Component/System Name: AP Number: Part Number(s): Program/Vehicle Line: Level of Supplier Integration
1. Technical Information
A. GM Design responsible: Supplier Integration Level I 1.1 Design FMEA completed by GM Engineering?
1.2 Have KCDS (GMW15049) items been identified by Engineering?
If No, will a KCDS Workshop planned?
1.3 Will drawings/SOR/SSTS/CTS and other technical information be sufficient to ensure
comparable quotes? Commodity Key Stakeholders Meeting Checklist
YES NO
Comments
B. Supplier Design Responsible: Supplier Integration Level II
1.4 Will preliminary KCDS (GMW15049) items be identified by Engineering? Sufficient? 1.5 Will approved SSTS/CTS/SOR and other technical documents be sufficient to ensure
comparable quotes?
1.6 Will preliminary A/D/V P&R plans (GM1829) be completed by Engineering
(Approved by GM)?
C. Supplier System/Design Responsible: Supplier Integration Level III & IV 1.7 Will preliminary KCDS (GMW15049) items be identified by Engineering? 1.8 Will the Statement of Requirements (SOR) be included and sufficient?
1.9 Will approved SSTS/CTS and other technical documents be sufficient to ensure
comparable quotes?
1.10 Will preliminary A/D/V P&R (GM1829) plans be completed by Engineering
(Approved By GM)?
2. Timing
2.1 Has the Buyer provided Program & sourcing timing (Pre-RFQ through Sourcing decision)?
2.2 Has Product Engineer provided development timing (Prototype, drawings, definition of
requirements etc.)?
2.3 Has SQE provided timing for quality requirements (GP-12, PPAP and Run @ Rate)?
3. Quality Expectations
3.1 Has the SQE verified that the Supplier Quality SOR (GM1927-3) and Part-Specific
Quality & Process SOR, if applicable, will be included in the RFQ? 3.2 Will the following requirements (if applicable) be included in the RFQ?
a-Tooling Standards, at SOR appendix N: 1-GMW15850 - Plastic Injection Molds, 2-VTSSD – Stamping Dies and 3-GVATDCS1 – Assembly Fixtures
b-Gage requirements, at SQ SOR:
1-GM1925 – Checking Fixtures 3.3 Have warranty targets been established? 3.4 Have functional tests been identified?
4. Bidders List
4.1 Do all suppliers on bidders list fulfill Quality Criteria?
4.2 Is PSA (Potential Supplier Assessment) or PCPA (Process Control Plan Audit)
required for any supplier?
4.4 New business hold list provided by Creativity Team?
January 25, 2009
1 of 2
GM 1927-6
Commodity Key Stakeholders Meeting Checklist
YES NO Comments
5. Capacity Requirements
5.1 Daily Capacity Requirements (LCR / MCR) established? 5.2 Option Penetration identified?
5.3 Additional capacity needed for carry-over parts identified?
6. Manufacturing Requirements 6.1 Assembly plants identified? 6.2 Broadcast window (if required)?
7. Bill of Material (BOM)
7.1 BOM identified for assemblies?
8. Other
8.1 Are any components a directed buy? Has the Directed Buy Checklist GM1927-23
been agreed and included in the RFQ, if required?
8.2 Has After-Market flexibility capacity and packaging been considered and included in
RFQ? 8.3 Is warehousing required? 8.4 Is special packaging required? 8.5 Are parts shipped directly to a GM facility? 8.6 Are parts to be sequenced?
RECOMMENDATION: Items on previous pages are fulfilled satisfactorily. Information to be included in the RFQ package will be sufficient to
obtain Quality assured and comparable quotations.
Items on previous pages are NOT fulfilled satisfactorily. However the information will be sufficient to obtain Quality
assured and comparable quotations. Exceptions and corrective actions are to be listed on the APQP Open Issues List GM1927-5 and tracked to closure.
Items on previous pages are NOT fulfilled and do not believe Quality assured and comparable quotations will be
received.
? The recommendation will be to stop the RFQ package until open items listed on the APQP Open Issues List
GM1927-5 are resolved satisfactorily.
Date:
______________________________________ Buyer
______________________________________ Product Engineer
______________________________________ SQE
January 25, 2009
2 of 2 GM 1927-6
- exercise2
- 铅锌矿详查地质设计 - 图文
- 厨余垃圾、餐厨垃圾堆肥系统设计方案
- 陈明珠开题报告
- 化工原理精选例题
- 政府形象宣传册营销案例
- 小学一至三年级语文阅读专项练习题
- 2014.民诉 期末考试 复习题
- 巅峰智业 - 做好顶层设计对建设城市的重要意义
- (三起)冀教版三年级英语上册Unit4 Lesson24练习题及答案
- 2017年实心轮胎现状及发展趋势分析(目录)
- 基于GIS的农用地定级技术研究定稿
- 2017-2022年中国医疗保健市场调查与市场前景预测报告(目录) - 图文
- 作业
- OFDM技术仿真(MATLAB代码) - 图文
- Android工程师笔试题及答案
- 生命密码联合密码
- 空间地上权若干法律问题探究
- 江苏学业水平测试《机械基础》模拟试题
- 选课走班实施方案
- Stakeholders
- Commodity
- Checklist
- Meeting
- January
- 1927
- 2009
- Key
- GM
- 06
- 三角函数的诱导公式习题及答案解析 - 图文
- 胞生名词解释 2(1)
- 招标货物技术规范
- 2005年上海市中考物理试卷
- 义务教育学校标准化评估验收自评报告
- 吉林省中小学教师水平评价基本标准条件
- 六年级数学入学测试
- 卫生部关于印发《新资源食品安全性评价规程》和《新资源食品卫生行政许可申报与受理规定》的通知
- 马哲论文
- 实用详细销售谈判技巧
- 黑龙江省哈尔滨第九中学2008届高三年级第四次月考语文试题
- 寄高中生高中生寄语
- 六年级 语文作业单
- 福建省眼镜制配场所诚信计量承诺行为准则
- 商务谈判案例
- 中共湖南农业大学委员会关于印发学校第八次党代会党委工作报告和纪委工作报告的通知
- 探究国内建筑幕墙的设计弊端与解决方法
- 2018春学期高三年级工作计划
- 哈佛经营管理学 - 第三章 哈佛的经营管理原则
- 综合作业题目