北洛河城区段橡胶坝初步设计

北洛河城区段橡胶坝初步设计

1

北洛河城区段橡胶坝初步设计

目录

某县北洛河城区段橡胶坝初步设计 ···············1 设计资料 ························2 水 文 ·························2.1流域概况 ·······················2.2气象 ·························2.3年径流 ························2.4暴雨洪水特性 ·····················2.5泥沙 ·························2.6水面蒸发 ·······················3 工程地质 ························3.1概述 ·························3.1.1地形地貌概况 ····················3.1.2地质构造 ·····················3.1.3地层岩性 ·····················3.1.4水文地质条件 ···················3.1.5地震设防烈度 ···················

2

1 7 7 7 8 8 8 9 9 9 9 9 10 10 11 11

北洛河城区段橡胶坝初步设计

3.2工程地质条件 ···················· 12 3.2.1坝趾及库区工程地质条件 ·············· 12 3.2.2护堤工程地质条件 ················· 12 3.2.3 4橡胶坝护堤工程地质条件 ············· 13 #

3.3天然建筑材料 ····················3.3.1细骨料场 ·····················3.3.2粗骨料场 ·····················4 工程任务和规模 ····················4.1社会经济发展状况及工程现状 ·············4.1.1社会经济发展状况和近期发展规划 ··········4.1.2库区段现状及存在的问题 ··············4.1.3排污设施 ·····················4.2工程建设任务 ····················5 工程选址、工程布置及主要建筑物 ············5.1工程等别及主要建筑物等级 ··············5.1.1工程等别及主要建筑物级别、洪水标准 ········5.1.2工程地震设防烈度 ·················5.2工程位置 ······················5.3工程布置和主要建筑物型式 ··············5.3.1布置原则 ····················· 3

13 13 13 14 14 14 14 14 14 15 15 15 15 15 15 15

北洛河城区段橡胶坝初步设计

5.3.2主要建筑物型式 ·················· 16 5.4橡胶坝袋及锚固设计 ················· 21 5.4.1计算条件 ····················· 21 5.4.2坝袋计算 ····················· 22 5.4.3坝袋锚固设计 ···················5.5控制室工程 ·····················5.5.1排水控制室结构设计 ················5.5.2排水控制室结构计算 ················5.6橡胶坝充排系统及水源 ················5.6.1充排水方式选择 ··················5.6.2管路计算 ·····················5.6.3橡胶坝的操作运用 ·················6 电气设计 ·······················6.1供电线路 ······················6.2电气照明 ······················7 工程管理 ·······················7.1 管理机构定员 ····················7.2管理方法 ······················7.2.1工程调度管理 ···················7.2.2工程观测管理 ··················· 4

23 25 25 25 25 25 26 26 26 26 26 27 27 27 27 27

北洛河城区段橡胶坝初步设计

7.2.3管理范围 ····················· 27 7.3运行管理 ······················ 28 7.3.1泥沙 ······················· 28 7.3.2橡胶坝前清淤周期计算及其运行 ··········· 28 7.3.3 水情监测 ····················7.3.4冬季运行 ·····················8 施工组织设计 ·····················8.1工程任务 ······················8.2施工条件 ······················8.2.1自然条件 ·····················8.2.2建设条件 ·····················8.3施工导流 ······················8.3.1施工导流及施工围堰 ················8.3.2基坑排水 ·····················8.3.3施工方法 ·····················8.4施工进度及技术供应 ·················8.4.1施工进度 ·····················8.4.2技术供应 ·····················8.5施工组织 ······················9 环境影响评价 ····················· 5

28 29 29 29 29 29 30 30 30 30 30 31 31 31 32 32

北洛河城区段橡胶坝初步设计

9.1有利影响 ······················ 32 9.2不利影响 ······················ 33 10 工业卫生与劳动安全评价 ················ 33 10.1 劳动安全 ······················10.1.1防火设计 ····················10.1.2防洪、防淹 ···················10.2采光与照明 ·····················10.3防尘、防腐蚀 ····················10.4安全卫生管理机构及配置 ···············11 节能节水评价 ·····················11.1节水 ························11.2节电分析 ······················11.3节燃料分析 ·····················12 工程安全评价 ·····················12.1防洪安全评价 ····················12.1.1修建橡胶坝工程对县城安全评价 ··········12.1.2塌坝运行时河道安全评价 ·············12.2地下水位抬高对现状建筑物的影响及安全评价 12.3现状河堤安全评价 ··················12.4库区内建筑物的影响及安全评价 ············

6

33 33 33 33 34 34 34 34 34 35 35 35 35 35 35 36 36

······北洛河城区段橡胶坝初步设计

12.5控制电源安全评价 ·················· 37 12.6防洪预案 ······················ 37 12.7结论 ························ 37

1 设计资料

水洛河属渭河二级支流,上游分为南洛河和北洛河两条支流,两支流于某县城处汇合,汇合后称下洛河。北洛河河长31km,流域面积278km2,年均径流量2974万m3,年均流量0.943m3/s。南洛河河长30.5km,流域面积325.7km2,年均径流量0.38亿m3,年均流量1.2m3/s;水洛河总河长99.5km(某县境内89.5km),总流域面积905.7km2(某县境内836.7km2),年均径流量0.84亿m3,年均输沙量395万t。4橡胶坝坝址处无实测泥沙资料,故泥沙根据《甘肃省水文图集》法进行计算,查得橡胶坝坝址所处流域年土壤侵蚀模数为0.5万t/km2,则年悬移质输沙量139万t,推移质输沙量按悬移质输沙量的20%计,则推移质输沙量27.8万t,故得坝址处年平均输沙量为166.8万t,折合128.3万m3。现代河床漫滩经河堤治理后稳定河宽100~108m,平均高程1616.5~1639m,左岸Ⅰ级阶地宽300~350m,平均高程1619.6~1642m,Ⅱ级阶地缺失;右岸Ⅰ级阶地宽500~550m,平均高程1619.8~1642m,Ⅱ级阶地宽50~100m,平均高程1638~1650m。

7

#

北洛河城区段橡胶坝初步设计

某县位于内陆腹地,属大陆性季风气候区,全年盛行西北风,最大风速20m/s。气候干燥,昼夜温差大,夏季气温高,多冰雹、雨洪,夏秋季雨水集中。北洛河(城区段)河谷地貌以河漫滩、Ⅰ级阶地为主,Ⅱ级阶地零星发育。主要地层有第四系全新统粉土质砾、低液限粉土、新第三系(N)棕红色、浅黄色泥岩、砂质泥岩石、泥质砂岩。工程区浅层地下水资源贫乏,浅层地下水属第四系松散堆积物砂砾孔隙潜水类型;主要分布于北洛河干流河漫滩地及Ⅰ、Ⅱ级阶地底部。 2 水 文 2.1流域概况

水洛河属渭河二级支流,上游分为南洛河和北洛河两条支流,两支流于某县城处汇合后称下洛河。南洛河发源于关山西麓某县韩店乡的灶火沟,由东向西,流经韩店乡、南坪乡和水洛镇,河长30.5km,流域面积325.7km2,年均径流量0.38亿m3,年均流量1.2m3/s;北洛河发源于宁夏回族自治区隆德县苏台乡马鹿沟和黄草沟,由东北流向西南,于某县通边乡佛崖湾峡流入某县境,流经通边乡、通化乡、良邑乡、水洛乡和水洛镇等四个乡镇,河长31km,流域面积278km2,年均径流量2974万m3,年均流量0.943m3/s;下洛河由东北向西南,流经朱店镇、万泉乡至徐家城纳入清水河,经静宁县周家峡口、出清水峡,至仁大川高沟村注入葫芦河。水洛河总河长99.5km(某县境内89.5km),总流域面积905.7km2(某县境内836.7km2),年均径流量0.84亿m3,年均输沙量395万t。

8

北洛河城区段橡胶坝初步设计

本次设计橡胶坝坝址位于北洛河末端,坝址以上控制流域面积278km2,河床平均比降1%,年均流量0.943m3/s,年均径流量2974万m3。 2.2气象

某县位于内陆腹地,属大陆性季风气候区,全年盛行西北风,历年最大风速为20m/s。气候干燥,昼夜温差大,夏季气温高,多冰雹、雨洪,夏秋季雨水集中。全年平均气温7.9℃,最热月为7月,月平均气温19.9℃,历年最高气温34.8℃;最冷月为1月,平均气温-5.5℃,极端最低气温-23℃,最大冻土深63cm,多年平均无霜期142天。

多年平均降水量547.8mm,年内分布极不平衡,冬春降水稀少,10月至次年4月降水仅占全年降水的20%,全年降水量60%以上集中在7-9三个月。年蒸发量1310.2mm(口径20cm)。有关气象统计资料见表2-1。 2.3年径流

由于北洛河无实测水文资料,故利用《甘肃省水文图集》进行年径流计算。按图勾绘出流域分水线,并定出流域中心位置,用直线内插法求得北洛河流域多年平均径流深为107mm。

多年平均径流量:用公式Q=(1000×F×R)/T计算出平均流量,再由公式W=QT计算多年平均径流量。 式中:Q——多年平均流量(m3/s)

9

北洛河城区段橡胶坝初步设计

F——流域面积,为278km2 R——多年平均径流深,为107mm T——计算时段长,为31.54×10s

由以上数据计算得坝址处多年平均流量分别为0.943m3/s,并求得多年平均径流量分别为2974万m3。 2.4暴雨洪水特性

水洛河流域年径流多由降雨补给,大多以暴雨形式出现,年内分配极不均匀,多集中在7-9月。全年可分为3-5月为春汛期,由上游冰雪融水和降雨补给,6-9月为夏秋主汛期,以降雨补给为主,洪水多,历时短,洪峰流量大,且洪水的年际变化较大。10-11月为秋季枯水期,以地下水补给及河槽储蓄量为主,12月至次年3月为冬季枯水期,以地下水补给为主。该流域除上游南部地区为植被较好的土石山林区外,中下游属黄土高原丘陵沟壑区,植被差,山体破碎,小范围的突降暴雨强度大,冲刷力强,形成大量地表径流,对河道两岸冲刷严重,破坏性较大。

4橡胶坝坝址处二十年一遇洪峰流量为420m3/s,五十年一遇洪峰流量为570m3/s。 2.5泥沙

4橡胶坝坝址处无实测泥沙资料,故泥沙根据《甘肃省水文图集》法

##

6

10