贵南路冬期施工组织设计
更新时间:2023-10-24 16:13:01 阅读量: 综合文库 文档下载
- 贵南路在哪里推荐度:
- 相关推荐
西宁市贵南路(桥)市政工程 冬季施工专项方案
目 录
一、编制依据 ····························································································································· 1
1.1编制依据 ······················································································································ 1 二、工程概况 ····························································································································· 2
2.1总体工程概况 ··············································································································· 2 2.2冬季施工工程概况 ······································································································· 3 三、冬季施工组织 ····················································································································· 5 3.1冬施项目组织管理及人员配置计划············································································· 5
3.2 施工作业队及劳动力组织 ··························································································· 9 3.3冬季物资准备情况 ······································································································· 9 四、冬季施工安排 ··················································································································· 11
4.1冬季施工的一般规定 ································································································· 11 4.2冬季施工作业内容: ································································································· 11 4.3冬季施工作业内容施工时间安排 ·············································································· 11 4.4工程准备情况 ············································································································· 12 五、冬季施工方案 ··················································································································· 13
5.1钢筋工程 ···················································································································· 13 5.2 3号桩基、承台、墩柱混凝土冬季施工方案 ··························································· 14 5.3冬季砼养护温度应急措施 ·························································································· 15 5.4 河道满堂支架膺架螺旋管临时支墩体系施工 ·························································· 15 5.5大体积混凝土冬期施工要求 ······················································································ 18 5.6冬季河道螺旋支墩施工方案 ······················································································ 19 5.7冬季排水管道施工方案 ······························································································ 22 5.8搅拌站冬季施工保温措施 ·························································································· 23 5.9 冬季施工混凝土搅拌站的要求 ················································································· 24 5.10冬季施工测温规定和要求 ························································································ 26 5.11 项目部测温管理 ······································································································ 27 六、冬季施工质量管理 ············································································································ 29
6.1质量管理体系 ············································································································· 29 6.2质量保证措施 ············································································································· 29 6.3施工保证措施 ············································································································· 30 七、冬季施工安全管理 ············································································································ 31
7.1项目安全管理目标及管理机构 ·················································································· 31 7.2冬季施工管理 ············································································································· 31
中铁十五局集团有限公司 第1页 共37页
西宁市贵南路(桥)市政工程 冬季施工专项方案
一、编制依据
1.1编制依据:
(1)《西宁市贵南路(桥)施工图纸》;
(2)《公路桥涵施工技术规范》(JTJ F80—2008); (3)《建筑工程冬期施工规程》(JGJ/T 104—2011); (4) 冬期施工手册 中国建筑工业出版社
(5) 西宁市建设工程质量站文件宁质监(2012)026号文件《关于建设工程冬期施工的通知》
中铁十五局集团有限公司 第1页 共37页
西宁市贵南路(桥)市政工程 冬季施工专项方案
二、工程概况
2.1总体工程概况:
西宁市贵南路(桥)工程位于西宁市城东区,南起八一路,北至朱家庄,起始点桩号K0+000—K1+391.308,道路全长1391.308米,为城市次干道,其中桥长135.21米,规划宽度26米(车行道16米+人行道235米),主要建设内容有:道路、桥梁、排水、照明、绿化、交通及附属设施等。
1、桥梁工程:贵南桥设计起点桩号为:K0+071.37,终点桩号为:K0+206.58,总长135.21米,横断面布置为5米(人行道)+16米(行车道)+5米(人行道),桥宽26米。桥梁采用(22+18+35+35+18)米的变截面预应力混凝土连续梁。箱梁采用预应力混凝土现浇连续箱梁,单箱五室断面,梁高1.7米—2.4米,边腹板为弧形。桥梁下部桥墩采用顺河道布置,每一支承点处为3根直径为1.5米圆柱墩。3号墩柱端部扩大直径1.8米,桩与墩之间设置2.0米和2.5米厚的承台,尺寸6.5*2米,承台下设2根1.5米的桩,横桥向承台由系梁连接成“王”字型。桥台采用钢筋混凝土柱式桥台,台后接路基。基础均采用直径为1.5米的钻孔灌注桩。
箱涵及U型槽:因下穿兰西铁路和付东路,设置箱涵2座,一是下穿兰青铁路,桩号K0+925.324—K0+951.039,全长25.715米;一是下穿付东路公路箱涵,桩号K1+008.354—K1+063.358,全长55.00米。箱涵横断面净宽17米,顶板厚1.1米,侧墙厚1.2米,底板厚1.3米,现浇钢筋砼结构。在两个箱涵的进出口处均设置U型槽,U型槽起点桩号为K0+800.00,终点桩号为:K1+225.00(其中K0+925.73—K0+951.40为下穿铁路箱涵段)总长399.33米。U型槽断面净宽17米,侧墙、底板均厚0.8米,现浇钢筋砼结构。根据道路横断面,U型槽分为A、B、C、D四类。
2、道路工程:贵南路南起八一路与贵南路交叉路口,北至付东路北侧400米。设置主线一条,四条辅道。主线路面宽度:16米车行道+2*5米人行道=26米;A、B、C、D辅道宽度12米—22米不等。
3、排水工程:贵南路雨、污水工程,全线共设一条主线,A、B、C、D四条辅道。雨水管道共分为A、A1、B、C、D五段。其中主线A、A1由南向北排入湟水河,辅道B、C、D三段由北向南排入沙塘川河内。雨、污管道设计管径d500mm—d800mm。污水管道:污水管道设计起点位于兰西高速路南侧,污水由北向南排放,终点接入
中铁十五局集团有限公司 第2页 共37页
西宁市贵南路(桥)市政工程 冬季施工专项方案
滨河路已设计d800cm污水干管,设计管径d400mm,设计管道长度458.40m。设计污水管道位于设计道路中线西侧9.5米处。雨、污管材均采用Ⅰ、Ⅱ级抗硫酸盐水泥砼管,基础均采用120°和180°混凝土基础。
2.2冬季施工工程概况:
2.2.1、桥梁工程:
3号桩基6根,桩基直径150cm,设计长度34米;3号承台1个,长度18.5米,宽度6.5,高度2.5米,“王”字型结构;3号墩柱3根,直径150cm,顶端1.5米渐变为扩大直径为2.0米。混凝土强度等级采用C35抗硫混凝土。
2.2.2、桥梁跨湟水河河道膺架体系施工:
(1)河道围堰施工:因3号墩在现状河道中央、跨湟水河河道膺架螺旋管支墩施工需要进行河道围堰,按照项目部编制的河道施工方案,河道围堰需进行两阶段施工,第一阶段在北岸设置围堰,将水引入南侧,进行3号桩基、承台、墩柱和河道条形扩大基础和螺旋管支墩施工,第二阶段设置围堰在南岸,将水引入北岸,进行南侧河道条形扩大基础和螺旋管支墩施工。 (2)条形扩大基础及螺旋管支墩施工
根据施工方案,河道内共设置8道临时墩,第一阶段围堰,进行4—8号条形扩大基础及螺旋管支墩的施工;第二阶段围堰,进行1—3号条形扩大基础及螺旋管支墩的施工。
(3)工字钢横梁、贝雷架组装、安装。 2.2.3、排水管道施工: (1)雨水管道:
污水管道施工YA29—YA33四个井段,施工长度147.7米,接入现状湟水河河道内。管道采用D1000mmⅡ级抗硫酸盐钢筋砼承插口管。基础采用120°混凝土基础。
(2)污水管道:
污水管道施工W11—W14三段,施工长度137米,接入现状污水管道。污水管道采用D500mm管道Ⅰ抗硫酸盐钢筋砼承插口管。基础采用120°和180°混凝土基础。
中铁十五局集团有限公司 第3页 共37页
西宁市贵南路(桥)市政工程 冬季施工专项方案
(3)雨、污检查井:
雨、污水检查井采用圆形混凝土(盖板式)、矩形混凝土现浇,基础采用砼基础。
中铁十五局集团有限公司 第4页 共37页
正在阅读:
贵南路冬期施工组织设计10-24
ZBRUSH的界面介绍和基本视图操作09-29
2012年孔子学院志愿者面试经验总结03-08
以楼宇文化建设为抓手11-21
江苏省扬州市2019年九年级下学期中考一模考试物理试题(含答案)05-14
畜禽普通病模拟考试卷及答案02-03
在2021年青年五四座谈会上的讲话08-17
- 多层物业服务方案
- (审判实务)习惯法与少数民族地区民间纠纷解决问题(孙 潋)
- 人教版新课标六年级下册语文全册教案
- 词语打卡
- photoshop实习报告
- 钢结构设计原理综合测试2
- 2014年期末练习题
- 高中数学中的逆向思维解题方法探讨
- 名师原创 全国通用2014-2015学年高二寒假作业 政治(一)Word版
- 北航《建筑结构检测鉴定与加固》在线作业三
- XX县卫生监督所工程建设项目可行性研究报告
- 小学四年级观察作文经典评语
- 浅谈110KV变电站电气一次设计-程泉焱(1)
- 安全员考试题库
- 国家电网公司变电运维管理规定(试行)
- 义务教育课程标准稿征求意见提纲
- 教学秘书面试技巧
- 钢结构工程施工组织设计
- 水利工程概论论文
- 09届九年级数学第四次模拟试卷
- 南路
- 组织设计
- 施工
- 安远五个十重点工作项目安排表 - 图文
- 我心中的宜居幸福城市-张
- 法官园地
- 超准的心理测试图片
- 迎接油田上半年安全环保大检查汇报材料(定稿)
- 电磁场选择题
- NC单据开发经验1
- 144项大神级ppt技术
- 第三讲 档案馆工作基础-测试201605
- 惠崇《春江晓景》教学设计
- 盐城中学简介 - 图文
- 学习右玉精神 转变机关作风 促进工作落实
- 第五章 数组
- 化学2019年中考试题-2019年江苏省常州市中考真题试题含答案
- 藏外道书书目略析一
- 2015-2016学年江苏省徐州市高三(上)期末英语试卷
- 南京大学仪器分析习题13-18解答
- 绵阳市国家投资工程建设项目房屋建筑及市政工程标准施工招标文件
- 水质砷的原子荧光法技术研究
- 矩阵的秩例题教学浅析 - 图文