国外1.5MW风力发电机的低电压穿越技术资料

更新时间:2023-04-14 03:48:01 阅读量: 实用文档 文档下载

说明:文章内容仅供预览,部分内容可能不全。下载后的文档,内容与下面显示的完全一致。下载之前请确认下面内容是否您想要的,是否完整无缺。

SF-021 1.5MW LVRT Test

Document:SF-021

Page 1 of 10

1.5MW LVRT Test

Rev A

Date of Release

SF-021 1.5MW LVRT Test

Document:SF-021

Page 2 of 10

100 Materials

New materials are needed to upgrade the turbine:

SF-021

1.5MW LVRT Test

Document:SF-021

Page 3 of 10 101 Tools

Be sure to prepare all needed tools for turbine upgrading, tools listed below must be included.

SF-021 1.5MW LVRT Test

Document:SF-021

Page 4 of 10

102

LVRT Upgrading

SF-021 1.5MW LVRT Test

Document:SF-021

Page 5 of 10

SF-021 1.5MW LVRT Test

Document:SF-021

Page 6 of 10

SF-021 1.5MW LVRT Test

Document:SF-021

Page 7 of 10

103 400V test

SF-021

1.5MW LVRT Test

Document:SF-021

Page 8 of 10 104 Developing test

According to the site situation perform the developing test, and record all the problems we have met in the

SF-021 1.5MW LVRT Test

Document:SF-021

Page 9 of 10

SF-021 1.5MW LVRT Test

Document:SF-021

Page 10 of 10

105 Formal test

本文来源:https://www.bwwdw.com/article/bhyq.html

Top