数学建模2013B - Outstanding - paper - 图文
更新时间:2024-05-21 13:00:01 阅读量: 综合文库 文档下载
Team Number
For office use only T1 ________________ T2 ________________ T3 ________________ T4 ________________
21185
Problem Chosen
For office use only
F1 ________________ F2 ________________ F3 ________________ F4 ________________
B
2013 Mathematical Contest in Modeling (MCM) Summary Sheet
Summary
There are mainly three water problems in China: too little water in northern and northwestern part; too much floods in southern part; and too dirty water produced by industry and agricultural pollutants.
In order to address problems above and provide a thirteen-year water strategy (2013-2025) for the leadership of China, we conclude five sub-problems and its solution in our paper: 1)Prediction of the supply and demand of water in a period of thirteen years based on historical data;2) Model building of national water storage and movement strategy to solve China?s uneven distribution of water in time and space; 3)Model designing of regional water de-salinization strategy to increase the total amount of available water;4)Model building of water conservation strategy, including regional water pollution treatment and national water-saving; 5)Long run cost-benefit analysis of four water strategies above and the discussion of the optimal combination of water strategies.
In first model, we choose the most appropriate Fitting Function. Using Grey Predicted Model, we can get the correlation degree between water consumption and population, industrial GDP and
agriculture output. Then we successfully finger out the water demand in 2025 is 6770 hundred million m^3 by using GM prediction. In our second model, we use CV (coefficient of Variation) and water supply pressure ?? as the decision-making index and work out a water storage project list by using Goal Programming. Based on cost and benefits analysis, we build Minimum Spanning Tree to
work out the optimal water transfer plan. That is, we should transfer water from Yangtze watershed to Yellow watershed and Hai watershed. Besides, we devise a local water transfer strategy. In the third model, we build a set of parameters to describe the degree of water purification demand of each city and successfully get the water de-salinization plant building scheme. In the fifth model, we do long run cost-benefit analysis of four water strategies above. We first analyze weights of economic, physical, environmental implications by using AHP (analytic hierarchy process). Then we use Neural Network Algorithm to classify the quality of each strategy and finally get a reasonable strategy evaluation model.
In the whole modeling process, we give full consideration to validity, feasibility and cost-efficiency of our model.
Five Models for China's Water Scarcitys
Contents
1 Introduction ................................................................................................................ 2 Nomenclatures ............................................................................................................ 3 Model one: Water demand and supply Forecast (2013-2025)................................
1 2 3
3.1 Introduction ....................................................................................................... 3 3.2 Assumptions ...................................................................................................... 3 3.3 Function Fit Model ............................................................................................ 3
3.3.1Analysis of China?s water use .................................................................... 4 3.3.2Model Testing............................................................................................. 6 3.3.3Prediction Results and Conclusion ............................................................ 6 3.4 Grey Forecasting Model .................................................................................... 7
3.4.1Reasons for Improvement .......................................................................... 7 3.4.2Correlation Degree Analysis ...................................................................... 8 3.4.3Thirteen-year water forecast based on Verhulst Model.............................. 9 3.4.4Model Solution......................................................................................... 10 3.4.5Model Testing........................................................................................... 10
4 Model Two: Water Storage and Movement ...........................................................
12
4.1 Terminology..................................................................................................... 12 4.2 Water Storage Model: Time Balancing Strategy of Water Resources ............. 13
4.2.1Introduction .............................................................................................. 13 4.2.2Analysis.................................................................................................... 13 4.2.3Model Solution......................................................................................... 14 4.2.4Conclusion ............................................................................................... 16 4.3 Water Transfer Model: Spatial Balancing of Water Resources Strategy ......... 16
4.3.1Introduction .............................................................................................. 16 4.3.2Backgrounds and Water Movement Principles ........................................ 17 4.3.3Model Analysis ........................................................................................ 18 4.3.4Objective Function of water transfer strategy.......................................... 21 4.3.5Model Testing........................................................................................... 21 4.3.6National water transfer strategy ............................................................... 21 4.3.7Conclusion ............................................................................................... 22
5 Model Three: Water De-salinization Strategy .......................................................
23
5.1 Introduction ..................................................................................................... 23 5.2 Terminology..................................................................................................... 23 5.3 Assumptions .................................................................................................... 23 5.4 Model Building................................................................................................ 24 5.5 Model Solving ................................................................................................. 24 5.6 Analysis and Conclusion ................................................................................. 25 6 Model Four: Water Conservation Strategy ...........................................................
25
6.1 Introduction ..................................................................................................... 25 6.2 Water Pollution Control Model ....................................................................... 25
6.2.1 Introduction ............................................................................................. 25 6.2.2 Assumptions ............................................................................................ 25 6.2.3 Terminology ............................................................................................ 26 6.2.5 Model solution: ....................................................................................... 27 6.2.6 Model analysis: ....................................................................................... 28 6.3 Water-saving Model......................................................................................... 29
6.3.1 ?? The water consumption per unit GDP ................................................ 29 6.3.2 Analysis and Conclusion......................................................................... 30
7 Model Five: Impacts Evaluation Model.................................................................
31
7.1 Introduction ..................................................................................................... 31 7.2 The Comparison of η (the actual benefit of a project)..................................... 31 7.3 Evaluation of Economic, Physical, and Environmental impacts using AHP ...31 7.4 Neural Network Evaluation Algorithm ........................................................... 33
7.4.1 Analysis ................................................................................................... 33 7.4.2 Conclusion .............................................................................................. 34
8 Strengths and Weaknesses.......................................................................................
8.1 8.2
35
Strengths ................................................................................................... 35 Weaknesses............................................................................................... 35
36 36 37
9 Position paper for the Governmental leadership of China ..................................
10 References ................................................................................................................. 11 Appendix and Supporting Datas ............................................................................
Team # 21185
Page 1 of 42
1 Introduction
Water, the magic encounter between one hydrogen and two oxygen atoms, is vital for all kinds of life forms in the earth. The human body, myriad ecological systems and the big biosphere of our entire planet, all of these can?t live without the beautiful gift from our Almighty God. However, in many parts of the world nowadays, we human are facing severe water problems.
Take China for example. With more than 20 percent of world?s population but less than 7 percent of its freshwater, China is continuously facing issues associated with water. There are mainly three problems in China: too little water in northern and northwestern part of country; too much floods in southern part; and too dirty water produced by industry and agricultural pollutants. Furthermore, being a developing country, China has the responsibility to deal both the soaring water demand caused by booming economy and the increasing need to improve water consumption efficiency.
In order to address problems above and provide a thirteen-year water strategy (2013-2025) for the leadership of China, we conclude five sub-problems to tackle in our paper.
?
Prediction of the supply and demand of water in a period of thirteen years (2013-2025) based on historical data
?
Model building of national water storage and movement strategy to solve China?s uneven distribution of water in time and space
?
Model designing of regional water de-salinization strategy to increase the total amount of available water
?
Model building of water conservation strategy, including regional water pollution treatment and national water-saving
?
Long run cost-benefit analysis of four water strategies above and the discussion of the optimal combination of water strategies
In the whole modeling process, we give full consideration to validity, feasibility and cost-efficiency of our model.
Team # 21185 Page 2 of 42
2 NomenclaturesD S W ??nation
U O N GDP g α ??0 β C E η ??? ???? ????? ???? ???? (x, y) ?????? r ω ??0 Θ p p0 ???????? σ ???? ???? Ⅰ Ⅱ Ⅲ ???? ????,?? The fresh water demand of a region The fresh water supply of a region The total amount of water resources of a region The fresh water demand of whole nation The fresh water demand of whole nation The groundwater resources of a region The surface water resources of a region The population size of a region Gross Domestic Products Real GDP per capita The water supply pressure of a region The national average water supply pressure The water consumption per unit GDP The capacity of a reservoir The average construction costs of a reservoir The actual benefit of a project The range of water resource in a certain period of time The number of a certain province in model two The amount of water a region can?t provide by itself The watershed attribute of the number i province The terrace attribute of the number i province The geographical coordinates of a region?s capital city The distance between region i and j The Earth Radius The edge weights of national water transferring network The estimated water consumption in 2013 The growth rate of water consumption The desalinization cost of tons of seawater The desalinization cost of tons of seawater in 2013 The optimal time to build water purification plant The measurement of the seawater?s desalination cost Demand for water-pollution control degree of number k watershed The water supply pressure of a watershed The highest level of water quality The middle level of water quality The lowest level of water quality The ratio between the sum of Ⅰ ,Ⅱ and Ⅲ water of resources to the total water resources Demand for Water-pollution Control Degree of the number j city in number k watershed
Team # 21185
???? Page 3 of 42
Water Resources of the number k city in number j watershed The total COD in the city?s water of the number k city in number j watershed The chemical oxygen demand The emission of COD per year of the number k city in number j watershed The water consumption of a unit GDP ?????? COD ?????????? Β 3 Model one: Water demand and supply Forecast
(2013-2025)
3.1 Introduction
In order to devise an effective water strategy, we firstly need to predict the total amount of water demanded and that should be supplied in 2013-2025. The water demand and supply forecast is the preparation work for models aiming to increase water resource. That is to say, our water storage and movement, water purification, conservation strategy are all based on the forecast of water.
3.2 Assumptions
? Assume that China's population and other policies don?t have sharp change in the 2013-2025 ? Assume that China maintains a steady economic growth from 2013 to 2025
? Assume that the world?s climate don?t have dramatic changes from 2013 to 2025
3.3 Function Fit Model
To do water forecast, we apply Function Fit Model. First, we collect ten-year water resources data (2000-2010) from China Statistical Yearbook, including total water use, Industrial water consumption, Agricultural water consumption and Live water consumption. Considering the
relationship between time and China?s total water use per year, we then build a Function Fit Model. Namely, we get the most approximate year-water-use function by minimizing the residual sum of squares. Then, putting the time value into the estimated function, we can predict the water demand and supply in next thirteen years.
Team # 21185
Page 4 of 42
3.3.1 Analysis of China’s water use
Based on data we have got, we can draw a 1997-2010 China?s water use table as shown below:
Water consumption 100million
m3 Water consumption 100million m3
1997 1998 1999 2000 2001 2002 2003
5566 5435 5590.88 5497.59 5567.43 5497.28 5320.4
2004 2005 2006 2007 2008 2009 2010
5547.8 5632.98 5794.969 5818.67 5909.95 5965.1545 6021.99
Then, we can get a water consumption trends figure as shown below:
From the figure above, we can see that the average water consumption per year from 1997 to 2004 fluctuates up and down around an intermediate value of 5500. And the deviation value of 2003, which fell sharply to 532 billion cubic meters, probably results from the drought happened in 2003 spring. After 2004, national water consumption per year rise steadily.
Team # 21185
Page 5 of 42
Using the Fit Function Model to fit the data, we firstly can get the Linear and Nonlinear Fit Function as shown below:
From the two linear and non-linear figures above, we conclude the Linear and Nonlinear Fit
Function don?t achieve the ideal imitative effect. Thus, aiming to exclude the climate change factor which restricts water use, in the fitting process we abandon data with sharp fluctuations during 1997-2000, and finally find the real demand of China's water resources.
The figure above shows results of three fitting methods: linear fitting, interpolant and power
function fitting, and the table below shows the fitting degree of those three kinds of fitting methods.
Linear fitting Power fitting Interpolant fitting
Function y=59.35*x-113300 y=1.248e-066x^21.1 - SSE 1.119e+005 1.086e+005 0 R-square 0.7759 0.7826 1 Adjusted R-square 0.751 0.7283 -
RMSE 111.5 116.5 - We can draw the conclusion that the first two fitting results are very close to each other.
Team # 21185
Page 6 of 42
3.3.2 Model Testing
Now, we need to test whether this Function Fitting Model is right. We find the data from “China's sustainable development of water resources in the Strategic Studies”. The data shows that the
predicted water use in 2013 is 7000-8000 one hundred million cubic meters. Then we use our own model to predict the water use in 2013. Comparing these two kinds of data, we find our water use prediction is in great consistency with the data we have find in the report. That is to say, Our model is efficient to predict the probable water use in the future.
3.3.3 Prediction Results and Conclusion
Using the Function Fitting Model, we successfully predict the water demand in 2025. The results show in the table below:
Year 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Linear fitting 6166.41 6225.76 6285.12 6344.47 6403.82 6463.18 6522.53 6581.89 6641.24 6700.59 6759.95 6819.3 6878.65 Power fitting 6187.05 6252.21 6318.03 6384.5 6451.64 6519.45 6587.95 6657.12 6726.99 6797.56 6868.83 6940.81 7013.51 Interpolant fitting
6201.94 6264.81 6329.02 6394.48 6461.13 6528.89 6597.69 6667.46 6738.13 6809.61 6881.85 6954.77 7028.3
However, the confidence of the results obtained by the Function Fitting Model is not very high. We believe the reason lies in the fact that we only use data from 2000 to 2010. And it is difficult to do a thirteen-year prediction by using ten-year data. Because of China?s current rapid economic
development, the growth of population and the speed of economic development is changeable. So we must take changes in social indicators into account to better predict water consumption.
Team # 21185 Page 7 of 42
3.4
Grey Forecasting Model
3.4.1 Reasons for Improvement
The result we get from Function Fit Model is not very ideal, and we believe the key reason lies in the lack of data. In other words, we only get the data from 1997 to 2010. So the fourteen-year data is too less to forecast the thirteen-year trends of future and the exact results is based on the fact that we have get the data of past forty or fifty years. In view of current situation, we devise a Grey
Forecasting Model to get data with higher reliability, thus successfully overcoming the weakness of Function Fit Model.
The advantage of using Grey Forecasting Model is that we can get more reliable results with
lacking accessible data, which perfectly fitted with our current situation. The total amount of water use is consists of agricultural, industrial, live water consumption, and these values are respectively relevant to agricultural GDP, industrial GDP and population, whose data of recent decades can be easily found in China Statistical Yearbook. Thus, if we quantify the interdependence coefficients between each consumption and respective production and the coefficients between production and its influencing factors, we can accurately predict the demand of water based on agricultural GDP, industrial GDP and population data of past decades we have got.
Food Production Agricultrual Water Consumption Populaiton Agricultural GDP Water consumption Industrial Water Consumption Industrial GDP Population Live water Consumption GDP
Team # 21185
Page 8 of 42
3.4.2 Correlation Degree Analysis
Calculation of Correlation Coefficient
First, select a reference sequence as shown below:
??0 = {??0(k)|k = 1,2, … n} = (??0(1), ??0(2) … , ??0(??))
And the other group of sequence is,
???? = {????(k)|k = 1,2, … n} = (????(1), ????(2) … , ????(??)), i = 1 … . m
Then the correlation degree of xi to x0 is,
??
???? = 1 ∑?(??)?? ?? ??=1
in which,
? (??) =
??
?????? ??????|??0(t) ? ????(t)| + ρ?????? ??????|??0(t) ? ????(t)| ?? ?????? |??0(t) ? ????(t)| + ρ???????? ????????|??0(t) ? ????(t)|
Thus, we use ri to describe the correlation degree between xi and x0, namely to describe the influence on x0 caused by the change of xi.
Water Use and agricultural, industrial and live water consumption
Water consumption is equal to the total amount of agricultural, industrial and live water
consumption, but the influence contributed by each type of consumption to total amount is unequal. We define water use change in 10 years as sequence x0 while respectively defining agricultural , industrial and live water consumption as sequence x1,x2,x3. Then, we begin our calculation by using MATLAB.
The figure below shows the relationship between water use and agricultural, industrial and live water consumption.
Putting water consumption x0, agricultural water consumption x1, industrial water consumptionx2, and live water consumption x3 into MATLAB, we can get results of correlation degree analysis.
Team # 21185
Factors Agriculture water consumption Industrial water consumption consumption Live water
Page 9 of 42
Water Consumption Correlation Analysis Associate degree(1) Sub-factors Food production 0.9998 Population Agriculture GDP 0.9997 0.3746 Industrial GDP Population GDP Associate degree(2) 0.9388 0.9090 0.6799 0.7053 0.9022 0.7081 3.4.3 Thirteen-year water forecast based on Verhulst Model
In grey forecasting, we try to find and grasp the law of development of the fund data and at last make a scientific quantitative prediction for the future condition of the system by raw data
processing and grey model building. Currently, the gray forecasting model GM (1,1) is the main application of grey forecasting, but GM (1,1) model is applicable to sequences with strong
exponentially, and can only describe the monotonous process of change. The amount of water is a dynamic time-varying system with some random volatility, and therefore it is more suitable for us to use Verhulst model for non-monotonic swing development sequence.
Team # 21185
Page 10 of 42
3.4.4 Model Solution
We define X(0)as the original data sequence of the total water consumption in year 1997-2010:
(0) (0) (0) } X(0) = {X1 , X2 , X3 ? X(0) Then we can get the whitened equation of Verhulst model,
dX(1)
(1)dt + aX = b
in which the X(1) is the accumulated generating operation sequence of X(0) .
After that, we use the least square methods (LSM) to get the parameter a and b as:
α = (a, b)T = (BTB)?1BTY
in which,
-z2(1) 1 (1) 1 B= -z3
?
1]
[-zn(1) ?
(0) Y = X3
X2 ?
(0)
[X(0) ]
(1) (1) (1)
zk = 0.5(Xk + Xk?1),
The respective time response sequence of Verhulst model is:
?? (1)
?? ?? = 1,2,3 ? , ?? ? 1 ??
X= (??(1) ? ) ?? + ??
0) by repeated decreasing: And we can get the reduced X(
(0) (1) (1)
Xk+1 = Xk+1 ? Xk
3.4.5 Model Testing
We test our model by residual analysis. Define gray forecast sequence as,
(0)) X(0) = (X1(0) , X(0)2 , ? , X
and residual sequence as
(0) (0) (0) ε(0) = (X1(0) ? X1 , X2 ? X2 , ? , X(0) ? X (0))Then, we get relative error sequence:
ε1 ε1 ε1 ?= (| (0)| , | (0)| , ? , | (0)|)
X1 X2 X
Finally, we get the Average relative error sequence as shown below:
1 ??= ∑ ?k
n k=1
3.4.6 Results and Conclusions
After model testing, we can use the Grey Prediction Model to give a more accurate prediction of water consumption from 2013-2025. The following figure and table shows the results of prediction.
Team # 21185
Page 11 of 42
Although the actual water consumption dropped drastically in 2003, the GM prediction results is relatively consistent to data in recent years.
Then we analyze the Residual Error, Relative Error, Limit Deviation Value of GM prediction, and the following table shows the results.
Year
Actual Predicted water water consumption consumption 5623.0 5470.0 5613.3 5530.7 5567.4 5497.3 5320.4 5547.8 5633.0 5795.0 5818.7 5910.0 5965.2 6022.0 5623.0 5440.6 5484.9 5529.5 5574.4 5619.7 5665.4 5711.5 5757.9 5804.7 5851.9 5899.5 5947.5 5995.8 Residual Relative Error Error
0.0 29.4 128.5 1.3 -7.0 -122.4 -345.0 -163.7 -124.9 -9.8 -33.2 10.5 17.7 26.2 0.0000 0.0054 0.0229 0.0002 0.0013 0.0223 0.0648 0.0295 0.0222 0.0017 0.0057 0.0018 0.0030 0.0043 Limit Deviation Value - -0.0363 0.0176 -0.0232 -0.0015 -0.0210 -0.0416 0.0332 0.0071 0.0201 -0.0040 0.0074 0.0012 0.0014 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 By calculating Residual Error, Relative Error and Limit Deviation Value, we can prove the consistency between GM prediction result and the actual water consumption.
Team # 21185
Page 12 of 42
Then, we can predict water consumption of 2013-2025.
Year
Water Consumption
Year
Water Consumption
2013 6143.9 2020 6501.5
2014 6193.2 2021 6554.4
2015 6243.5 2022 6607.7
2016 6294.3 2023 6661.4
2017 6345.5 2024 6715.5
2018 6397.1
2025 6770.1
2019 6449.1
According to GM prediction, water consumption will reach to 7039(hundred million cubic meters) while the government predict that the water consumption would not exceed 7000(hundred million cubic meter) “State Council, <
Therefore, the GM (1,1) Model is efficient and accurate.
4 Model Two: Water Storage and Movement
4.1 Terminology
?? The total amount of water resources of a region
The total amount of water resources is approximately equal to the surface water plus groundwater (we do not consider repeated measures in statistics). We believe that, in the relatively short term, the changes in the water resources depends only on the impact of climate change over time, namely being in a dynamic equilibrium state. So we assume that in the relatively short period of time, total water resources is fixed, and we select the average amount of water resources of a spell as the representative of the amount of water resources.
W≈U+O
?????? Gross Domestic Product
GDP equals per capita GDP times population size, and the per capita GDP is an efficient measure for economic development in a region. So GDP represents the combined effect of population size and economic development.
GDP = N · g
?? The water supply pressure of a region
α is the result of D divided by W. It stands for the ratio between the amount of water a region
should supply and the total amount of water resources, so it is an efficient measure of ecological pressure on water resources in order to meet the water consumption demand.
Team # 21185 Page 13 of 42
4.2
Water Storage Model: Time Balancing Strategy of Water
Resources
4.2.1 Introduction
The goal of water storage is to solve the problem caused by the unevenly distributed water resources in different seasons and years. Namely, our goal in this part is to devise an efficient, reasonable, cost-efficient Time Balancing Strategy of Water Resources.
China's has been explored hundreds of years to work out efficient water storage projects, such as the Three Gorges Reservoir, the Ming Tombs Reservoir and Qiandao Lake Reservoir. However, due to the incompatible development of China?s economy in recent decades and some unscientific projects planning in the last century, and also the effects of climate change, some areas of China still suffer from sharp water fluctuations, and can?t solve the water shortage problem in the drought period.
4.2.2 Analysis
Water storage aims to solve the unevenly distribution of water over time, namely the dramatic water resource change in different seasons and years. Thus, we define the regional variation of the total water resources (W) as the standard measure of the need to build reservoirs, in which W ≈ U + O.
The Groundwater storage involves continuous improvement of the environment, like the increase of vegetation coverage rate, which is difficult to achieve through storage strategy. Besides, the under- ground water (U) makes up only half of the surface water (O). So in our model, we neglect the amount of underground water. In order to taking out the influence caused by the unevenly
distribution of water resource in different regions, here we use the Coefficient of Variation (CV) to measure the degree of change of surface water resources.
CV = σ/μ
where
σ stands for the standard deviation of total water resource of a region μ stands for the mean of total water resource of a region
The coefficient of variation (CV) is defined as the ratio of the standard deviation σ to the mean μ.
Based on the particular value of CV in one region, we can reasonably judge whether this region need a water storage project. Then, we go further towards the specific construction of a reservoir. We use E (The average construction costs of a reservoir) and C (The capacity of a reservoir) to do the cost-benefit analysis.
E = ??0 · ω · log ??
where
??0 is the proportionality coefficient
ω stands for the geographical factor?s impact on costs, like topography
Team # 21185
Page 14 of 42
log ?? stands for the size effect on the construction cost
C = k · [max(O) ? min(O)] = ?? · ???
k is the proportionality coefficient. And C must greater than a threshold ??0, namely achieve an established scale in order to decide implementing a water storage project.
The actual benefit of a reservoir project η,
??
· ??? ??0 · ω · log ?? = ??0 ·ωlog??+ log ??? ?? = ??
The equation above implicates that if the project?s costs is fixed, the greater ?O, the higher actual benefits.
η= ??
4.2.3 Model Solution
Based on China's actual conditions and data sources, we use provinces as the basis for zoning. The
following is the water consumption of all provinces in China from 2000-2010. From the data, we can analyze the change of provinces? surface water over years.
The 2000-2010 line graph of surface water resources in China provinces
Team # 21185
Page 15 of 42
Does it need? –determined by CV
Then, we calculate the CV(S) of provinces and divide them into three levels.
Tibet
Level 1 Level 2 Level 3 0.0558087 Ningxia 0.206058 Shanghai 0.278128
0.1150357 Inner
Mongolia
Xinjiang
0.211229 Hainan 0.304979
Sichuan 0.1187557 Hebei 0.228055 Shanxi 0.320728
Guizhou 0.1285748 Hubei 0.234022 Jilin 0.341804 Yunnan 0.1610587 Zhejiang 0.242901 Jiangsu 0.351941 Qinghai 0.1727455 Shanxi 0.244948 Henan 0.414924 Gansu 0.1778758 Beijing 0.248488 Shandong 0.415128 Hunan 0.1796035 Jiangxi 0.252123 Liaoning 0.527334 Guangxi 0.1919238 Anhui 0.27147 Tianjin 0.574195 Guangdong 0.1923498 Fujian 0.274358 Chongqing 0.1925482 Heilongjiang 0.276789
From the table above, on the one hand, we can conclude that surface water resource change in the western provinces (Tibet, Xinjiang, Sichuan, Guizhou, Yunnan, Qinghai, Gansu, Guangxi and
Chongqing) is less volatile and has the lowest water change level. So in general, we do not consider the construction of water storage projects in these provinces.
On the other hand, the surface water resources of the northern and eastern provinces (Shanghai, Jiangsu, Jilin, Henan, Shandong, Liaoning, Tianjin) is more volatile and has the highest level of water change over years. In order to address these regions' unevenly distribution of water resources, we should consider implementing storage projects in these areas.
Is it cost-saving?--determined by ??
Taking the sequence of building water storage projects into consideration, it is not sufficient enough to decide whether to build a reservoir by only using CV. In other words, we need consider its
economic factors. Thus, we take the region with both greater CV and η into our top priority list of implementing water storage projects.
Comprehensive Consideration
Considering both demand and economy, we get the following table:
Province Ningxia Beijing Tianjin ??? 0.206058 4.77 0.248488 6.743545 0.574195 12.98 CV ?? ∝ ???/ ?????? ??? 7.030023 8.13565 11.6593
Team # 21185
Page 16 of 42
0.278128 30.95 0.228055 39 0.244948 49.7519 0.211229 172.556 0.415128 297.3048 0.320728 324.9316 0.1150357 337.5545 0.351941 367.3848 0.341804 369.29 0.414924 413.3637 0.527334 449.24 0.276789 503.6865 0.27147 624.9 0.234022 679.33 0.242901 818.9488 0.274358 940.51 0.252123 1238.69
20.76261 24.51189 29.32085 77.13965 120.2105 129.3625 133.5082 143.2232 143.8399 157.9936 169.3661 186.4014 223.513 239.8696 281.1111 316.3118 400.4866
Shanghai Hebei Shanxi
Inner Mongolia
Shandong Shanxi Xinjiang Jiangsu Jilin Henan Liaoning Heilongjiang
Anhui Hubei Zhejiang Fujian Jiangxi
From the table above, we can finally figure out the province in which we need to build a water storage project in order to meet water demand in dry seasons. Henan, Liaoning, Heilongjiang, Anhui, Hubei, Zhejiang, Fujian and Jiangxi, these eight province need to pay special attention to water storage, because the building water storage in these area is both in urgent need and economically efficient.
4.2.4 Conclusion
In Time Balancing Strategy of Water Resources, we mainly focus on the uneven deployment of regional water resources in time, especially the surface water resources allocation. And finally figure out eight provinces in which we need to primarily implement water storage project.
In our future work, we will consider some other factors. In terms of economy, we will take additive impacts of building a reservoir into consideration, like power generation, fish breeding. On the
other hand, we will consider the role a reservoir play in redeploying water in different regions. That is to say, a water storage project has the ability to solving uneven water resource distribution not only in one region but in regions by being an end of inter-regional water transfer.
4.3
Water Transfer Model: Spatial Balancing of Water
Resources Strategy
Introduction
4.3.1
Our goal in Spatial Balancing of Water Resources Strategy is to solve inter-regional unevenly
distribution of water resources in space. In other words, no matter what kind of season, wet or dry, if a region suffers from high water supply pressure all the time, we need to consider inter-regional water transfer.
Team # 21185
Page 17 of 42
Similarly, China has long history in solving the water movement problem. The Dayu Legend, which happened five thousand years ago, tells us the story of the first water movement project of ancient China. At that time, the water transfer project mainly aimed to solve the flood, but nowadays we build these projects to better meet the needs of human development and ecological conservation. Over the last decade, the Chinese government not only constructed large-scale water transfer project like South-to-North water diversion but also built local water transfer project like Dujiangyan Dam. Some projects are effective, but others remain to improve.
Therefore, in order to efficiently solve spatial problems, we must consider the following sub-problems:
? Geography and Topography ? Watershed Delineation ? Cost Accounting
4.3.2
Backgrounds and Water Movement Principles
Backgrounds
In terms of Geography and Topography, distribution of the law of the terrain is low-lying West High East, was three-terrace, from west to east, gradually decline. So we can divide three types of terrace: first terrace (4000m above), second terrace (1000m-2000m) and third terrace (1000m below).
In terms of Watershed Delineation, China has nine watersheds: Songliao, Yellow River, Yangtze River, Hai River, Huai River, Pearl River, Southwest, Southeast and Northwest.
Figure China?s Nine Watersheds
Figure. China?s Three Terrace
The provincial administrative division in China gives full consideration to watershed delineation and terrace division, so we give each province a unique watershed attribute and a unique terrace attribute.
Team # 21185
Page 18 of 42
Water Movement Principle
We should follow principles below to work out an efficient water movement strategy.
? We use inner-regional water transfer when water resource supply is complementary within a
region
? We use inter-regional water transfer when most water resource supply within a region is too big
or too small
? We only transfer water from high terrace to low terrace or in the same level of terrace
4.3.3
Model Analysis
The basic ??
Firstly, we choose the province as a basic unit because it?s relationship with Watershed Delineation and statistical convenience, and calculate water supply pressure α of 31 provinces of mainland China.
By calculatingα of each province, we can get the relative value of water supply pressure. In order to determine a reference, we define
??0 = ???????????????
nation
= 0.2 2
as the national average water supply pressure. Then we can calculate the relative water supply pressure using the equation below.
?α = α ? ??0
?α stands for water supply difference between province and national average value.
If ?α of a region greater than zero, we need to transfer water from other water-rich region to this region and vice versa. We divide ?α into five sections as shown in the following Figure.
Figure Classification of Water Supply Pressure
Team # 21185
Page 19 of 42
Figure Colored Graph Based on
at r pply pr r α
From the figure above, we can conclude the overall water supply pressure trend: the eastern and northern have big pressure while western and southern have small pressure. However, in order to specify the problem, we need a more detailed model.
Other Parameters and Requirements
1) Parameters: Attributes of ????
First we number 31 provinces of mainland china as shown in the following table:
i Province 1 Beijing 2 Tianjin 3 Hebei
4 Shanx i 12
5 Inner Mongolia 13
i 9 10 11
6 7 8 Liaoning Jilin Heilo
ngjia ng
14 15 16
Team # 21185
Page 20 of 42
Zhejiang 19 Guangdon
g 27 Shaanxi
Anhui 20 Guan gxi 28 Gansu
Fujian
Jiangxi
Shandong Hena n
23 24 Sichuan Guizh
ou
Province i Province
Shanghai Jiangsu 17 Hubei 25 Yunnan
18 Hunan 26 Tibet
21 22 Hainan Chongqi
ng 29 Qinghai
30 Ningxia
i Province
31 Xinjiang
Then we define each province ???? has following four attributes,
????(?????, ????, ????, x, y)
?? = 1,2,3 ? 31
in which,
????? stands for the amount of water a region can?t provide by itself,
????? = ???? · (?? ? ??0) = ???? · ?α
???? is the terrace attribute, which stands for the number i terrace in which the region situated
???? ∈ {1,2,3}
???? is the watershed attribute, which stands for the number i watershed in which the region situated
???? ∈ {1,2 ? 9}
x represents altitude, y represents longitude, we use the coordinates of the capital city in ????.
2) Water Transferring Distance (??????)
We define the length of water transferring route from region i to region j as,
?????? = r · arcco [???????????????????? co (???? ? ????) + in???? in????
Then we can build a 31 by 31 matrix describing the distance between province i and j,
0 ??1,2 ??1,31
??2,1 ? ? d= ? ? ? ?
0 ] [??31,1 ??31,2
in which r stands for earth radius
3) Parameters of cost and benefit
??? = min*|?????|, |?????|}
E = ??0 · ??????????? · ?????? · log ???????
= min*|?????|, |?????|} ? ???? = ????? j ??
? ???? ∝
??? j
????????? ·?? ?????? · log ???????
4) Requirements
Then the requirement of water transfer from region i to region is,
We only transfer water from high terrace to low terrace or in the same level of terrace, namely
Team # 21185
Page 21 of 42
???? ≤ ????
We do not consider building water transfer project within a watershed, namely
???? ≠ ????
4.3.4 Objective Function of water transfer strategy
Based on parameters and requirements we have mentioned above, we can get the Objective Function to make our water transfer strategy cost-efficient.
z = min{? = ???} ?? ?? = ??min*|????? ≤ ???? ??|, |?????|} ???? ≠ ???? . t. { ????? < 0 < ?????
4.3.5
Model Testing
A simple example
We can use Beijing as an example to test our model, and efficiently work out a plan of transferring water from other province to Beijing. Considering all the restrictions, we have
???? ≤ ???? ???? ≠ ???? t. { ????? < 0 < ????? ????? = 29.1552 Provinces which can provide the water to be transferred include Hunan, Jiangxi, Fujian, Sichuan and Guizhou (eliminate infeasible results like Tibet and Qinghai).
Hunan Jiangxi Fujian Sichuan Guizhou ????, 1341.107 1248.448 1558.67 1520.881 1734.504
2 1 1 2 2 ??
2 2 2 2 2 ??
? -55.6685 -90.907 -53.1004 -283.435 -104.649
η(relative value) 0.10968278 0.043344793 0.03471787 0.096717846 0.084805997
From the table we can see, we can achieve the optimal efficiency by transferring water from Hunan to Beijing.
4.3.6 National water transfer strategy
For all the regions in China, we can build a network connecting every region, and attach weights to
every edge in this network.
ω = 1/?
Team # 21185
Page 22 of 42
The smaller the ω, the greater benefit of the route. Thus, we can work out an effective national water transfer strategy by using minimum spanning tree. The following figure show six optimal water transfer route of China.
Figure. Six Optimal Water Transfer Routes of China
The figure above shows six water routes in China. Line 4 is in perfectly consistency with the
Middle Route Scheme of the South-North Water Diversion Project of China. Besides, Line 5 and Line 6 are similar to the West and Eastern Route Scheme of the South-North Water Diversion Project of China. Thus, our model is efficient and cost-efficient.
4.3.7 Conclusion
Spatial Balancing of Water Resources Strategy Model solves problem in the decision-making process of cross-watershed water transferring, and put forward a realistic water transfer plan.
Although the plan we discussed above is nationwide, we can also apply the model to small
watershed and local water transfer strategy. That is to say, we simply need to refine the geographic attributes and watershed attributes to solve a more detailed water transfer strategy. So our model is universal and feasible.
In a word, our model is efficient, feasible, cost-efficient and universal.
Team # 21185
Page 23 of 42
5 Model Three: Water De-salinization Strategy
5.1
Introduction
In our Spatial Balancing of Water Resource Model, we successfully figure out six nationwide routes of water transferring.
Now we will narrow down the range to discuss water de-salinization by focusing on one single region. Because we have discovered that, some provinces like Tianjin and Shandong, which are in urgent need of water, are located near the sea. So it is more cost-efficient to solve water scarcity problem by de-salinization rather than water transfer. Furthermore, de-salinization is a way to produce new water.
5.2
??0 Θ T p p0 ???????? σ Terminology
The estimated water consumption in 2013 The growth rate of water consumption from 2013 to 2025 The total number of year from 2012 to 2025 which equals to 12 The desalinization cost of tons of seawater, including power, chemicals and maintenance. The desalinization cost of tons of seawater in 2013 The optimal time to build water purification plant The measurement of the seawater?s desalination cost 5.3 Assumptions
? Desalination plant is distributed in the coastal cities. And the establishment of desalination
model just only for the purposes of a city.
? We forecast the coastal city's water consumption is linear growth
? In the 2013 to 2025 year, due to the high cost of construction and maintenance costs of
desalination, we cannot establish many desalination plants in a city. We think that in a coastal city within the 2013-2025 year, construction of two desalination plants is reasonable
? As technology advances, the cost of desalination annually is reduced. We can use
p = p0???σ as the cost of a ton of seawater?s desalination.
? We assume that we need to build a new desalination plant when the demand for water is bigger than the sum of water supply and another amount of desalination plant?s seawater?s desalination.
Team # 21185 Page 24 of 42
5.4
Model Building
In 2013, a region builds a new desalination plant, and it needs to build a new desalination plant
before 2025. We are now considering how to control the scale of the two desalination plants and when to build another desalination plant.
The 2013 year?s demand of water is predicted as??0, and an annual growth rate of water demands θ is constant. We assume a new desalination plant in the year (2013+t) as follows:
The first and second plant?s seawater?s desalination each year is
1
2 ???? ,
1 2 ????
And the cost of the first and the second desalination plant:
1 1 p0θT???σ 2 p0θt , 2
The total cost is
p0 1 1
?? ??(?? + ?????σ )
2 2 0
2 θt + p0θT???σ = 1
5.5 Model Solving
Model solution:
We consider σ = 5 is reasonable,
We use MATLAB to calculate the ???????? to minimize the total cost:
Team # 21185
Page 25 of 42
???????? = ln(????) ??
≈5
5.6
Analysis and Conclusion
For a coastal city, the minimum total cost is
E= ??0??[1 + ln(Tσ)] 2?? And its 13 year?s seawater?s desalination amount is
?W = 1 2 θ??2
Its economic benefits:
??0[1 + ln(Tσ)] ?? = 2
And considering the cost of seawater?s desalination per ????ton in China is 4 RMB,
η = 5.889
η= ?
6 Model Four: Water Conservation Strategy
6.1 Introduction
Based on the above analysis, China is facing a severe water shortage problem. In addition to storage, water transfer, desalination, we should also consider the conservation. The conservation strategy mainly consists of two parts: water-saving and sewage control. We are going to consider the two scenarios.
6.2 Water Pollution Control Model
6.2.1 Introduction
In this model, we will grade the water pollution control demand of cities and use the grading system to decide the sequence of water pollution. In model 2, we work out an efficient water transfer plan by classifying nine watersheds in China. Similarly, we will apply this method to explore water pollution control problem.
Firstly we consider the emergency of water-pollution of each watershed, which can be described as Demand for Water-pollution control degree γ. Then we use γ to decide whether the watershed needs pollution control. After, we take one of these watersheds as our Examination Object and analyze the city?s demand for pollution control.
6.2.2 Assumptions
Team # 21185
Page 26 of 42
? Assume that the sewage emissions last year don?t exceed the environmental self-recovery
capabilities. In other words, the sewage emission per year has no impact on next year's water quality.
? Assume that a large city (100-300 million) belongs to only one watershed and a watershed can
have several large cities.
? Assume that the price of the sewage treatment has no regional differences
? Assume that water treatment costs rise with the increase of COD concentration in water
resources
6.2.3 Terminology
???? ???? Ⅰ Ⅱ Ⅲ ???? ????,?? ???? ?????? COD ?????????? Demand for water-pollution control degree of number k watershed The water supply pressure of a watershed The highest level of water quality The middle level of water quality The lowest level of water quality The ratio between the sum of Ⅰ ,Ⅱ and Ⅲ water of resources to the total water resources Demand for Water-pollution Control Degree of the number j city in number k watershed Water Resources of the number k city in number j watershed The total COD in the city?s water of the number k city in number j watershed The chemical oxygen demand The emission of COD per year of the number k city in number j watershed Model building:
Demand for Water-pollution Control of different watershed:
6.2.4
We define the watershed?s Demand for Water-pollution Control Degree ???? as
???? = ??????????? k = 1,2, ? ,9
in which,
???? is the water pressure of a watershed ???? = ????+????
????+????????
is the ratio of the sum Ⅰ ,Ⅱ and Ⅲ water to the total water resources.
??????? represents the water-pollution situation of a area. Considering that the control for pollution is more urgent than water pressure, we take exponential index of ???????.
???? is the critical criteria of water-pollution control considering the both sides of water pressure and pollution situation.
Team # 21185
Page 27 of 42
Water-pollution for cities in a watershed:
The chemical oxygen demand COD is a critical index to test the water-pollution degree of an area. We take ????,j = ?????? ?????? as the emergency for control of the number j city of the number k
??????
watershed, in which the greater ????,j means the more emergence of control. ?????? means the COD mount in the k, j city?s water:
??
?????? = ∑ cod???????(?????)
??=1
j = 1,2, ? , n
We take the ???(?????) as the interference of upstream city i to the downstream city j and n is the number of cities the watershed flowing through.
The total amount of missions of COD of the number k watershed is (????????1, ????????2, ????????3, ? , ??????????) and we think the minimum of the emergency degree ????is the best:
?? ??
??
min{???? = ∑ ?????? = ∑ ??????
??
????
∑ cod???????(?????)}
??=1
Now we adjust the emissions of COD to minimize????. The optimal COD emission change is:
(?????????1, ?????????2, ?????????3, ? , ???????????)?????? = ??????
The ????? is the minus gradient of ????:
????? = ( ????1 ???? We consider ??
??
??=1
??
)
∑ ?? as the best decline emissions of COD.
6.2.5 Model solution:
Demand for Water-pollution Control of different watershed:
Southwest Northwestern
8 92.6% 103.30 5640.51 0.018314 0.007255
9 90.3% 103.30 1457.31 0.070884 0.028733
The following is the datai and the result of the various watershed: Watershed Songliao Hai Huai Yangtze Yellow Southeast Pearl
k
81 43.1% 566.04
2 40.6% 399.83
3 43.5% 612.18
4 76.8% 1682.31
5 38.6% 388.61
6 76.9% 319.31 2314.36
0.137969 0.063945
7 75.1% 850.78 5251.13 0.162018 0.076455
3 8 3 Wk(10 m ) ??
Dk(10 m )
1372.98 158.99 701.83 10890.79 473.40 0.412271 2.514812 0.872263 0.154471 0.820891 0.267918 1.675645 0.564585 0.071665 0.558018
Team # 21185
Page 28 of 42
As we can see from the figure above, the largest demand for water-pollution control is the Hai watershed, Huai watershed and the Yellow watershed comes next and the least is southwest watershed.
Water-pollution control for cities in a watershed:
We analysis the Hai watershed as its ???? is the greatest. And Datong city, Beijing city and Tianjing city is carefully considered:
Datong
Water consumption
/108m3 Water resources /108m3 ?? ?? ?? ?? ∑
?( ? )
Beijing Tianjin
4.95 35.1 22.3
8.0312 34.2 18.3
0.9265 1.4038 1.2186
??=
Therefore, the Beijing gets the bigger control priority, lower priority shared by Datong.
6.2.6 Model analysis:
Validity Analysis
We consider the k watershed city?s Demand for Water-pollution Control Degree ????as the k, j
Team # 21185
Page 29 of 42
city?s Demand for Water-pollution Control Degree?s weight. And ?????????? can decide the city?s demand in the whole country.
Feasible analysis
We isolate each year to consider the ??????. But for a city, its pollution situation should also relate to the last year?s pollution situation:
??
??????(Y) = ∑ cod????(??)???(?????) + ? ??????(Y ? 1)
??=1
j = 1,2, ? , n ? ∈ (0,1)
in which,
Y stands for year.
??????(Y) means the Y year?s COD amount in the city?s water, and cod????(?? ) means the ye year?s COD emission.
? is the previous year COD amount and next year COD amount ratio, which means the
environmental self-recovery capabilities.
Economic benefits analysis
In fact, investment in various cities of controlling water-pollution is limited by the degree of economic development of the city. And we have to consider the economic benefits.
The consumption of a city?s whole water-pollution control is
?????? = ??0(???????? ? 1)
in which ??0 is the coefficient. If ?????? = 0, the consumption ?????? is 0.
The greater the ??????, the greater the amount of money spent on pollution control. And the economic benefits:
?????? = ??????? ??????
And the whole watershed?s economic benefits:
???? = ∑ ??????????? ∑???? ??????
6.3
Water-saving Model
6.3.1 ?? The water consumption per unit GDP
β means the water consumption of a unit GDP. Thus, it shows the water utilization degree of the
Team # 21185
Page 30 of 42
population and economy. The higher the utilization degree, the smaller water supply required per unit of GDP.
β= ?? ?? · g =
?????? ??
In order to determine a reference, we define
β0 = ??nation??????? = 0.0255
as the national average water consumption of a unit GDP.
6.3.2
Analysis and Conclusion
Analyzing the data from the National Statistical Yearbook of China,We divide ?β into five sections
as shown in the following Figure.
Beijing
Figure. Classification of Water Consumption of a Unit GDP (??) Tianjin Shandong Shanghai Shanxi Zhejiang Liaoning
0.01101
0.012024 0.012917 0.014096 0.014475
Fujian 0.02431
Sichuan 0.02453
Jiangsu 0.02465
Jilin 0.0248
?? 0.005079 0.005135 Shanxi 0.0177
Henan 0.0179 Anhui
Hebei 0.018
Guangdong Chongqing 0.019118
0.019299
Hubei
0.032379 0.036172
Inner Yunnan Hunan Guizhou Hainan
Mongolia
0.03621 0.037898 0.041205 0.041823 0.043392 Heilongjiang Gansu 0.047083 Xinjiang Guangxi
Qinghai
Jiangxi
0.046207 0.04669 Ningxia Tibet 0.056697 0.063333
0.10345 0.113901 0.176276 Comparing the table above with the previous Figure? Classification of Water Supply Pressure ( in Model 2), we are able to draw the conclusion. Water supply pressure of some areas ,such as Beijing、 Tianjin and Shanghai, is relatively high, and at the same time the water utilization degree of these region is also very high, so the need of water-saving is less urgent. But in Ningxia and Gansu, we have much room to improve β ( the water consumption of a unit GDP) so as to relive the water supply pressure.
So, we can justify whether one region needs to pay attention to water-saving strategy according to its β, the water consumption of a unit GDP.
Team # 21185 Page 31 of 42
7 Model Five: Impacts Evaluation Model
7.1 Introduction
In four models above, we have thoroughly analyzed the four water strategies: storage, movement, de-salinization, sewage treatment. To identify the best water strategy, we need a comprehensive analysis.
7.2
The Comparison of η (the actual benefit of a project)
?? ·??? ??0 · ω log ?? + log ??? ? ? ? ?????????? 2. 1
???ij
η???? ∝ ??? ?? ??
2???? · ?? · log ??? ? ? ? ?????????? 2. 2 η= ??0[1 + ln(Tσ)] ? ? ? ?????????? 3
???? = ∑???? ??????? ? ? ? ??????????
∑???? ??????
Firstly, we compare the actual benefit of four strategies we have devised:
η=
{
According to these function from four models, the benefit analysis of a water strategy takes factors such as topography, watersheds, and engineering scale into account. Then we can determine the specific values of the parameters in these equations using Data Mining.
However, η only relates to the current cost and results. It does not take the future impact into account, such as economic, physical, cultural, and environment implications.
7.3 Evaluation of Economic, Physical, and Environmental
impacts using AHP
When we identify the best water strategy, we should consider its economic, physical, environmental and other impacts. And the different strategies have different impacts, so we decide carry out the analytic hierarchy method (AHP).
Analytic Hierarchy Process (Analytic Hierarchy Process, AHP) is a simple method of making complex and fuzzy decision, and it is particularly suitable for those which is difficult to do fully quantitative analysis of the problem.
Modeling with AHP,we in general follow four steps:
(i) establish a hierarchical structure model;
Team # 21185
Page 32 of 42
(ii) construct all levels and in all judgment matrix; (iii) sort Single-level and consistency checking; (iv) sort total-levels and consistency checking.
According to the situation of China, we change the test matrix and get the following results,
Grade 1 3 5 7 9
2,4,6,8 represents the importance The reciprocal value(1/2,1/7…)
Relative importance Equally Important Generally more Important Far more Important
More Important at the second highest degree
More Important at the highest
level is in between according to the above express ?Less important? Economic impact Physical impact environmental impact
Economic impact
Economic impact 1 5/7 4/7
Physical impact environmental impact
7/5 1 4/5 7/4 5/4 1 Storage Movement De-Salinization Sewage
treatment
Team # 21185
Page 33 of 42
1 5/6 5/6 5/3 Storage Movement De-Salinization Sewage treatment
Environmental impact Storage Movement De-Salinization Sewage treatment
6/5 1 1 2 6/5 1 1 2 3/5 1/2 1/2 1
Storage Movement De-Salinization Sewage
treatment 1 6/7 6/4 6/9 7/9 4/9
7/6 1 7/4 4/6 4/7 1
4/9 9/7 9/4 1
Consistency Check of Test Matrix A
n=3, RI=0.508
1
A = (5/
????
/5 / 1 5/
/ /5 1 )
Calculated by MATLAB, ???? = ???? < 0.1 .So the coherence of the matrix is qualified.
The Consistency Check of Total Sequencing of each level
CR = ??1????1 + ??2????2 + ? + ??3????3 ??1????1 + ??2????2 + ? + ??3????3
Through calculation by MATLAB, CR<0.1 So the coherence of the matrix is qualified.
However, we can?t simply think that the greater the value of impact t, the better. We need a dedicated parameter to indicate the degree of quality of water strategy.
7.4 Neural Network Evaluation Algorithm
7.4.1 Analysis
Through continuous research projects that have been implemented, it is able to accurately determine their economic, physical, environmental impacts, and the general degree of quality. Evaluation will be more credibility by establishing relationship between quality and impacts.
So we use a method based on analytical hierarchy process(AHP) for Neural Network Evaluation Algorithm.
We define that one method ???? which contains some attributes:
Team # 21185
Page 34 of 42
???? = (??????, ?????, ??????, ?????????????)
??????: Economic impact ?????: Physical impact
??????: Environmental impact
?????????????: Other impacts which implies the properties considered in the model is scalable
In addition, implemented method has a determined degree of quality:
?????? = 1,2,··· 10
According to ??????, we can divide ???? into 10 categories.
We should collect the data of impacts and degrees of quality. In the following table, we select only a
typical embodiment of each strategy, and assume that the effects of other water strategies to expand the number of neurons.
Three Gorges Reservoir The South–North Water Transfer Project Tianjin Dagang Desalination Plant Taihu Lake Sewage Treatment Others ?????? 6 7 5 7 ··· 7 9 ????? 5 7 ?????? ????????????? 8 6 ?????? 4 7 4 8 ··· 3 4 8 6 3 6 ··· ··· ··· (All various numerical range is 1-10)
7.4.2 Conclusion
Therefore, to evaluate a water strategy, we should:
? Firstly, build the neural network model;
? Secondly, draw attributes of the water strategy using AHP;
???? = (??????, ?????, ??????, ?????????????)
? ·Thirdly, input ???? into the neural network model;
? ·Fourthly, analyze the output results of the degree of quality from neural network model.
Team # 21185 Page 35 of 42
8 Strengths and Weaknesses
8.1 Strengths
? Model 1 is based on quantitative analysis, so our results of prediction progress are objective
and efficient.
? In Model 1, we use different methods to solve the prediction problem and the results we get is
in perfectly consistency.
? In Model 3, we successfully quantify various indicators and get the expected results by
reasonable mathematical derivation.
? In Model 4, we define an effective method to judge the urgency of water pollution control
demand of an area. Based on this method, we can solve water pollution problem effectively.
? In Model 5, we use Neural Network Algorithm to train the Judgment Matrix of the Analytic
Hierarchy Process , thus we eliminate the influence of subjective factors
8.2 Weaknesses
? In Model 1, our Function Fitting Model is restricted by limited data.
? In Model 3, we define several restrictions to simplify calculation process, which is go against
our goal to access the optimal result.
? In Model 4, we don?t get the exact value of the benefits due to lack of data
Team # 21185
Page 36 of 42
9 Position paper for the Governmental leadership
of China
To whom it may concern,
Green lands, beautiful flowers and crystal mountain streams are common sights in many parts of China. But it is also a fact that China is a country facing severe water problems. To help heal the water, we devise the 2015 water strategy and it may include the following 2 aspects:
Inter-watersheds:
The water transfer strategy should be from Yangtze Watershed to Yellow Watershed, Huai Watershed and Hai Watershed。
In addition, we should transfer water from the Southwest Watershed to the Northwest Watershed, and from Southeast Watershed to Pearl Watershed.
And according to the different water-pollution situation between different watersheds, water
pollution of Huai Watershed, Hai Watershed and Yellow Watershed are most serious. The earlier the problem be solved, the lower the cost.
Within a watershed,
we should carry out water storage where water resources change sharply.
To heal the water and to better life of people in China, please consider our plan. The future of China lies in your hand. You won?t regret.
Yours sincerely
10 References
[1] Gordon F L Florida west coast desalter negotiations-progress report #3 1998(03) Scott A S The work exchanger for SWRO energy recovery 1999(04)
[2] Gordon F L.Developer selected for 25MGD(94625m3/d) Florida west coast seawater desalting plant[J]. The international Desalination &Water Reuse,1999,9(1):11~16
[3] WANG Xiaojun; ZHAO Hui; GENG Zhi, Current groundwater exploitation situation and protection countermeasure in China, China Water Resources; 2010 13
[4] Physical maps of china
http://www.china-mike.com/china-travel-tips/tourist-maps/china-physical-map/
Team # 21185
Page 37 of 42
[5] LIN Siqing; ZHANG Weirun, Cost of seawater desalination. J MEMBRANE SCIENCE AND TECHNOLOGY, Vol.22 No.4: 1007-8924,2001
[6] Sylvester J;Nitesh V.C, Evolutionary ensemble creation and thinning. NEURAL NETWORKS,2006
[7]L. Awerbuch, Integration of desalination and power: the challenge in the Middle East. Paper presented at Middle East Energy. Dubai (8–10 October 2001)
[8]J. Andrianne,Power and desalination integrated systems: today's trends.4th Annual IDS Conference, Haifa, Israel (12–13 December 2001)
[9]Jacques Andrianne;Félix Alardin, Thermal and membrane processe economics: Optimized
selection for seawater desalination. Desalination,Volume 153, Issues 1–3, 10 February 2003, Pages 305–311
[10] TEAM 2239 of HiMCM, Water,Water Everywhere
[11] China Statistical Yearbook http://www.stats.gov.cn/tjsj/ndsj/
11
Appendix and Supporting Datas
11.1Regression analysis
clc clear
x=importdata('97-10data.txt'); total=x(:,8); live=x(:,11); arg=x(:,9); ind=x(:,11); pop=x(:,15); argGDP=x(:,16); food=x(:,14); indGDP=x(:,17); popGDP=x(:,19);
argf=[ones(14,1),food,argGDP,pop]; arg_re=regress(arg,argf)
livef=[ones(14,1),pop,popGDP];
正在阅读:
数学建模2013B - Outstanding - paper - 图文05-21
教育学 心理学 记忆口诀11-17
2022年青岛大学文学院655中国古代文学之中国文学史考研仿真模拟04-12
中国电脑回单柜行业市场前景分析预测报告(目录) - 图文12-01
湿度传感器设计05-18
义务教育阶段学生辍学报告书05-23
浅谈孝道在和谐社会中的作用01-09
传感器课程设计03-01
中国近代社会习俗变迁方式的分析01-24
- 多层物业服务方案
- (审判实务)习惯法与少数民族地区民间纠纷解决问题(孙 潋)
- 人教版新课标六年级下册语文全册教案
- 词语打卡
- photoshop实习报告
- 钢结构设计原理综合测试2
- 2014年期末练习题
- 高中数学中的逆向思维解题方法探讨
- 名师原创 全国通用2014-2015学年高二寒假作业 政治(一)Word版
- 北航《建筑结构检测鉴定与加固》在线作业三
- XX县卫生监督所工程建设项目可行性研究报告
- 小学四年级观察作文经典评语
- 浅谈110KV变电站电气一次设计-程泉焱(1)
- 安全员考试题库
- 国家电网公司变电运维管理规定(试行)
- 义务教育课程标准稿征求意见提纲
- 教学秘书面试技巧
- 钢结构工程施工组织设计
- 水利工程概论论文
- 09届九年级数学第四次模拟试卷
- 数学建模
- Outstanding
- 图文
- 2013B
- paper
- 基于plc控制的抢答器设计 - 图文
- 管理学原理复习总结
- 长沙市田家炳实验中学(东校区)
- 国际永磁电机制造行业发展状况及趋势报告
- 江西省吉安县油田中学2013-2014学年高中语文苏教版选修《现代散
- 略论马基雅维利的史学思想
- 三年级《4、当我独自一人时》教案
- 工程项目目标责任管理考核实施办法9
- 并购融资经典案例
- 2018最新建筑专业技术年度的工作总结范文-优秀word范文(3页)
- 继电保护检验规程(08年发布)
- 南昌大学汽轮机原理实验报告
- 夯实基础 加快盐津农业现代化进程
- 毕业设计论文二级减速器
- 数学分析课程教学大纲
- 中国连动杆总成市场发展研究及投资前景报告(目录) - 图文
- 001施工组织设计-景观
- 维他奶公司的渠道分析
- 比尔盖茨夫妇在2017年斯坦福大学毕业典礼励志演讲稿
- 护理管理单选