HVAC System Operation Procedure
SOP-000309 Version : 04
Effective from : 24.10.2008
空调系统操作程序
Approvals 批准: Name 姓名:
Date 日期:
Signature 签名
:
Approvers 批准人:
Final Approver 最终批准人:
Applicability: document applies for Beijing Novartis Pharma Ltd. 适用于:文件适用于北京诺华制药有限公司
All PlantProductionEngineeringother :
QCProcessingSCM
QAPackagingBPA
HR/Admin.Semi Solid
瑞士诺华制药为世界制药行业领导者,2013年排名全球第一。本文为北京诺华制药洁净空调操作规程,通过GMP、FDA、TGA审计,供同行借鉴参考学习。
HVAC System Operation Procedure
空调系统操作程序
Replaces No.: SOP-000309 version 02 Reason for Change: 1.
Integration of all HVAC Units of EPCP in operation.
1
Regulatory Basis and Reference Documents
Novartis Quality Manual: Module N6.2: Cleanliness Zoning
IGs N6.2.2: Cleanliness Zoning Policy for The Manufacture of Non-Sterile Drug
Products and the Respective Drug Substance
BNP SOPs:
SOP-000066: Filter Replacement for HVAC Installation
SOP-000192: Room Monitoring Cleanliness Zoning parameters P Pa, T℃, RH % SOP-000213: Operation and Cleaning for Sampling Cabin (R907) in Warehouse SOP-000217: Preventive Maintenance for HVAC Units
SOP-000328: General Operating Procedures in case of HVAC Shut Down SOP-000390: Cleanliness Zoning
SOP-000475 Room Condition Monitoring in case of RMS fails (none availability) NB. Upon approval of the RMS SOP these SOPs will be referenced to this SOP.
2 Purpose
To specify the general sequence of HVAC system start up and shut down. To specify the general instructions on how to operate the HVAC systems.
3
No. 1.1 2.1 2.2 2.3 3.0 4.0 5.0 6.0 8.0
Scope
This SOP is valid for all the following production related HVAC systems in Beijing Novartis Pharma. Ltd, ChangPing.
Function Production area Capsule filling Emugel filling Emugel processing Packaging N/A Lockers QC Alu-Alu
Servicing areas Dispensing A-308, Day storage Room A-310, Blending Room A-313, Intermediate Storage A-504, Granulation Room A-506, Compressing Rooms A-508.1, Compressing ante-room A-510, Capsule filling room A-Zone 2
508.2, Coating Room A-514, Coating drying room A-516, Corridors 300 and 500 etc.
Encapsulating A-511, Printing A-509 and locker 507 Zone 2 Cream/Ointments Filling A-505 and Personnel Lockers 505.1, 505.2,
Zone 2
505.3, 501.1
Cream/Ointments Processing A-503 and locker 501, Storage room 503.1 Secondary packaging A-405,Air locker 405.1 etc. N/A
Offices and Production Lockers QC Laboratories
Alu-Alu Blister Packing A-302, Compressing Room A-304
Zone 2 Zone 2 Zone 3 Zone 2 Zone 4 Zone 2
瑞士诺华制药为世界制药行业领导者,2013年排名全球第一。本文为北京诺华制药洁净空调操作规程,通过GMP、FDA、TGA审计,供同行借鉴参考学习。
空调系统操作程序
No. 9.0 10.0 13.0 20 21 PCU1 AIC 1 PCU2 AIC 2 ------
Function packaging Sampling Material lock Washing New Warehouse
New Conditioned Storage Area Inlet to AHU Air Inlet Inlet to AHU Air Inlet Canteen
Servicing areas
Sampling Cabin A-907 with Personnel Lockers 905, 906 Material Entry A-910 Material Air-Lock A-306
Washing Area A-314.1, Equipment storage room A-314, PW Plant Room A-316
Receiving/Dispatch Area A-804, High Rack Storage Area A-806 New Conditioned Storage Area 932
Central fresh-air pre-conditioning unit Fresh-air Inlet Chamber 1
Central fresh-air pre-conditioning unit Fresh-air Inlet Chamber 2 Canteen
A-320 Airlock, A-322 Clean store, ,A-324 Dirty Equipment,A-326 Washing,A-328 Drying,A-330 Breached material store, A-332 Emergency Shower,A-334 Change room, A-918 Dispensed batch store, A-921 Dispensing room 1, A-922 Dispensing room 2,A-924 Dispensary material store,A-928 Pallet transfer.
New HVAC system is used for production area step by step A-602 Blending room,A-604Storage,
Covers Corridor A-612 Compression corridor,A-608 Compression room 1,A-610 Compression room A-616 , Compression room A-618
Covers A-628 Coating, A-628.1 PersonalAirlock, A-630 Control room, A-632 Printing, A-634 Bulk storage.
Clean Stair1 A-238, Clean Stair 2 A-240 : operated zone 2 Shoe Change A-238 : operated zone 2 Clean Change A-232 : operated zone 4* Rooms A-230, A-234 : operated zone 4* Rooms A-222, A-226 : operated none zone** Rooms A-224, A-228, A-228.1 : operated none zone Note:
*: AHU17 is designed for Zone 2(A-232, A-234, A-230), the operation
mode of the rooms are defined as listed above.
**: AHU17 is designed for Zone 3(A-222, A-226), the operation mode of
the rooms are defined as listed above. Clean Stair1 A-140 : operated zone 2 Shoe Change A-136 : operated zone 2 Clean Change A-132 : operated zone 4* Rooms A-130, A-134 : operated zone 4* Rooms A-122, A-126 : operated none zone** Rooms A-124, A-128, A-128.1 : operated none zone Note:
*: AHU17 is designed for Zone 2(A-132, A-134, A-130), the operation
mode of the rooms are defined as listed above.
**: AHU17 is designed for Zone 3(A-122, A-126), the operation mode of
the rooms are defined as listed above.
Zone 2 Zone 4 Zone 3 Zone 2 Zone 4 Zone 4 N/A N/A N/A N/A N/A
AHU11 Dispensary Zone 2
AHU12 AHU14 AHU15 AHU16
Clean corridor Granulation Suite Compression
suite Coating,
Zone 2 Zone 2 Zone 2 Zone 2
AHU17 Clean Change Zone 2
Primary
Primary packaging room A-710, A-720, A-730, A-740.
packaging area Secondary
AHU19 Packaging Area, A-407, Packaging Waste Air Lock, A-409.
packaging area
AHU20 Warehouse
AHU21
Warehouse Conditioned Storage, A-932.
New wash bay, Rooms A-624 Equipment drying room, A-620 Dirty
AHU22
Process area equipment room.
AHU18
Zone 2 Zone 3 Zone 4 Zone 4 Zone 2
瑞士诺华制药为世界制药行业领导者,2013年排名全球第一。本文为北京诺华制药洁净空调操作规程,通过GMP、FDA、TGA审计,供同行借鉴参考学习。
空调系统操作程序
No. AHU24
Function Process area Sampling
Servicing areas Granulation, Covers A-638 Material Airlock, A-640 Personal Airlock, A-636 Granulation room, A-642 Emergency Shower. Zone 2
Rooms A 820, A 821, A 822, A823, A 824
4
4.1
Procedures
Sequence of Existing Systems Start-up
All the HVAC systems are continuously running, 24hours/day, except the AHU 9.0 system for the Sampling Room (see SOP-000213 Operation and Cleaning for Sampling Cabin (R907) in Warehouse ) and future Sampling Cabin served by AHU 25. In case of maintenance activities requirements or system failure, the system can be shut down in accordance with the SOP-000328.
The room Pressure status Representation (Image 1) shows the pressure cascade of the production area. In principle, The HVAC systems should be started-up from the higher pressure area to the lower pressure area to ensure the correct air flow direction, which defines the HVAC and the related production area start-up sequence.
The PCU1 and PCU2 units are always in operation, because they supply with pre-conditioned air to the Air Handling Units in all buildings (e.g. existing and New Extension Production Building 12A, 13, etc.). The adjustments for the various air volume amounts is controlled automatically by the DDC system. No further activities are necessary. Start up sequence:
Step 1: 40Pa’s areas, including
AHU 2.3 (Emugel Processing Area) AHU 2.2 (Emugel Filling Area)
Step 2: 39Pa’s areas including
AHU12 (Clean Room Corridors A 600 & A 700)
AHU 11 (serving rooms on 39 Pa level: materials airlock A 320, dispensed batch store A 918, dispensary store A 924 plus rooms on lower pressure level) 30Pa’s areas, including
HVAC system 1.1 (Clean Room corridors A 300 & A 500 plus Production Rooms on lower pressure level)
瑞士诺华制药为世界制药行业领导者,2013年排名全球第一。本文为北京诺华制药洁净空调操作规程,通过GMP、FDA、TGA审计,供同行借鉴参考学习。
空调系统操作程序
Step 3: Low pressure production areas (26Pa), including
AHU 14 (serving Blending & Storage)
AHU 15 (serving Clean corridor A 612 and compression rooms on lower pressure level) AHU 16 (serving Coating)
AHU 17 (serving Zone 2 change lockers) AHU 18 (serving Primary packaging) AHU 22 (serving new wash bay area)
.AHU 24 (serving granulation air locks A 638 & A 640 and granulation room on lower pressure level)
Low pressure production areas (25Pa)
AHU 2.1 (serving locker A 507 and capsule filling room at lower pressure level)
Low pressure production areas (20Pa)
AHU 8.0 (serving Room A 302 and A 304)
AHU 10.0 (serving Material Air lock A 910 & A 306)
AHU 13.0 (serving room A316 and washing area at lower pressure level)
Low pressure production areas (13Pa) AHU19 (Secondary packaging area)
Low pressure production areas (10Pa) AHU 10.0 (material lock)
AHU 3.0 (secondary packaging area)
Notes:
In case of HVAC systems start-up, all the room related Spot Suction systems
(e.g. dispensing room, granulation room, compressing rooms, primary packaging rooms, etc.) must be in operation at the same time.
After any HVAC is stopped the time interval from re-starting the HVAC system
supplying room air into GMP Zones 2 for production re-start should be at least 30 minutes to ensure clean rooms recovery conditions.
正在阅读:
洁净空调启停操作规程-诺华制药05-30
新新主持词06-02
回族姑娘主持词01-03
中国通史 之 开天盛世解说词01-27
向上向善,主持词01-01
春天里的花园作文350字07-11
社会实践自我总结03-31
2015版质量环境管理体系内审检查表范例05-11
CAD讲稿参考07-01
矿井突水预兆01-07
- 教学能力大赛决赛获奖-教学实施报告-(完整图文版)
- 互联网+数据中心行业分析报告
- 2017上海杨浦区高三一模数学试题及答案
- 招商部差旅接待管理制度(4-25)
- 学生游玩安全注意事项
- 学生信息管理系统(文档模板供参考)
- 叉车门架有限元分析及系统设计
- 2014帮助残疾人志愿者服务情况记录
- 叶绿体中色素的提取和分离实验
- 中国食物成分表2020年最新权威完整改进版
- 推动国土资源领域生态文明建设
- 给水管道冲洗和消毒记录
- 计算机软件专业自我评价
- 高中数学必修1-5知识点归纳
- 2018-2022年中国第五代移动通信技术(5G)产业深度分析及发展前景研究报告发展趋势(目录)
- 生产车间巡查制度
- 2018版中国光热发电行业深度研究报告目录
- (通用)2019年中考数学总复习 第一章 第四节 数的开方与二次根式课件
- 2017_2018学年高中语文第二单元第4课说数课件粤教版
- 上市新药Lumateperone(卢美哌隆)合成检索总结报告
- 诺华
- 规程
- 洁净
- 制药
- 空调
- 操作
- 2012高考语文病句16规律及大题答题公式
- 黑龙江省哈三中2015届高三上学期第二次测试政治试题 Word版含答案(精校版)
- 北京市市政管委机关后勤服务中心
- 妇科手术器械的规范化管理
- 建设用地规划管理培训班
- 3分钟教你选择好的好的床垫
- 英语:Unit3 life in the future 学案(1)(新人教版必修5)
- 2011年利比亚撤侨
- 8.28朗读材料--Self-esteem
- 2013-2014学年度第一学期语文教学工作反思
- 地上施工组织设计案例
- 高压输电线路故障定位的研究
- 高职游戏专业课程置换工学结合人才培养模式探讨
- 三语文2005中考模拟试卷及答案
- 傲慢与偏见人物特点
- 基于物联网技术的智能电网系统分析_刘丙午
- 打玻尿酸隆鼻属于微创隆鼻吗
- 读《做单》观后感
- 耐盐渍小麦新品种“新春29号”诞生
- 变压器差动保护误动原因分析