PMP 报名项目经验描述模板

更新时间:2023-04-06 16:40:01 阅读量: 教育文库 文档下载

说明:文章内容仅供预览,部分内容可能不全。下载后的文档,内容与下面显示的完全一致。下载之前请确认下面内容是否您想要的,是否完整无缺。

v1.0 可编辑可修改

一.

To realize the equipment life cycle management, optimize the equipment utilization.

IN: Develop project scopes and objectives; write the bidding document. PL: Open tender; design the system architecture; make project plan. EX: Demand investigation; system detailed design; time control; check whether the system functions to meet the needs of users.

MC: Feedback problem; risk management.

CL: Check the archiving documents; complete the online test run and final acceptance.

Project activities: Project completed on schedule. Meet user needs.

二.

Project objective: Implement a new website to trace the vendors’ working hours and generate the monthly report.

IN: Define the project scope; Identify risks;

obtain approval from stakeholders.

PL: Prepare the project plan and develop the work

breakdown structure.

EX: Manage physical move; Manage communication.

MC: Hold daily stand-up meeting; Manage changes to scope, schedule. CL: Final acceptance from customer; Deliver

trainings; Archive the documents.

Production issues are fixed in time. Functions

1

v1.0 可编辑可修改added. No budget exceed.

三.

The goal of the project is to provide solutions for solar thermal

power control system.

IN: Identify stakeholders of the project and analyze the different needs of stakeholders.

PL: Determine the team members, establish a incentive mechanism,

identify and evaluate risks.

EX: Ensure project delivered on time. Manage changes, measure performance.

MC: Monitor project quality according to

national and industry standards.

CL: Sum up the project experience, sorting of the

project completion data.

The project has been highly recognized by the

customers.

2