the cross arm and the installation of insulator
Cross arm installation should be a right, the skew is not more than 20 mm, up and down or so skew is not more than 20 mm. Insulator installation should be solid, reliable connection, prevent water. Before installation. The insulator should be individually to determine insulation resistance.
(2) the whole stud
In pole should stop to stand up when a lift from the ground 0.5 meters, after the check by normal continue to stand up. Stand up to 60 degrees to 70 degrees should be tied to stand up when the reverse thread. Stand up to 80 degrees to 85 degrees, should stop to stand up when a fix will pull on both sides. After rod made, should immediately use theodolite is found from the front and sides simultaneously, install the chuck and backfill soil.
2. The tower group made
Tower group set method is divided into two categories: whole group decomposition of legislation and legislation. Whole set of legislation including purler herringbone derrick, a leg type herringbone derrick, etc. Decomposition group legislation including internal and external guy derrick decomposition tower, inversion group tower, etc.
(1) the tower ground preparation work before the assembly
According to the site topography and vertical tower method to determine ground assembly method. The ground before the assembly, field should be level off, lest component stress deformation.
(2) tower construction method
The current construction of transmission lines, the main use is decomposed group of tower construction method, there are foreign guy derrick decomposition group tower, stay within the derrick decomposition method. Guy derrick decomposition within the group characteristics of the tower is not affected by the influence of the terrain around the tower, reduces the anchor piles were set up for the required tools and workload. Can undertake double hanging at the same time, improve the efficiency of the construction.
(3) the bolt fastening
The Eiffel Tower adopts bolt connection, the degree of fastening bolt effect to the assembly
quality of the tower. After fastening degree is not enough, the tower stress components can produce sliding earlier, adverse to the structure.
(4) pay-off construction requirements
1. The coil set up
(1) pay-off, online plate hole through the shaft, and then put the shaft on both ends of the poles on the line frame bracket.
(2) adjust the pay-off stand, make its both ends as tall, and makes the coil from the ground.
(3) put the wire (steel wire), can be put on the wire set into the steel.
2. Alignment requirements
(1) put the aluminium wire or steel core aluminium wire, should be in advance of each pole on the cross arm hung three openings pulley, to lead to the root each pole, with a rope lift wires, embedded pulley. Continue to drag the wire, make its move along the pulley.
(2) the wire should be the one. Coil should have experience in personnel guards, responsible for check the quality of wire.
(3) when the pay-off should be reliable contact signal, along the way will be nursed conductor, so that they don't hurt, not dozen ring.
(5) wire connection requirements
1. Within each file from each wire shall have only one connector, but across important buildings, roads, rivers, railways, electric and telecommunication lines, such as wire and ground wire shall have a connector.
2. Different materials, different section or twist direction of wire connection, connection only dance line on the stem.
3. The mechanical strength of the joint is not less than 90% of the conductor is its own strength. Resistance is not more than 1.2 times with the length of wire resistance.
8 P093
4. The place such as tension bar, branch stem jumper wire connection, can be used T line and groove for clamp connection.
5. Pressure welding method of overhead lines, can be divided into the clamp pressure, hydraulic connection and detonation pressure connections.
(6) the completion acceptance inspection
1. The tower is upright, cross arm is perpendicular to line center.
2. The tower full high error values and tower foundation error value is in line with the original design requirements.
3. The guy is fastening, stress is the case.
4. Whether to conform to the requirements of the filled soil anchor pit, tower pit.
5. Check the sag, insulator string tilt, jump line electric distance whether meet the design requirements of the ministries.
6. The measured circuit conductor resistance in sunny day, shall not exceed the specified value.
7. The insulation resistance of measuring circuit conform to the standard requirements.
8. Under the rated voltage impact closing for no-load lines 3 times, have no problem to send.
Second, the cable and ground wire laying
(a) the requirements of cable laying
1. The buried cable installation requirements
(1) in cold area, cable should be buried in the permafrost.
(2) through a cable vibration and stress areas should wear protective tube.
(3) cable, parallel to the building outside the cable in the structure of the aproll slope should be.
(4) direct buried cable length should be between 1.5% and 2% longer than in cable trench, and make corrugated installation.
(5) cable, connector, terminal in turn and in and out of the building shall furnish obvious bearing marker such as location. Straight line should be appropriately adding peg.
(6) buried cable before backfill soil, shall be concealed engineering acceptance. Backfill soil should be layered compaction.
(7) the cover of the buried cable laying sand brick protection practice varies according to the different climate and environment.
2. The cable trench cable laying requirements
(1) power cable, in cable trench its horizontal interval is 35 mm, but should not be less than the cable diameter.
(2) the cable trench should be waterproof measures, should be not less than 0.5% at the bottom of the sewers, water drainage pipe or can be directly discharged into the sump pump discharge.
(3) power cables and control cables should be arranged separately.
(4) in cable trench shall assemble when entering the building fire wall.
(5) in cable trench appropriate USES reinforced concrete cover plate, the quality of each cover plate should not be more than 50 kilos.
3. The exhaust pipe of cable laying requirements
(1) local uniform load on the surface of over every square metre 100000 cattle, or by rail, reinforcement measures must be taken to protect the exhaust pipe from mechanical damage.
(2) the inner diameter of the pipe hole should not be less than 1.5 times of cable diameter, but the power cable tube hole diameter should not less than 90 mm, and control the pore diameter of the cable should be not less than 75 mm.
(3) the exhaust pipe shall have the tendency to manhole drainage slope is not less than 0.5% of the well side.
(4) row of pipe top should not be less than 0.7 meters off the ground.
(5) should strengthen cushion flat at the bottom of the trench, and should be laid not less than 80 mm thick concrete cushion layer.
(6), the branch should be set on the corner of line cable manhole Wells.
9 P094
(1) inside the shaft can not have has nothing to do with its pipelines through.
(2) shaft in high pressure, low pressure, emergency power supply of electrical wiring between each other should keep a distance of 0.3 M or above or not in the same shaft wiring.
(3) set a grounding bus bar shaft should be bright, respectively with embedded iron pieces, metal stents, good grounding cable metal sheath, etc.
正在阅读:
the cross arm and the installation of insulator05-07
关家崖煤矿矿井水文地质类型划分报告05-16
建筑识图03-28
喜怒哀乐作文500字07-16
会计从业资格考试《会计电算化》全真模拟卷及答案解析(一)04-07
二00七年象山县第三届中小学生棋类比赛06-01
2013年安徽教师考试练习题及答案六十九07-10
雅尔塔会议 - 图文06-28
90方每天生活污水设计方案05-12
- 教学能力大赛决赛获奖-教学实施报告-(完整图文版)
- 互联网+数据中心行业分析报告
- 2017上海杨浦区高三一模数学试题及答案
- 招商部差旅接待管理制度(4-25)
- 学生游玩安全注意事项
- 学生信息管理系统(文档模板供参考)
- 叉车门架有限元分析及系统设计
- 2014帮助残疾人志愿者服务情况记录
- 叶绿体中色素的提取和分离实验
- 中国食物成分表2020年最新权威完整改进版
- 推动国土资源领域生态文明建设
- 给水管道冲洗和消毒记录
- 计算机软件专业自我评价
- 高中数学必修1-5知识点归纳
- 2018-2022年中国第五代移动通信技术(5G)产业深度分析及发展前景研究报告发展趋势(目录)
- 生产车间巡查制度
- 2018版中国光热发电行业深度研究报告目录
- (通用)2019年中考数学总复习 第一章 第四节 数的开方与二次根式课件
- 2017_2018学年高中语文第二单元第4课说数课件粤教版
- 上市新药Lumateperone(卢美哌隆)合成检索总结报告
- installation
- insulator
- cross
- arm
- 幼儿园家长助教心得
- 2020-2021北京市小学数学小升初一模试卷(含答案)
- 中心机房建设项目规划方案
- 汽车消声器及排气管的设计非常实用
- 记叙文阅读与写作双效提升(全文)
- 人民美术出版社一年级上册第4课《各种各样的形》教案
- 现代企业怎样有效推行绩效管理( 45页)
- 【物理】物理试卷分类汇编物理动量定理(及答案)
- 青岛版四年级(上册)科学教学计划
- 青岛版五上数学青岛版五年级数学上册总复习知识点归纳
- 浙江省台州市社会消费品零售总额数据专题报告2019版
- 艾默生es2402变频器调试指导书
- 关于XX核心价值观主题演讲稿范文
- 年产3000吨镍钴新能源材料改扩建项目建议
- 让孩子快乐地学习珠心算.doc
- 人教版小学数学六年级下册全册说课稿
- xx年6月四级真题范文xx年6月英语四级真题答案要全套的
- LINUX下GTK 实现简单计算器
- 人教版四年级语文上册全部生字看拼音写词语练习题
- 部编新人教版小学二年级数学下册第七单元《解决问题》一遍过