SH/T 3503-J205 Block Type Equipment Foundation Allowable Deviation Item Survey Record 编号 Item No. 勘测日期 Survey Date 块体式设备基础 允许偏差项目复测记录 工程名称: Project: 单元名称: Unit: 基础描述 Foundation Description 土建图纸编号 Construction Drawing No. S/N 1 2 3 勘测项目 Survey Item 公差每个检测点的实际偏差 Tolerance Actual Deviation of Each Check Point mm mm 1 2 3 4 5 6 7 8 9 10 4 5 6 7 纵向 20 Longitudinal 轴位置 Axial Position 水平 20 Horizontal 不同级别基础的海拔 0 Elevations of Different Levels of -20 Foundation 基础的几何尺寸 ±20 Geometrical Dimension of Foundation 基础凸弧段的几何尺寸 0 Geometrical Dimension of Foundation’s -20 Convex Section 基础凹面的几何尺寸(包括内部孔,沟渠和坑) +20 Dimension of Foundation’s Concave 0 Section (Incl. internal holes, ditches and pits) 基础表面平整度(包括设每公尺 5 备安装的倾斜部分) Every Meter Foundation Surface Levelness (Including the 全长 10 part on the grade where Full Length equipment is to be installed) 每公尺 5 侧向基础垂直度 Every Meter Lateral Foundation 全长 Plumbness 10 Full Length 标高(顶部) +10 0 预埋锚杆 Elevation (Top) Embedded 中心距(顶部和底部之间) Anchor Bolt Central Distance (between ±2 the top and the bottom) 中心位置 锚杆预制孔Central Position Precast 深度 8 Hole For Depth Anchor Bolt 孔壁垂直度 Hole Wall Plumbness ±10 +20 0 10 SH/T 3503—2007 标高 +20 Elevation 0 锚板预埋可 拆卸锚杆中心距 ±5 Embedded Central Position 锚板切口9 Removable Anchor Plate 5 Anchor 平整度with Notch Plate for 带螺纹孔锚板Anchor Bolt Levelness Anchor plate with 2 Threaded Hole 勘测结果确认(有关检测点位置,请查阅附图) Confirmation on Result of Survey (For locations of check points, see the attached sketch): 业主/监理 受理单位 总承包 土建承包 Owner/Supervision Take-over Party General Contractor Construction Contractor Contractor 专业工程师: 专业工程师: 专业工程师: 专业工程师: Discipline engineer: Discipline engineer: Discipline engineer: Discipline engineer: 质量检验员: 日期: 日期: 日期: Quality inspector: Date: Date: Date: 日期:

Date: B.4 SH/T3503-J204 Measured data in “Equipment foundation survey record” including design coordinate and elevation is locating data of foundation. Topic with “Confirmation on Result of Survey” must be signed by Construction Contractor or Supervision Contractor. B.5~B.8 Specific locating data record of each section of equipment foundation could choose special forms according to different type of equipment foundation. Including SH/T3503-J205 “Block Type Equipment Foundation Allowable Deviation Item Survey Record”, SH/T3503-J206 “Integrated Framework Type Equipment Foundation Allowable Deviation Item Survey Record”, SH/T3503-J207 “Storage Tank Foundation Allowable Deviation Item Survey Record (1),(2)” and SH/T3503-J208 “Spherical Tank Foundation Allowable Deviation Item Survey Record”

etc. These kinds of forms would be delivered to Installation Contractor (refers to Take-over Party in the form) after completed the construction of equipment foundation and satisfied the quality requirement. Topic with “Confirmation on Result of Survey” of the form must be signed and confirmed by Construction Contractor or Supervision Contractor.

B.4 SH/T3503-J204 “设备基础复测记录”中的测量数据为基础整体的定位数据,包括设计坐标和标高。“复测结果确认”栏由建设/监理单位填写。 B.5~B.8 设备基础中各部位具体定位数据的记录可根据设备基础形式的不同选用专门的表格填写,包括SH/T3503-J205“块体式设备基础允许偏差项目复测记录”、SH/T3503-J206“整体框架式设备基础允许偏差项目复测记录”、SH/T3503-J207“储罐基础允许偏差项目复测记录(一)、(二)”和SH/T3503-J208“球罐基础允许偏差项目复测记录”等。此类表格作为土建施工单位即表中“施工单位”在设备基础施工完毕并符合质量要求后,交付安装单位即表中“接收单位”的用表,表格中的“复测结果确认”栏由建设/监理单位填写并签认。