Mongolia electricity single buyer
更新时间:2023-03-19 08:13:01 阅读量: 人文社科 文档下载
Economic Policy Reform and
Competitiveness Project
Evaluation of the functioning of current “single buyer” wholesale
electricity market in Mongolia
January 2006
Ulaanbaatar, Mongolia
This publication was produced for review by the United States Agency for International Development. The views expressed in this publication do not necessarily reflect the views of the United Agency for International Development or the United States Government.
Project:
Report Title:
Main Author:
Contract No.
Submitted by:
Telephone and fax:
Contact:
E-mail address:
Mongolia Economic Policy Reform and Competitiveness Project (EPRC) Evaluation of the functioning of current “single buyer” wholesale electricity market in Mongolia Michael Bekker 438-C-00-03-00021-00 EPRC Project/Chemonics International Inc., Tavan Bogd Plaza, Second Floor, Eronhii Said Amar Street. Sukhbaatar District, Ulaanbaatar, Mongolia (976) 11 32 13 75 Fax: (976) 11 32 78 25 Fernando Bertoli, Chief of Party fbertoli@
ABBREVIATIONS AND ACRONYMS
CES
CHP
CMS
EES
ERA
GoM
JSC
MZBA
NDC
UES
WES
Central Energy System Combined Heat Plant Cash Management System Eastern Energy System Energy Regulatory Authority Government of Mongolia Joint Stock Companies Main Zero Balance Account National Dispatch Center United Energy System Western Energy System
TABLE OF CONTENTS
ABBREVIATIONS AND ACRONYMS.....................................................................................i BACKGROUND..........................................................................................................................i SECTION I: THE “SINGLE BUYER MARKET” MODEL – DESCRIPTION AND
ASSESSMENT OF ITS EFFICIENCY.......................................................................................1
SECTION II: CONCLUSION AND RECOMMENDATIONS..................................................3
BACKGROUND
1.1. General overview of Mongolian electric power system
The electric power system in Mongolia consists of three independent electric power systems: the Central Energy System (CES), the Western Energy System (WES), and the Eastern Energy System (EES). In 2001 the Government of Mongolia (GoM) has taken major steps toward restructuring the energy sector by passing the 2001 Energy Law, establishing the Energy Regulatory Authority (ERA) and establishing a set of rules and regulations to promote private sector investments in the energy sector. The GoM has created 18 Joint Stock Companies (JSC) including generation, transmission and distribution entities and National Dispatch Center or NDC, which together comprise the energy sector.
The share entitlements of these companies (except NDC) were distributed as follows:
41% - to the Ministry of Infrastructure
39% - to the State Property Committee
20% - to the Ministry of Finance and Economy.
The NDC is responsible for dispatch of the CES transmission network. It was created as a LLC and its shares were distributed to the Ministry of Infrastructure (51%) and to the State Property Committee (49%).
The main Mongolian electric system is operated by the Central Energy System (CES) which represents 80% of all Mongolia electricity supply. The CES power supply is comprised of five coal burning generating plants and interconnection to UES of Russia. The other two networks – EES and WES are quite small. WES operates on imports of electricity from Russia, EES has one CHP with installed nameplate capacity of 36 MW, of which only 7 MW is available.
For the purposes of evaluation of market model in Mongolia the focus is on the CES system and its entities. Total installed nameplate capacity of CES is 753 Mw of which only 633 Mw are available. There is also a contract with Inter RAO of Russia to supply up to 160 Mw of capacity through a double circuit 220 KV line, normally operating at 110 KV level. The contract is in effect through December 31, 2007. There is also a contract with Inter RAO for the export of power. The export is utilized to transfer excess power caused by heat demand during the off-peak electricity demand hours. Since the contractual price for exported power is very low, the export is in effect used to dump power.
1.2. Adequacy of generating resources to maintain reliability and quality of power
supply
The existing capacity of CHP plants is generally sufficient from the point of view of installed capacity requirements of the power system with the annual peak of the order of 550 MW, which occurred this season in December 2005. However the power plants’ equipment is in most part very aged, the youngest plant – Ulaanbaatar CHP 4 commenced its operation in 1981 and is the only plant capable of participating in frequency regulation, perform load following and to provide limited operating reserve. There currently is no capability to regulate system frequency and to withstand contingencies without reliance on the interconnection with Russia.
1.3. Transmission System and NDC
The CES transmission system interconnects three main load centers - Ulaanbaatar, Darkhan and Erdenet and the power plants in these cities by a 220 KV transmission line ring.
Economic Policy Reform and Competitiveness Project
Transmission voltages are 220 KV and 110 KV, distribution voltages are 35 KV, 10 KV and 6 KV.
The National Dispatch Center is responsible to coordinate daily system operation of all power and heat sector entities which includes the real time coordination of the power plants operation, transmission and distribution switching operations, operation of the heat transmission network in coordination with the CHP operations. The currently available hardware and software systems at NDC were not originally designed for the control of the power system network. All communications and data acquisition are mostly communicated by telephone and fax.
The NDC is also responsible for providing the information necessary to settle spot market transactions within the context of the wholesale electric power market which is currently structured on a “single buyer market” model. These responsibilities will be discussed in more details in the sections below.
Background Page ii Evaluation of the functioning of current “single buyer” wholesale electricity
market in Mongolia
SECTION I: THE “SINGLE BUYER MARKET” MODEL – DESCRIPTION AND ASSESSMENT OF ITS EFFICIENCY
2.1. Transition to the “Single Buyer Market”
Immediately upon structural and functional reorganization of the national electric power system, the wholesale market transactions were implemented based on the system of vested bilateral obligations between distribution companies and generators. That system proved to be short-lived. Distribution companies were plagued with retail revenue collection problems. That and possible misappropriation of funds by distribution companies caused the situation where generating companies consistently under-collected a significant portion of the revenue needed not only to maintain the equipment but to pay their fuel suppliers.
Some generating companies also complained that the assignments of these bi-lateral obligations were unfair in the way that some generating companies were assigned most of the contracts with distribution companies with relatively high collection rates while other generating companies receive contracts with distribution companies with low collection rates. Although, as we were told, these bi-lateral obligations were legally enforceable in practice it was nearly impossible to obtain relief through the legal system. On average generators used to collect approximately 60 to 70% of the payments due them.
2.2. Description of the “Single Buyer Market”
Facing the above described problems in 2001, the ERA adopted a market model which became known in Mongolia as the “Single Buyer Market”. Under this model there are no longer any bi-lateral obligations between generating and distribution companies. The flow of funds under this model is implemented through a Cash Management System (CMS) under which retail customers of state owned distribution companies deposit their payments into the so-called “zero balance” accounts established by each distribution company. These accounts prohibit any withdrawals by distribution companies. At the end of each day funds from these accounts are transferred into what is called “Main Zero Balance” account (MZBA), established in the Mongolian Savings Bank. Private distribution companies are not mandated to establish “zero balance” accounts and are allowed to make direct payments to the “Single Buyer”. Disbursements to the market participants (distribution and generation companies) and to the dispatching entity are made from MZBA in accordance with the pre-agreed allocation formula approved by licensees at their annual meetings, by the Transmission Company, which acts as if it were a Single Buyer. The CMS ensures that each entity receives a “fair” share of collections. However, the only entity that receives full payment due is a supplier of imported power. The amount of payments to other entities varies depending on retail revenue collection.
It has to be mentioned that because the funds allocation formula is based upon forecasted levels of consumption and generation, within the framework of the “Single Buyer” market, it is also necessary to operate a spot market, where generation companies settle deviations from planned output. Only generating companies participate in this market under the rules approved by ERA. The settlement between concerned generation companies is performed by adjusting the allocation of revenue due to these companies.
According to representatives of the ERA, Ministry of Fuel and Energy and generation companies, since the CMS system was introduced the collection rate of funds available to the “Single Buyer” for disbursement has improved significantly. For example according to the management of Ulaanbaatar CHP 4, the station now receives 97% of the revenue that would be due it based on generated energy and the approved generation tariff.
Economic Policy Reform and Competitiveness Project
2.3. Assessment of the efficiency of the “Single Buyer” Market model
It has to be noted that characterization of the current system as a “Single Buyer” market is somewhat of a misnomer. The transmission company is not taking a title to the energy produced by generation companies, and is not legally responsible to pay them for what was actually supplied. It just simply allocates what funds are available to it in the MZBA redundant. This system also cannot be characterized as a power exchange in the traditional meaning of this word, since the settlement by funds allocation formula doesn’t track payments to the actual amount of energy produced and consumed. In fact this system represents an operation of a vertically integrated utility which is functionally unbundled into several business units and whose corporate management vested responsibility to distribute collected retail revenue among business units in accordance with the pre-approved formula into only one of these business units (in this case - transmission company).
As such, this system has all advantages and disadvantages associated with the reliance by consumers on the operation of a vertically integrated utility.
The advantages of the current system are:
Relative simplicity
Allows easy balancing of supply and demand and settlement at deviations
through the simple spot market settlement process
Prevents misappropriation of retail revenue
Provides financial stability to power sector entities
Contributes to maintaining reliable power system operation under difficult local
conditions
The primary disadvantages of the current system:
It does not foster competition
It allows government intervention into the settlement procedure
It doesn’t promote market relationship between distribution and generation
entities
It doesn’t provide non-privatized distribution companies with sufficient
incentives to improve collection of retail revenue
As was noted above, within the framework of the system, a spot market for energy to settle the deviation between planned and actual generation also is in operation. Only generators “participate” in this spot market.
The spot market functions in the following way: The daily regime planning group of the NDC develops generation dispatch schedules for the next “operating” day. During the “operating” day dedicated staff within this group tracks all deviations from the dispatch schedule, prices the energy deviations in accordance with the spot market rule developed by ERA staff and approved by the ERA and submits this data to the transmission company to be used subsequently for adjustments to funds distributed among generators as part of the funds allocation process. The spot market rule is somewhat simplistic and vague and doesn’t take into account all possible situations. According to the rule, energy deviations should be priced at the respective energy tariffs or by combined tariff if the two-part tariff is not yet in place. That doesn’t seem to be reasonable. As was noted above only generation deviation is settled through the spot market. Deviations on demand side are simply ignored. It is obvious that current spot market arrangements leave room for improvement.
Section I Page 2 Evaluation of the functioning of current “single buyer” wholesale electricity
market in Mongolia
SECTION II: CONCLUSION AND RECOMMENDATIONS
From the numerous discussions with power sector entities representatives it became obvious that implementation of the “Single Buyer Market” model played a positive role in the development of the national power system during difficult times.
It prevented the power system infrastructure from financial collapse and helped to maintain reliable operation of the power system by introducing financial stability to the power sector. However further movement toward privatization and introduction of competition into the power sector would require an introduction of market tools into the sector operation, such as bilateral contracts between distribution and generating companies, competitive bids in the spot market, participation of load serving entities in the spot market, etc. These developments can’t be supported within the framework of the current system. If distribution companies are to be privatized the “zero balance” accounts will have to be abandoned or at least to a large degree, modified. Investors in new generation like to have an opportunity to enter into bi-lateral contracts with buyers and receive direct payments specified in contractual terms. It is obvious that the current system is in need of changes. In our opinion the current system should be transformed to a system based on bi-lateral contracts between generation and distribution companies, supplemented by an orderly spot market, where both generation and distribution entities settle their deviation. In the beginning, bi-lateral contracts and the spot market could be based on regulated tariffs (two-part tariffs will have to be developed) and within several years gradually transition to a mostly competitive market.
Preparatory work needs to be done before the new system is implemented, i.e., examination of existing legal arrangements, introduction of two-part tariffs for generation, development of market rules and procedures, development of a standard contract for sale/purchase of electricity, training of NDC staff, upgrading NDC technical capabilities to control real time power system operation and to perform settlement and billing functions. A system of third-party financial guaranties would have to be developed. Alternatively some elements of the current cash management system may be employed as part of contractual arrangements.
There is no urgent need to rush a transition until all above listed milestones are accomplished. Only after market participants can demonstrate accountability, honor their contractual obligations and pursue disputes in accordance to existing regulations and laws should the new market model be implemented.
正在阅读:
Mongolia electricity single buyer03-19
《马说》原文、词解及译文及结构分解06-19
中国跆拳道护头行业市场前景分析预测报告(目录) - 图文10-01
新生儿破伤风疑似病例调查表06-08
当代世界政治经济与国际关系重点05-26
经济法基础·课后作业·第二章01-18
跟管钻进在破碎岩体中的工程应用11-14
混凝土裂缝光纤传感器的试验05-19
马原题目06-07
- 1Single-Hole Hollow Polymer Microspheres toward Specific High
- 2On the Flexibility of Constraint Programming Models From Single to Multiple Time Windows fo
- 3内存扫盲(single rank,dual-rank, quad-rank)
- 4single herb granules Ginkgo Biloba Extract, Myricetin Huperzine Serrate Extract
- 5000Mechanical and thermal properties of single crystals of ZrB2
- 6Fundamentals of Single-chip Microcomputer外文文献翻译 电子信
- 7Two- and Three-Dimensional Smectic Ordering of Single-Handed Helical Polymers
- 8Two- and Three-Dimensional Smectic Ordering of Single-Handed Helical Polymers
- 9Single Transverse Spin Asymmetry in $p^uparrow p to pi X$ and $ep^uparrow to pi X$
- 10Single-chip单片机大学毕业论文外文文献翻译及原文
- 粮油储藏基础知识
- 论文范文(包括统一封面和内容的格式)
- 经典解题方法
- 综合部后勤办公用品管理办法+领用表
- 学生宿舍突发事件应急预案
- 16秋浙大《生理学及病理生理学》在线作业
- 四分比丘尼戒本(诵戒专用)
- 浙江财经大学高财题库第一章习题
- 九大员岗位职责(项目经理、技术负责人、施工员、安全员、质检员、资料员、材料员、造价员、机管员)
- 旅游财务管理习题(学生版)
- 德阳外国语高二秋期入学考试题
- 投资学 精要版 第九版 第11章 期权市场
- 控制性详细规划城市设计认识
- bl03海运提单3国际贸易答案
- 2010-2011学年湖北省武汉市武珞路中学七年级(上)期中数学试卷
- VB程序填空改错设计题库全
- 教师心理健康案例分析 - 年轻班主任的心理困惑
- 民间借贷司法解释溯及力是否适用?
- 三联书店推荐的100本好书
- 《化工原理》(第三版)复习思考题及解答
- electricity
- Mongolia
- single
- buyer
- 小学四年级英语上册Unit5
- 弹塑性波与冲击动力学-第二章
- 七年级数学上册 第一章 丰富的图形世界 1 生活中的立体图形学习指导素材 北师大版 精
- 塔城地区八年级下学期生物第一次月考试卷
- 学校晋升细则.docx
- 平原县现代农业小麦产业项目建设与管理探索
- 食品添加剂使用管理办法
- 初中数学解题技巧
- 现金盘点表和银行存款余额调节表模版
- 感情不是人生的全部,有些人经得起离开,却经不起等待
- 中国艺术研究院美术学考研参考书整理
- 2012年销售目标制定依据及重点关注工作(评审版)111209
- 热泵干燥技术在脱水蔬菜加工中的应用与问题分析
- 教学楼供配电设计
- 科技与生活
- 了解你的客户——思考7个问题
- 第五课 杨宪益译文赏析
- 学校教学常规管理制度
- 黑龙江省齐齐哈尔市高一上学期数学期中(奥赛班)试卷
- 2015药典凡例