Installation
Operation Maintenance
KOOLMAN
Air-Cooled Water ChillerWith Heat Pump Option
PKGP-SVX02A-EN1000-9973-01
特灵样本trane
Contentsinstallation procedures
should be performed in the sequence
that they appear in this manual. This
manual is customer's property. Do not
destroy or remove the manual from the
unit. The manual should remain weather
protected with the unit until all installation
procedures are completed.
Open and lock the disconnect
switch before attempting any installation
or maintenance. Failure to do so will cause
severe injury even to death for electrical
shock or contact with moving parts.
It is not the intention of this manual
Contents
Unitary Unit
Model Number Description
Dimensional Data
Installation Instruction
Electrical data
Wiring Diagram
Split unit
Model Number Description
Dimensional Data
Installation Instruction
Electrical data
Wiring Diagram
Pre-start Procedures
Operation
Lcd Microcomputer Control
Function Inlustration
Trouble Analyses
to cover all possible variations in systems that may occur or to provide comprehensive information concerning every possible contingency that may be encountered during an installation. If additional information is required or if specific problems arise that are not fully discussed in this manual, contact your local Sales office.appear at appropriate places in this manual. Your personal safety and the proper operation of this machine require that you follow them carefully. The Company assumes no liability for installation or servicing performed by unqualified personnel.12265154575961
特灵样本trane
Digits 1, 2, 3 CGA=Air-cooled Chilled Water
Digits 4 K=Cooling only
R=Heat Pump
Digits 5, 6, 7 Capacity Code
030 050 060 075 100 120 150 175 200
Digit 8 Power Supply
5 = 380V/50Hz/3Ph(valid for 030,050,060,075,100,120,150,175,200)
6 = 220V/50Hz/1Ph(only valid for 030)
Digit 9 Manufactory Code from A to Z (not supplied for clients)
A = 030 060 (Mini Type)
D= 075 (Single Compressor) ,150(Dual Compressor),175/200(Dual Compressor)
F= 050(Mini Type),100(Dual Compressor),120(Dual Compressor),150(Single compressor) Digit 10 Thermostat Option
A= Adjustable Entering Water Temperature Control I
B= Adjustable Entering Water Temperature Control II
C= Network Adjustable Entering Water Temperature Control II(Microprocessor Control)Digit 11 Chilled Water Pump Option
R=With( as standard)
N=None
Digit 12 Auxiliary Electric Heater in Water Circuit
N= None
A = 4kw(220V/50Hz/1Ph)(as standard for 0306)(BAYHTRL040A)
B = 4kw(380V/50Hz/3Ph)(as standard for 0305)(BAYHTRL040B)
C = 6kw(380V/50Hz/3Ph)(as standard for 0505,0605)(BAYHTRL060A)
D = 9kw(380V/50Hz/3Ph)(as standard for 0755)(BAYHTRL090A)
E = 12kw(380V/50Hz/3Ph)(as standard for 1005)(BAYHTRL120A)
F = 15kw(380V/50Hz/3Ph)(as standard for 1505)(BAYHTRL150A)
Note: This digit appears N out of factory. If there is option, the optional part is packaged separately and independently and named as the corresponding unit type plus the model shown in the bracket.
Digit 13 Temperature Kit
R= Standard Ambient Temperature Kit (as standard)
Digit 14 Other Accessories
N = None (as standard)
B= Pressurized Expansion Water Tank (WTANK-5)
C= Pressurized Expansion Water Tank (WTANK-12)
Note: This digit appears N out of factory. If there is option, the optional part is packaged separately and independently and named as the corresponding unit type plus the model shown in the bracket.
Digit 15 Minor Development Sequence (not supplied for clients)
A=First
B=Second
C=Third
D=R407C Refrigerant (not for 1205,1755)Model Number Description(Unitary Unit)CGAR0505FARNRNA123456789101112131415
特灵样本trane
Dimensional Data
A. Mini Type
Model: 0305A / 0306A / 0505F / 0605A
特灵样本trane
Dimension Data
B. Standard TypeDim
Model
0755D /1005F/1205F
1505D / 1505FW12901990H19001900D500500
Water Out
1 1/4
'' FP
TWater In44.275
40Base
187
特灵样本trane
C. Standard TypeModel
1755D / 2005DDim
W1990H1900Dimension Data1/2"
D500
特灵样本trane
Installation Instruction
Rigging
Move the unit using a forklift or crane of
suitable capacity. See Table 1 for unit
shipping weights. Locate the unit near
a large-capacity drain to allow system
drainage during unit shutdown and
repair. Rig the unit using canvas belt.
Fasten the belt over the units base as
show in Figure 1.
Table 1
Figure 1:
Recommended hoisting arrangement(CGAK-075 As shown)
Hook
Protectivecard board
Protectivecard boardProtectivecard board
Protectivecard board
Tape
Tape
Hoisting belt
Hoisting belt
Wooden skidInstallation Checklist1). Reception Verify that unit nameplate data corresponds with ordering information. Inspect unit for shipping damages and material shortages; report any damages or shortages found to the carrier. 2). Unit Location and Mounting Inspect unit installation location for adequate ventilation. Provide drainage facilities for water accumulated from the base. Remove and discard any shipping materials (e.g. cartons, crate, etc.) Inspect to determine that service access clearances are adequate. Install the optional neoprene or spring isolators at each mounting location. Secure unit to mounting surface. Level the unit.Mounting methods that will minimize sound and vibration problems are: Mount the unit directly on an isolated concrete pad or on isolated concrete footings at each unit mounting point. Install the optional neoprene or spring isolators at each mounting location.Refer to Figure 2 for unit and base dimensions and Figure 3 for recommended service clearance.Water pipingEvaporator Piping
Thoroughly flush all water system
piping before making the final piping
connections to the unit.
Connect the evaporator piping.
Vent the air from chilled water system at the highest point. Install pressure gauges, thermometers and valves on water inlet and outlet piping. Install water strainer in evaporator supply line. Install balancing valve and flow switch on water outlet piping.Caution: If using an acidic commercial flushing solution, construct a temporary bypass around the unit to prevent damage to the evaporator. To avoid possible equipment damage, do not use untreated or improperly treated water.Figure 4 illustrates typical unit piping components. Components and layout will vary slightly depending upon the locations of the connections and water source.Caution: To prevent unit damage, do not reverse system piping connections to the unit; water entering the unit must enter at the designated "Water In" and leaving water must exit the unit through the designated "Water Out" connection. Provide vent valve at highest point in the piping to bleed air from the chilled water system. To prevent damage to the waterside components of unit, do not allow evaporator pressure to exceed 0.5MPa (i.e. maximum working pressure). Before the final connection, flush carefully of all the external piping system . We have no any warranty for the case that impurities are combined in the piping.
特灵样本trane
Installation Instruction
Figure 2:Dimension for Mounting
Note: All Dimensions in Millimeter
A. Mini Type: 0305A/0306A/0505F/ 0605A
B. Standard Type: 0755D/1005F/1205F/1505D/1505F/1755D
Model
0755D
1005F/1205FA16301630B850850
1550C00775D365365640E00150F3653656401505D/F/1755D/2005D2330
40
30
特灵样本trane
Installation Instruction
Figure 3:Service and Maintenance Clearance
Air Direction
00
特灵样本trane
Installation Instruction
Figure4: Typical Piping Arrangement (CGAK-075 As Shown)
特灵样本trane
特灵样本trane
Installation Instruction
Dim
ModelABCDEFGH
WTANK-5470263230132254435415455
WTANK-12620400324162356569440475
Pressurized Expansion Water TankThe system is used to adjust the pressure and quantity. Install a handle stop valve at each side of the system, which is convenient to maintenance. Installation Principle Figure shows the installation method in detail.Electrical Heater In Water CircuitInstallation method shown in Figure 6Principle description of the pressurized expansion water tank:1. In order to avoid the pipe cracking due to the system overpressure resulting from the change of ambient temperature and also to avoid the steam hammer in the pipes, a pressure-type water tank shall be added in the pipeline system.2. In order to avoid the excessively high or low pressure in the pipe, an automatic makeup water valve and an automatic drain valve are added in the pressurized water tank. When pressure is under 0.6bar, the makeup water valve works automatically to replenish water, while over 5bar, the drain valve works.3. The makeup water and drain pressure can be varied with the jobsite situation.
特灵样本trane
特灵样本trane
Electrical data
Electrical wiring
Connect unit power supply wiring to
appropriate terminals block on distribution
box.
Connect control panel (installed indoor)
wiring to main control board.
For no-pump option only, connect chilled
water pump power supply wiring to the
proper terminals of the chilled water
pump.
Properly ground the unit, the chilled
water pump motor, and other devices
which require grounding.
If with electric heater option, connect
the power supply and control wiring to
its terminal Tb2, which is shown on
page 13.
If the interlocked controlling of the
two-way valve of fan coil unit is available,
disconnect the jumper JP6 on the control
panel on spot, and connect the interlocked
points to control terminal 12 and U.
Connect flow switch to the corresponding
terminal U( or L) and 15.Caution: To prevent injury or death, disconnect electrical power supply before completing wiring connections to the e only copper conductors for terminal connections to avoid corrosion or over heating.Table 2 provides minimum circuit ampacities, recommended fuse sizes, and motor electrical data.For actual wiring diagram, refer to the one fixed to the inside of control panel cover. The variation of input power voltage should be limited at ±10%.Caution: For the 380V unit adopts the scroll compressor, the phase reversing and loss protection controller is installed which should be checked with electricity connection before start-up.If the green light of phase sequence in the control box is on, it means the phase sequence is right. Red light being on means the optional phases of power wiring should be exchanged, and the yellow means lacking phase which need check with electricity disconnection.In any case that the phases are reversed or lacked, the unit will shut down its operation and start-up automatically.Unit Power SupplyRefer to the unit wiring diagram pasted on the control box cover. The installer must provide a power supply of proper voltage and a fused disconnect switch to the unit.Refer to wiring diagram from page 15 to 24 for reference of a typical unit
installation.
Table2: Electrical Data
A: Mini Type
Model
0305A
0306A
0505F
0605AElectrical powerWater PumpComp#1RLAComp#2RLAFan#1FLAFan#2FLAUnit MCARec. FuseMax FuseMin Cross Section Area Of(V/Hz/Ph)380-415/50/3220/50/1380-415/50/3380-415/50/3FLA(A)1.12.41.11.1(A)7.216.38.511.2(A)----(A)0.520.520.520.52(A)0.520.520.520.52(A)11.223.812.816.2Size (A)12.927.914.918.9Size (A)18.340.121.327.3Power Copper Cable (mm)2.56442B: Standard TypeElectrical powerWater PumpComp#1RLAComp#2RLAFan#1FLAFan#2FLAUnit MCARec. FuseMax FuseMin Cross Section Area Of(V/Hz/Ph)
220/50/1
380-415/50/3
380-415/50/3
380-415/50/3
380-415/50/3
380-415/50/3
380-415/50/3
380-415/50/3FLA(A)4.41.41.41.42.61.83.13.2(A)16.811.67.41111.625.813.317(A)17.1-7.41111.6-13.317(A)1.811.61.61.61.61.632.59(A)----1.61.632.59(A)48.617.521.530.534.837.342.450.9Size (A)57.120.425.23640.643.74959.4Size (A)82.529.136.352.558636984.9Power Copper Cable (mm)106610101010162Model0606B0755D1005F1205F1505D1505F1755D2005D
特灵样本trane
Wiring Diagram
特灵样本trane
Wiring Diagram
特灵样本trane
CGAR0605AB / CGAR0505FB / CGAR0305ABWiring Diagram
特灵样本trane
CGAK0305AB / CGAK0605AB / CGAK0505FB
Wiring Diagram
特灵样本trane
CGAR0306AB
Wiring Diagram
特灵样本trane
CGAK0306AB
Wiring Diagram
特灵样本trane
CGAR0755DB
Wiring Diagram
- 1Volatility Information Trading in the Option Market
- 2测光系统转换u,g,r,i,z - U,B,V,R,I
- 3公司简介特灵
- 4华为dhcp option 43
- 5r22r12r134ar502r410ar600ar406ar404a等常用制冷剂温度压力对照
- 63D heat transfer analysis in a loop heat pipe evaporator wit
- 7OptiX OSN 3500 V100R008 产品概述 V1.6(20100331) - 图文
- 8FusionAccess V100R005 HDC常见问题处理指南 v1.0
- 9Air Jordan鞋子详细介绍
- 10BSC6900V900R011 GO 数据配置(基于CME)-V1.0
- 教学能力大赛决赛获奖-教学实施报告-(完整图文版)
- 互联网+数据中心行业分析报告
- 2017上海杨浦区高三一模数学试题及答案
- 招商部差旅接待管理制度(4-25)
- 学生游玩安全注意事项
- 学生信息管理系统(文档模板供参考)
- 叉车门架有限元分析及系统设计
- 2014帮助残疾人志愿者服务情况记录
- 叶绿体中色素的提取和分离实验
- 中国食物成分表2020年最新权威完整改进版
- 推动国土资源领域生态文明建设
- 给水管道冲洗和消毒记录
- 计算机软件专业自我评价
- 高中数学必修1-5知识点归纳
- 2018-2022年中国第五代移动通信技术(5G)产业深度分析及发展前景研究报告发展趋势(目录)
- 生产车间巡查制度
- 2018版中国光热发电行业深度研究报告目录
- (通用)2019年中考数学总复习 第一章 第四节 数的开方与二次根式课件
- 2017_2018学年高中语文第二单元第4课说数课件粤教版
- 上市新药Lumateperone(卢美哌隆)合成检索总结报告
- 特灵
- 样本
- KOOLMAN
- Chiller
- 380220V
- cooled
- Option
- trane
- Water
- with
- Heat
- Pump
- Air
- R22
- 2014—2015学年度第一学期六年级语文期末测试卷
- 全文获取的方法与途径
- 如何用正确的心态面对高考
- 货币银行学2010年至2015年期末试题带答案大汇总
- 全国英语等级考试(第一级)大纲词汇
- 简介:X线机.CR.DR.CT的原理
- 温度和Cl_质量分数对304不锈钢耐点蚀性能的影响
- 吉非替尼治疗晚期非小细胞肺癌临床疗效分析
- 绿化项目部岗位职责
- 义务(志愿)消防队学习训练登记表
- 湖南最新各地区企业名录
- 新理念英语上机测试(华工版)-B3U3-A
- 一口气演讲式英语
- 《分数、百分数应用题整理与复习》说课稿
- 多媒体技术应用试题
- 音像图书租赁管理系统的设计与实现
- QC技能手册之来料检验
- 农村饮水安全工程实施方案
- 2012年无锡市天乐通讯设备安装有限公司班组长绩效考核办法
- 《现代企业文化》杂志是由中华全国总工会主管、中国工人出版社主办的国家级综合类期刊