officer should monitor programs that adopt the privileged QSECOFR authority.
K.3.7 Ensure that a security and password policy or guideline has been
developed which includes:
1. the secure assignment and distribution of passwords.
2. password selection criteria.
3. change or immediate removal of terminated employee's
passwords. (Obtain report on Previous Signon Date)
4. periodic changing of passwords.
5. training users in the necessity of password secrecy and sign-off
of workstations when not in use.
6. actions to be taken for attempted security violations.
SYSTEM SECURITY K/PROG
32
Page 14 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.3 User/Group Profiles - Cont'd
K.3.7 Obtain a list of authorized users using the following command. DSPAUTUSR
This list contains user profile, password last change date and user profile description. By reviewing the password last change dates, determine if passwords are changed within a reasonable interval of time [i.e., within a reasonable QPWDEXPITV value (see Procedure K.3.2.4)].
SYSTEM SECURITY
K/PROG
33
Page 15 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.4. Libraries
Objective: To ensure that appropriate access authority is defined at the
library level in order to protect production data files and programs from unauthorized access.
Library security establishes security at the library level and it assumes that a nonspecific protection is adequate. To have specific protection over individual objects within a library, object level security is needed. See section 2.4..
Procedures:
K.4.1 Obtain a list of all libraries in the system:
DSPOBJD OBJ(QSYS/*ALL) OBJTYPE(*LIB) OUTPUT(*PRINT)
Determine that the production objects are segregated in separate libraries from the development objects.
K.4.2 Select a sample of significant production libraries. List the contents
(objects) of the selected libraries:
DSPLIB (Library Name)
Ensure that only production objects are in production libraries.
K.4.3 List the object authorities for the above significant production libraries:
DSPOBJAUT OBJ(QSYS/library name) OBJTYPE(*LIB)
Determine that only authorized users or groups have access. Development users should have no access to production libraries. Also determine if the owner of the library is appropriate.
K.4.4 Review administration and authorization procedures for granting access
to significant libraries.
E&Y recommendation: Library level security is strongly recommended as it provides a relatively easy and effective method of securing objects within libraries. Libraries should be structured in a way that all objects within a library have identical security requirements.
SYSTEM SECURITY K/PROG
34
Page 16 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.5 Objects
Objectives: To ensure that appropriate access authority is defined at
the object level in order to protect specific production data files and programs from unauthorized access.
Object security establishes security at the specific object level. It is used when different objects require different protection requirements. The client may choose to protect specific sensitive objects at the object level if their inherent risk is high or if library level protection is not used. It can also be used as an exception to the general authorization rules.
Procedures:
K.5.1 Select a sample of sensitive production objects (data files or source
programs) and print their specific object authorities:
DSPOBJAUT OBJ(library/file) OBJTYPE(*FILE) (for files), and
DSPOBJAUT OBJ(library/program) OBJTYPE (*PGM) (for programs).
K.5.2 Ensure that only authorized users or groups may access or use the
sensitive objects.
K.5.3 Review administration and authorization procedures for granting
access to significant objects.
E&Y recommendation: Since assignment of object authorities to specific objects is tedious, specific object authority should only be defined to handle exceptions; otherwise, the default public authority should be used.
SYSTEM SECURITY K/PROG
35
Page 17 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.6 System Utilities
Objective: To ensure that powerful system utilities are adequately
restricted from unauthorized access and use.
The following are powerful system utilities:
SST System Service Tools DST Dedicates Service Tools DFU Data File Utility SEU Source Entry Utility SDA Screen Design Aid PDM Programming Development Manager QUERY Query Language
Procedures:
K.6.1 Determine who has access to the above utilities:
? DSPOBJAUT OBJ(QSYS/STRDFU) OBJTYPE (*CMD).
? DSPOBJAUT OBJ(QSYS/STRSEU) OBJTYPE (*CMD).
? DSPOBJAUT OBJ(QSYS/STRSDA) OBJTYPE (*CMD).
? DSPOBJAUT OBJ(QSYS/STRPDM) OBJTYPE (*CMD).
? DSPOBJAUT OBJ(QSYS/STRQRY) OBJTYPE (*CMD).
Only authorized programmers should have access to these utilities.
E&Y recommendation: *PUBLIC access should be set to *EXCLUDE, not *USE.
SYSTEM SECURITY K/PROG
36
Page 18 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.7 System Commands
Objective: To ensure that powerful system commands are adequately
restricted from unauthorized use.
The following are powerful system commands:
* CRTUSRPRF Create User Profile * CHGUSRPRF Change User Profile * DLTUSRPRF Delete User Profile * RSTUSRPRF Restore User Profile
?? CHGDSTPWD Change Dedicated Service Tool Password
RSTAUT Restore Authority # STRSST System Service Tools ~ CRTAUTHLR Create Authority Holder ? DLTAUTHLR Delete Authority Holder ?? SAVSYS Save the System
~ CHGSYSLIBL Change System Library
CHGSYSVAL Change System Value
* Restricted to the security administrator (QSECADM) and security
officer (QSECOFR) only. PUBLIC access is irrelevant. A user cannot use these commands even if he/she has *ALLOBJ special authority.
# Restricted to the service engineer (OSRV) only. ~ Restricted to the security officer (QSECOFR) only.
? You need the DST security password to change the DST passwords. ? Restricted to *SAVSYS capability holder. ? *PUBLIC should be set to *EXCLUDE.
See the sensitive command object authority matrix.
SYSTEM SECURITY K/PROG
37
Page 19 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.7 System Commands - Cont'd
Procedure:
K.7.1 Review the object authority to the above significant security related
commands:
DSPOBJAUT OBJ(QSYS/cmd) OBJTYPE(*CMD).
Ensure that only authorized personnel may use these commands.
E&Y recommendation: Public authority of these commands should be set at *EXCLUDE.
Command source object contains the source code for all the CL commands and is used to recompile any one or all commands. Only the security officer and users with the *ALLOBJ special authority may access this object. It is not necessary for a user to have access to this object in order to access the CL commands.
SYSTEM SECURITY K/PROG
38
Page 20 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.8 System Logs
Objective: To ensure that system access and operational activities are
monitored regularly by appropriate personnel.
Procedures:
K.8.1 Obtain the printed system log, if any, and scrutinize it for evidence of
review (e.g., initials, sign-offs) by appropriate personnel, typically the Systems Administrator or the Security Officer.
Note: Typically, the full system log is not printed because it is too voluminous. They normally review the log on-screen.
The following is a general format of the command to display messages recorded in the history log:
DSPLOG LOG(QHST) PERIOD (start-time start-date) (end-time end-date) MSGID (message-identifier) OUTPUT(*PRINT){of OUTPUT(*)}
Most security messages are in the range CPF2201 to CPF2299. The message number CPF2200 should be entered if all messages in the range is required. For example, CPF2234 means incorrect password. CPF2240 means inadequate authority to object.
K.8.2 Print the \Object Authority\list of the QHST object by the
following command:
DSPOBJAUT OBJ(QHST) OBJTYPE(*MSGQ) OUTPUT(*LIST).
Determine that only the Security Officer has access to the QHST object and that PUBLIC be set to *EXCLUDE.
SYSTEM SECURITY K/PROG
39
Page 21 of 22
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
K.8
K.8.3
System Logs -Cont'd If the system log is not used, determine if the auditing journal (QAUDJRN) is generated and reviewed.
The Security Officer can monitor security by gathering audit information about specific security-related events. This can be achieved by performing the following steps:
(1) Create journal receiver:
CRTJRNRCV JRNRCV(user-lib/user-name1) AUT(*EXCLUDE)
(2) Create journal:
CRTJRN JRN(QSYS/QAUDJRN) JRNRCV (user-lib/user-name1) AUT(*EXCLUDE)
(3) Change system value:
CHGSYSVAL QAUDLVL VALUES ('AUTFAIL *SECURITY *PGMFAIL ...'
The QAUDLVL values control which security-related events are logged to this journal. E&Y recommended QAUDLVL values are as follows:
? AUTFAIL - logs all access authorization failures;
? SECURITY - logs security-related activities, such as those
related to object authority, user profiles, and system values; and
? PGMFAIL (security level 40) - creates an authorization failure
entry for each object domain, blocked instruction or program validation check failure.
K.8.4
Ensure that there are inquiry letters written by the Security Officer to the users' heads of department when significant access violations are detected by the logging facility. Also review the responses received from the users' heads of department explaining the violations.
Determine if a procedure is in place to provide a report to each user department identifiying the respective department's responsible transactions (especially update) and the authorized users for those transactions. The reports should be provided not less than every 6 months. Verify the authorizations.
K.8.5
SYSTEM SECURITY
K/PROG
Page 22 of 22
40
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
L. Physical Inventory
1. Leases/contracts are available and in force for hardware, including
peripheral equipment, and software.
2. Lists of existing equipment is complete and current (including all
PCs).
3. Determine procedure for disposing of equipment.
4. Validate equipment to the Asset list.
PHYSICAL INVENTORY
L/PROG
41
Page 1 of 1
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
M. System Performance Monitoring
1. Are there performance standards established?
If not, what is the allowable limits of: a. Response time b. Disk Capacity
2. What capacity planning is performed with new systems
development?
3. Is a report provided management depicting system performance?
If yes, how frequent?
SYSTEMS PERFORMANCE MONITORING
M/PROG
N. Preventative Maintenance (PM)
42
Page 1 of 1
Auditor(s) Assigned Audit Date
Workpaper
Audit Objectives and Procedures Ref. By
________________________________________________________________________________________________________
1. Insure Preventative Maintenance agreements are available.
a. Time period (Start and ending PM dates). b. Equipment description. c. Frequency of PM
d. Charge per call or per year.
2. Insure PM is performed on contracted equipment only.
PREVENTATIVE MAINTENANCE
43
N/PROG
Page 1 of 1
正在阅读:
IBM AS400 Security Procedures04-25
开目CAPP培训资料203-31
生物(新人教版)必修3第1、2章检测题11-07
兽药gsp制度目录11-14
《形式逻辑学》练习题纯净版04-14
我家的捣蛋大王作文500字06-23
千玉洁抗菌洗液项目可行性研究报告评审方案设计(2013年发改委标04-22
高中英语语法详解(含高考题)参考答案07-27
熊焰《低碳之路》:迈向低碳经济新高度08-19
北师大版小学一年级数学上册看图列式练习108-12
- 多层物业服务方案
- (审判实务)习惯法与少数民族地区民间纠纷解决问题(孙 潋)
- 人教版新课标六年级下册语文全册教案
- 词语打卡
- photoshop实习报告
- 钢结构设计原理综合测试2
- 2014年期末练习题
- 高中数学中的逆向思维解题方法探讨
- 名师原创 全国通用2014-2015学年高二寒假作业 政治(一)Word版
- 北航《建筑结构检测鉴定与加固》在线作业三
- XX县卫生监督所工程建设项目可行性研究报告
- 小学四年级观察作文经典评语
- 浅谈110KV变电站电气一次设计-程泉焱(1)
- 安全员考试题库
- 国家电网公司变电运维管理规定(试行)
- 义务教育课程标准稿征求意见提纲
- 教学秘书面试技巧
- 钢结构工程施工组织设计
- 水利工程概论论文
- 09届九年级数学第四次模拟试卷
- Procedures
- Security
- AS400
- IBM
- 最新2018年第一书记精准扶贫工作总结范文
- 大班科学:会预报天气的动物
- 报警、联锁摘除(恢复)工作票
- 行政事业单位财务科岗位工作职责
- 甘肃省博物馆张绍轩《丝路讲解词》简明版
- 华电六安电厂SCS逻辑说明(终版)
- 毛石条形基础施工方案
- 中国引进外资情况介绍
- 2015社交礼仪网上作业习题及答案
- 广州市医疗卫生设施布局规划 - 图文
- 2015实习每周小结
- 在节能减排、绿色施工、工艺创新方面针对本工程有具体措施或企业
- 纺纱学复习题及答案
- 煤质对鲁奇气化炉的影响
- VB实验报告书六(过程)
- 2011年新九州理论强化班三国法-扬帆练习解析
- 新世纪大学英语综合教程第二册Unit 5答案
- 静压预制桩毕业论文
- 企业给上级单位的检讨书
- 社会交换理论研究报告