生活垃圾及粪便无害化处理工程项目可行性研究报告
更新时间:2024-06-07 10:06:02 阅读量: 综合文库 文档下载
Gay is now a provincial key construction project of aluminum Ltd---province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he haoverall responsibility for the day-to-day affairs of the project. In order to ensure that southern company's \e of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation,\oal. He and Engineering Department under the leadership of all the staff in the company's technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. echnical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry's fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other buildingmaterials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good ...
生活垃圾及粪便无害化处理工程项目
可行性研究报告
Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department speech contest, failed to get a good result, but also actively cooperate with the Department and class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom again. For the class out of a force. In the event we, many projects did not get the desired results. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the Department, thanks to instructor teacher's good, proper guidance, thanks to 46 students in the class will work closely together, to work together. Of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achieving greater results. Five declarations of good party branch \branch is a fortress, a party member is a banner\hting in the railway engineering construction Group Headquarters Headquarters branches, a total of members 18. Role of the Xiang-GUI railway and tight South Lebanon railway, heavy, poor conditions of disadvantage, the branch closely around the construction work. Holding high the flag of our party members, unite and lead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all levels. Since October last year since the project began, Headquarters Branch is tightly around the center of its activities. Face South, climate is wet, sooner or later temperature larger, specific difficult, I branch from thought requirements all workers active motivated, do can long-term hard, dare fight of spirit prepared, while requirements all members lead, encouraged colleagues Zhijian each other help, each other learning business knowledge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortress role and members of pioneer model role. Since its start, I command under the correct leadership of the party branch in the Group and the superior party, centering on building a qualified party branches, branch of the forts and the battle to play the exemplary vanguard role of party members, actively working. In command personnel less, and task heavy of situation Xia, all members always according to \r, and style to are, and service better, and efficiency to high\better to completed has production organization, and coordination, and guarantees and the management work, in engineering progress, and quality, and benefits, and safety, aspects are made has good of results, get has owners and the Group and grass-roots units of praise. First, givefull play to the exemplary role of party members. The exemplary role of party members and cadres are silent on the command, the exemplary role of party members and cadres are the best of the ideological and political education. We pay close attention to party building, requires political party members and cadres must take the lead in learning, set strict demands on themselves, ...Gay is now a provincial key construction project of aluminum Ltd---province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern company's \e of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation,\oal. He and Engineering Department under the leadership of all the staff in the company's technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. echnical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry's fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other buildingmaterials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumpton can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good ...前 言
城市生活垃圾卫生填埋是实现垃圾无害化处理、解决城市垃圾出路的方式之一,填埋场的建设能够解决城市生活垃圾的消纳问题,同时能够改善城市居民生活质量和投资环境。同时,由于近年来农村对粪便的需求量逐渐减少,粪便出路问题也日益严峻,由于粪便含水率较高,无法直接填埋,因此本工程拟配套建设一座粪便预处理站,对全县产生的粪便进行预处理。
受某城置业有限公司及XX县城管局的委托,我院编制了XX县某生活垃圾及粪便无害化处理工程可行性研究报告。经过现场踏勘、基础资料的调查与分析,我院内部多次研讨,并与相关单位及有关部门多次交换意见,于2009年4月提交本报告。
经过对项目建设的必要性、建设内容、处理工艺、工程投资、运行成本等进行初步分析,结果如下:
1. 建设本项目对促进社会经济可持续发展,提高垃圾运输效率,减少垃圾及粪便处理对周围环境的影响,因此本项目的建设是十分必要的。
2. 拟建XX县垃圾填埋场位于XX镇XX社区北侧1000m,原水务局黄砂矿场,占地225亩;填埋区库容为118.3万m3,设计使用年限为11.5年,平均填埋量为250t/d;填埋场采用人工双层衬里水平防渗系统;产生的渗沥液采用MBR+RO法进行处理,出水水质达到《生活垃圾填埋场污染控制标准》(GB16889-2008)之渗沥液特别排放限值后,就近排入附近水体;填埋气体通过封闭式火炬点燃排放。
Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department speech contest, failed to get a good result, but also actively cooperate with the Department and class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom again. For the class out of a force. In the event we, many projects did not get the desired results. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the Department, thanks to instructor teacher's good, proper guidance, thanks to 46 students in the class will work closely together, to work together. Of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achieving greater results. Five declarations of good party branch \branch is a fortress, a party member is a banner\hting in the railway engineering construction Group Headquarters Headquarters branches, a total of members 18. Role of the Xiang-GUI railway and tight South Lebanon railway, heavy, poor conditions of disadvantage, the branch closely around the construction work. Holding high the flag of our party members, unite and lead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all levels. Since October last year since the project began, Headquarters Branch is tightly around the center of its activities. Face South, climate is wet, sooner or later temperature larger, specific difficult, I branch from thought requirements all workers active motivated, do can long-term hard, dare fight of spirit prepared, while requirements all members lead, encouraged colleagues Zhijian each other help,each other learning business knowledge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortress role and members of pioneer model role. Since its start, I command under the correct leadership of the party branch in the Group and the superior party, centering on building a qualified party branches, branch of the forts and the battle to play the exemplary vanguard role of party members, actively working. In command personnel less, and task heavy of situation Xia, all members always according to \r, and style to are, and service better, and efficiency to high\better to completed has production organization, and coordination, and guarantees and the management work, in engineering progress, and quality, and benefits, and safety, aspects are made has good of results, get has owners and the Group and grass-roots units of praise. First, givefull play to the exemplary role of party members. The exemplary role of party members and cadres are silent on the command, the exemplary role of party members and cadres are the best of the ideological and political education. We pay close attention to party building, requires political party members and cadres must take the lead in learning, set strict demands on themselves, ... Gay is now a provincial key construction project of aluminum Ltd---province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern company's \ontrol the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation,\and Engineering Department under the leadership of all the staff in the company's technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. echnical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry's fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in October had reached 93%, is close to and reach thedomestiadvanced level. In he case of production halfof the cell, his effect can be achieved and better level in he industry. 50,000 ons of electrolytic modification process, from preliminary study to equipment selection, cost control, projectprogress, quality control and coordination among the various sub-projects and arious professional, technical command under the correct leadership, both from an overall perspective, mphasis on integrity, and earnestly implement therelevant aws and regulations, strictly act according o the contract. Hetried to earn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system n place, with all units involved with the coordination and good ...前言
3. 粪便预处理站位于填埋场内,设计规模为100 t/d,采用粗格栅+细格栅和除砂系统工艺。分离产生的粪渣由输送机输送到出渣间,运往垃圾填埋场进行填埋,上清液排入污水处理厂进入后续处理。 4. 本工程总投资及运行成本如下:
工程总投资为8802.70万元,其中第一部分投资为7064.00万元。本工程垃圾填埋单位成本为119.81元/吨垃圾,经营成本为43.51元/吨垃圾;粪便预处理单位成本为32.53元/吨粪便,单位经营成本为18.30元/吨粪便。
在编制过程中,得到了XX县城管局、某城置业有限公司及XX县规划、环保等部门的大力协助,在此谨致谢意!
Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department speech contest, failed to get a good result, but also actively cooperate with the Department and class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom again. For the class out of a force. In the event we, many projects did not get the desired results. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the Department, thanks to instructor teacher's good, proper guidance, thanks to 46 students in the class will work closely together, to work together. Of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achieving greater results. Five declarations of good party branch \branch is a fortress, a party member is a banner\hting in the railway engineering construction Group Headquarters Headquarters branches, a total of members 18. Role of the Xiang-GUI railway and tight South Lebanon railway, heavy, poor conditions of disadvantage, the branch closely around the construction work. Holding high the flag of our party members, unite and lead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all levels. Since October last year since the project began, Headquarters Branch is tightly around the center of its activities. Face South, climate is wet, sooner or later temperature larger, specific difficult, I branch from thought requirements all workers active motivated, do can long-term hard, dare fight of spirit prepared, while requirements all members lead, encouraged colleagues Zhijian each other help,each other learning business knowledge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortress role and members of pioneer model role. Since its start, I command under the correct leadership of the party branch in the Group and the superior party, centering on building a qualified party branches, branch of the forts and the battle to play the exemplary vanguard role of party members, actively working. In command personnel less, and task heavy of situation Xia, all members always according to \r, and style to are, and service better, nd efficiency to high\better to completed has production organization, and coordination, and guarantees and the management work, in engineering progress, and quality, and benefits, and safety, aspects are made has ood of results, get has owners and the Group and grass-roots units of praise. First, givefull play to the exemplary role of party members. The exemplary role of party members and cadres are silent on the command, the exemplary role of party members and cadres are the best of the ideological and political education. We pay close attention to party building, requires political party members and cadres must take the lead in learning, set strict demands on themselves, ...泗洪县重岗山生活垃圾及粪便无害化处理工程可行性研究报告 目录 目 录
前 言.............................................................. I 目 录............................................................. i 第一章 建设管理机构............................................... 1
1.1 建设机构 .................................................... 1 1.2 管理机构 .................................................... 1 第二章 项目概况.................................................... 3
2.1 项目名称及业主单位 .......................................... 3 2.2 编制依据及范围 .............................................. 3 2.3 城市概况及自然条件 .......................................... 8 2.4 场地地质地形条件 ........................................... 11 2.5 生活垃圾及粪便处理现状 ..................................... 13 2.6 项目建设的可行性与必要性 ................................... 15 2.7 处理规模及使用年限 ......................................... 17 第三章 方案论证................................................... 20
3.1 填埋场场址选择 ............................................. 20 3.2 填埋库区 ................................................... 25 3.3 填埋工艺 ................................................... 39 3.4 渗沥液处理工艺 ............................................. 43 3.5 粪便预处理系统 ............................................. 50 第四章 工程设计................................................... 55
4.1 工艺设计 ................................................... 55 4.2 工艺设计 ................................................... 56 4.3 建筑设计 ................................................... 83 4.4 结构设计 ................................................... 84 4.5 电气设计 ................................................... 86 4.6 仪表及自控设计 ............................................. 88 4.7 通讯设计 ................................................... 93 4.8 通风设计 ................................................... 93 4.9 生态恢复 ................................................... 94 4.10 土方平衡 .................................................. 95 4.11 劳动安全保护 .............................................. 95 4.12 消防设计 .................................................. 97 4.13 人员配置 .................................................. 98 第五章 建设用地与拆迁补偿....................................... 100
5.1 建设地点 .................................................. 100 5.2 拆迁补偿 .................................................. 100 第六章 节能与能耗分析........................................... 101
6.1 能源能耗分析 .............................................. 101 6.2 节能措施 .................................................. 101 第七章 生态环境影响分析......................................... 103
7.1 项目实施过程中的环境影响及对策 ............................ 103 7.2 项目建成后的环境影响及对策 ................................ 106 7.3 环境监测 .................................................. 109
i
Gay is now a provincial key construction project of aluminum Ltd---province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern company's \e of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation,\oal. He and Engineering Department under the leadership of all the staff in the company's technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. echnical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry's fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other buildingmaterials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumpton can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good ...第八章 工程投资估算及资金筹措................................... 112
8.1 工程投资估算 .............................................. 112 8.2 资金筹措 .................................................. 114 8.3 成本分析 .................................................. 114 8.4 财务评价 .................................................. 117 8.5 项目经济评价结论 .......................................... 119 8.6 环境效益与社会效益 ........................................ 120 第九章 项目管理及实施计划....................................... 121
9.1 项目实施原则及步骤 ........................................ 121 9.2 项目建设管理 .............................................. 121 9.3 项目运行管理 .............................................. 122 9.4 项目实施进度 .............................................. 123 第十章 招标计划................................................. 124
10.1 招标基本情况 ............................................. 124 10.2 招标初步方案 ............................................. 124 10.3 招标内容 ................................................. 125 第十一章 主要工程量一览.......................................... 126
11.1 设备配置原则 ............................................. 126 11.2 计量设备 ................................................. 126 11.3 填埋作业设备 ............................................. 126 11.4 渗沥液处理设备 ........................................... 127 11.5 填埋气体处理设备 ......................................... 127 11.6 环境监测设备 ............................................. 127 11.7 机修设备 ................................................. 127 11.8 电气及自动控制设备 ....................................... 127 11.9 通讯设备 ................................................. 127 11.10 粪便预处理设备 .......................................... 127 11.11 其它设备 ................................................ 128 第十二章 结论与建议.............................................. 129
12.1 结论 ..................................................... 129 12.2 存在问题及建议 ........................................... 130
Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department speech contest, failed to get a good result, but also actively cooperate with the Department and class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom again. For the class out of a force. In the event we, many projects did not get the desired results. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the Department, thanks to instructor teacher's good, proper guidance, thanks to 46 students in the class will work closely together, to work together. Of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achieving greater results. Five declarations of good party branch \branch is a fortress, a party member is a banner\hting in the railway engineering construction Group Headquarters Headquarters branches, a total of members 18. Role of the Xiang-GUI railway and tight South Lebanon railway, heavy, poor conditions of disadvantage, the branch closely around the construction work. Holding high the flag of our party members, unite and lead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all levels. Since October last year since the project began, Headquarters Branch is tightly around the center of its activities. Face South, climate is wet, sooner or later temperature larger, specific difficult, I branch from thought requirements all workers active motivated, do can long-term hard, dare fight of spirit prepared, while requirements all members lead, encouraged colleagues Zhijian each other help,each other learning business knowledge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortress role and members of pioneer model role. Since its start, I command under the correct leadership of the party branch in the Group and the superior party, centering on building a qualified party branches, branch of the forts and the battle to play the exemplary vanguard role of party members, actively working. In command personnel less, and task heavy of situation Xia, all members always according to \r, and style to are, and service better, and efficiency to high\better to completed has production organization, and coordination, and guarantees and the management work, in engineering progress, and quality, and benefits, and safety, aspects are made has good of results, get has owners and the Group and grass-roots units of praise. First, givefull play to the exemplary role of party members. The exemplary role of party members and cadres are silent on the command, the exemplary role of party members and cadres are the best of the ideological and political education. We pay close attention to party building, requires political party members and cadres must take the lead in learning, set strict demands on themselves, ... 泗洪县重岗山生活垃圾及粪便无害化处理工程可行性研究报告 附件附表附图 附 件
(1)关于垃圾卫生填埋场建设项目的批复,XX县发展和改革局,2007年9月3日,洪发改[2007]128号;
(2)XX县生活垃圾填埋场选址论证会议纪要,XX县城市管理局,2009年3月25日;
(3)XX县人民政府关于县垃圾填埋场场址的批复,XX县人民政府,2009年4月9日,洪政复[2009]5号;
(4) 关于对XX县生活垃圾与粪便无害化处理项目环境影响评价报告书的批复,XX县环境保护局,2009年4月15日,洪环复[2009]29号;
(5)XX县XX垃圾填埋场场区地质调查报告,江苏省地质矿产调查研究所,2009年3月;
附 表
(1)附表01——概算汇总表
(2)附表02——垃圾填埋年运行成本计算表 (3)附表03——粪便预处理年运行成本计算表 (4)附表04——投资使用计划与资金筹措表 (5)附表05——固定资产折旧计算表 (6)附表06——项目各年运行成本费用计算表 (7)附表07——项目投资现金流量表 (8)附表08——利润与利润分配表
i
Gay is now a provincial key construction project of aluminum Ltd---province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern company's \e of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation,\oal. He and Engineering Department under the leadership of all the staff in the company's technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. echnical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry's fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other buildingmaterials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumpton can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good ...(9)附表09——财务计划现金流量表 附 图
(1)附图01——区域位置图 (2)附图02——总平面布置图 (3)附图03——高程布置图
(4)附图04——1号库区渗沥液收集系统平面布置图 (5)附图05——2号库区渗沥液收集系统平面布置图 (6)附图06——1号库区地下水收集系统平面布置图 (7)附图07——2号库区地下水收集系统平面布置图 (8)附图08——边坡及库底防渗结构图 (9)附图09——综合管理用房平面图 (10)附图10——综合管理用房立面图 (11)附图11——渗沥液处理车间平面布置图 (12)附图12——渗沥液处理工艺流程图 (13)附图13——粪便预处理车间平面图 (14)附图14——粪便预处理工艺流程图
Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department speech contest, failed to get a good result, but also actively cooperate with the Department and class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom again. For the class out of a force. In the event we, many projects did not get the desired results. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the Department, thanks to instructor teacher's good, proper guidance, thanks to 46 students in the class will work closely together, to work together. Of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achieving greater results. Five declarations of good party branch \branch is a fortress, a party member is a banner\hting in the railway engineering construction Group Headquarters Headquarters branches, a total of members 18. Role of the Xiang-GUI railway and tight South Lebanon railway, heavy, poor conditions of disadvantage, the branch closely around the construction work. Holding high the flag of our party members, unite and lead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all levels. Since October last year since the project began, Headquarters Branch is tightly around the center of its activities. Face South, climate is wet, sooner or later temperature larger, specific difficult, I branch from thought requirements all workers active motivated, do can long-term hard, dare fight of spirit prepared, while requirements all members lead, encouraged colleagues Zhijian each other help,each other learning business knowledge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortress role and members of pioneer model role. Since its start, I command under the correct leadership of the party branch in the Group and the superior party, centering on building a qualified party branches, branch of the forts and the battle to play the exemplary vanguard role of party members, actively working. In command personnel less, and task heavy of situation Xia, all members always according to \r, and style to are, and service better, and efficiency to high\better to completed has production organization, and coordination, and guarantees and the management work, in engineering progress, and quality, and benefits, and safety, aspects are made has good of results, get has owners and the Group and grass-roots units of praise. First, givefull play to the exemplary role of party members. The exemplary role of party members and cadres are silent on the command, the exemplary role of party members and cadres are the best of the ideological and political education. We pay close attention to party building, requires political party members and cadres must take the lead in learning, set strict demands on themselves, ...
第一章 建设管理机构
1.1 建设机构
“某城置业有限公司”于2008年12月成立,是某城置业有限公司为从事城市基础建设特成立的专业投资公司,主要业务范围为房地产开发、销售以及商业投资(国家禁止投资项目除外)。
某城置业有限公司成立于2004年,专业从事房地产开发和新型材料开发研究,在江苏、安徽都有自己的开发项目,所开发的新型材料业广泛用于各个领域。 1.2 管理机构 1.2.1 管理机构设置
XX县城管局为本项目的主管单位,本项目建成后,专门成立XX县垃圾填埋场管理机构,负责垃圾填埋、渗沥液处理、粪便预处理的运行管理。合理的垃圾填埋场组织机构设置可以提高管理效率,减少人员配置,降低管理及运行费用。垃圾填埋场管理机构设置如下:
泗洪县重岗山生活垃圾及粪便无害化处理场
行政部 生产部 技术部 后勤部
1
办公室 财务科 渗沥液处理 填埋作业区 粪便预处理 安全环保科 技术管理科 机电维修绿化 食 堂 Gay is now a provincial key construction project of aluminum Ltd---province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern company's \he scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation,\overall goal. He and Engineering Department under the leadership of all the staff in the company's technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. echnical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry's fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prces of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumpton can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, currentefficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good ...1.2.2 技术管理
为了使XX县某生活垃圾及粪便无害化处理工程建成后工程运行管理达到要求的处理效果、降低运行成本的目的,除了按上述的组织机构进行行政管理外,还必须加强技术管理。
(1)会同市政环保部门监督进场垃圾性质,严禁有毒有害工业固体废弃物进场。
(2)根据进场垃圾性质调整运行条件。做好日常大气及水质化验、分析及蚊虫鼠蝇生长记录,保存记录完整的各项资料。
(3)及时整理汇总、分析运行记录,建立运行技术档案。 (4)建立处理设施和设备的维护保养工作和维护记录的存档。 (5)建立信息系统,定期总结运行经验。
2
泗洪县重岗山生活垃圾及粪便无害化处理工程可行性研究报告 项目概况 第二章 项目概况
2.1 项目名称及业主单位 2.1.1 项目名称
本项目名称为:某生活垃圾及粪便无害化处理工程。 2.1.2 建设单位与主管单位
本项目的建设单位为:某有限公司。 本项目的主管单位为: 2.1.3 建设地点
建设地点:本工程位于县城新征用地约225亩。 2.2 编制依据及范围 2.2.1 编制依据
1、《XX县县城总体规划》(2004~2020年),江苏省规划设计研究院,2004年;
2、《XX县环境卫生专业规划》(2007~2020年),淮安市城市建设设计研究院有限公司,2007.11;
3、某黄砂矿场地形图,XX县规划局;
4、XX县某生活垃圾及粪便无害化处理工程地质勘察报告, 2009年1月,某市新筑艺建筑设计有限公司;
5、XX县XX垃圾填埋场场区地质调查报告,2009年3月,江苏省地质矿产调查研究所;
6、《XX县生活垃圾与粪便无害化处理项目环境影响评价报告书》及批复,2009年3月;
3
Gay is now a provincial key construction project of aluminum Ltd---province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern company's \e of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation,\oal. He and Engineering Department under the leadership of all the staff in the company's technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. echnical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry's fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other buildingmaterials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumpton can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good ...2.2.2 编制原则
(1)贯彻执行国家关于环境保护政策,按照国家颁布的有关法规、规范及标准进行建设。
(2)工程的建设必须遵循统一规划、合理布局、因地制宜、综合开发、配套建设的原则。
(3)工程的建设采用技术先进、安全可靠、适应性强、经济合理、投资省、并与国内类似工程相一致的工艺、材料与设备。材料与设备选型应采用质量可靠、经济合理的国内外先进产品。
(4)工程设计执行《生活垃圾卫生填埋技术规范》(CJJ17-2004),《生活垃圾填埋场污染控制标准》(GB16889-2008)等国家相关规范以及某、XX地方相关规范、标准及规定。 2.2.3 编制范围
本次可行性研究报告的编制范围为XX县某生活垃圾及粪便无害化处理工程,建设内容包括:
(1)垃圾填埋库区工程,包括库区地基处理、防渗、地表水导排、渗沥液与地下水收集导排、填埋气体导排及处理、填埋作业;
(2)渗沥液处理工程:包括调节池、渗沥液处理设施; (3)粪便预处理工程:包括粪便预处理系统、上清液排放系统等;
(4)配套工程:综合管理用房、机修车间、车库、填埋作业材料堆棚、门卫、监测井、洗车场、加油站、消防水池等。
文本编制内容包括工程方案比选、推荐方案工程设计,并提出工
4
泗洪县重岗山生活垃圾及粪便无害化处理工程可行性研究报告 项目概况 程投资估算和经济评价。 2.2.4 设计规范标准
(1)《城市生活垃圾卫生填埋技术规范》(CJJ17-2004) (2)《生活垃圾填埋场污染控制标准》(GB16889-2008) (3)《生活垃圾卫生填埋场防渗系统工程技术规范》(CJJ 113-2007)
(4)《生活垃圾填埋场无害化评价标准》(CJJ/T 107-2005) (5)《生活垃圾填埋场环境监测要求》(GB/T 18772-2002) (6)《生活垃圾卫生填埋场环境监测技术标准》(CJ/T 3037) (7)《聚乙烯(PE)土工膜防渗工程技术规范》(SL/T231-98) (8)《土工合成材料应用技术规范》(GB50290-98) (9)《垃圾填埋场用高密度聚乙烯土工膜》(CJ/T234-2006) (10)《城市生活垃圾卫生填埋场运行维护技术规程》(CJJ93-2003)
(11)《城市生活垃圾卫生填埋处理工程项目建设标准》建标【2001】101号;
(12)《工业企业设计卫生标准》(GBZ1-2002) (13)《恶臭污染物排放标准》(GB14554-93) (14)《室外给水设计规范》(GB50013-2006) (15)《室外排水设计规范》(GB50014-2006) (16)《建筑给水排水设计规范》(GB50015-2003) (17)《城镇污水处理厂污染物排放标准》(GB18918-2002)
5
Gay is now a provincial key construction project of aluminum Ltd---province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern company's \e of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation,\oal. He and Engineering Department under the leadership of all the staff in the company's technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. echnical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry's fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other buildingmaterials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumpton can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good ...(18)《民用建筑设计通则》(GB50352-2005) (19)《办公建筑设计规范》(JGJ67-2006) (20)《公共建筑节能设计标准》(GB50189-2005 ) (21)《汽车库建筑设计规范》(JGJ100-98) (22)《建筑结构荷载规范》(GB50009-2001) (23)《混凝土结构设计规范》(GB50010-2002) (24)《建筑地基基础设计规范》(GB50007-2002)
(25)《给水排水工程构筑物结构设计规范》(GB50069-2002) (26)《建筑结构可靠度设计统一标准》(GB50068-2001) (27)《建筑抗震设计规范》(GB50011-2001)(2008年版) (28)《混凝土结构设计规范》(GB50010-2002) (29)《碾压式土石坝设计规范》(SL274-2001) (30)《建筑边坡工程技术规范》(GB50330-2002) (31)《工程建设标准强制性条文》(城市建设部分) (32)《砌体结构设计规范》(GB 50003-2001) (33)《砌体工程施工质量验收规范》(GB 50203-2002) (34)《建筑设计防火规范》(GB50016-2006)
(35)《建筑内部装修设计防火规范》(GB50222-95,2001年版) (36)《采暖通风与空气调节设计规范》(GB50019-2003) (37)《夏热冬冷地区建筑节能设计标准》(JGJ134-2001) (38)《城市防洪工程设计规范》(CJJ50-92) (39)《防洪标准》(GB 50201-94)
6
泗洪县重岗山生活垃圾及粪便无害化处理工程可行性研究报告 项目概况 (40)《建筑物防雷设计规范》 (GB50057-94)(2004年版) (41)《火灾自动报警系统设计规范》(GB50116-98) (42)《建筑灭火器配置设计规范》(GBJ140-2005)
(43)《低倍数泡沫灭火系统设计规范》(GB50151-92)(2001年版)
(44)《供配电系统设计规范》(GB50052-95) (45)《低压配电设计规范》(GB50054-95)
(46)《工业自动化仪表工程施工及验收规范》(GB50093-2002) (47)《自动化仪表工程施工质量验收规范》(GB50131-2007) (48)《仪表系统接地设计规定》(HG/T20513-2000) (49)《仪表供电设计规定》(HG/T20509-2000) (50)《仪表配管、配线设计规定》(HG/T20512-2000) (51)《厂矿道路设计规范》(GBJ22-87) (52)《公路路基设计规范》(JTG D30-2004)
(53)《公路水泥混凝土路面设计规范》(JTGD40-2002) (54)《生产过程安全卫生要求总则》(GB12801-91) (55)《市容环境卫生术语标准》(CJJ/T65-2004) (56)《城市环境卫生设施规划规范》(GB 50337—2003) (57)《城镇环境卫生设施设置标准》(CJJ 27—2005 ) (58)《城市粪便处理厂(场)设计规范》(CJJ64-95) (59)《城市粪便处理厂运行、维护及其安全技术规程》(CJJ/T30-1999)
7
Gay is now a provincial key construction project of aluminum Ltd---province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern company's \e of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation,\oal. He and Engineering Department under the leadership of all the staff in the company's technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. echnical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry's fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other buildingmaterials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumpton can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good ...其它有关市政、环卫、水利、给排水、建筑、结构、电气、自控等工程设计的最新技术标准和规范。 2.3 城市概况及自然条件 2.3.1 城市概况
XX县位于江苏西部,淮河中游,洪泽湖西岸。县域总面积2729.6平方公里,居全省县级最大之一(数第二),辖26个乡镇场。县人民政府驻XX镇。
XX历史悠久,人杰地灵。是人类祖先的发源地之一,早在五万年前下草湾人就在此繁衍生息。西周时为徐国中心,南北文化交汇处,与中原文化、吴越文化、楚文化相互渗透、融合,形成璀璨夺目的古徐国文化之主体。后为泗州本州。境内分布着吕布猿门射戟台、鲁肃故里子敬泉、隋朝开凿的通济渠等古迹名胜。抗战时期是淮北抗日民主根据地的中心,淮北苏皖边区党委、行政公署、新四军四师师部均驻于此。彭雪枫、江上青等3000多位烈士长眠于此。
XX物产丰饶,生态优越。现有耕地206万亩,水面166万亩,辖烟波浩淼、日出斗金的洪泽湖48%的水面,湖岸线165公里,可开发滩涂50万亩。拥有省级洪泽湖湿地自然保护区和亚洲最大的美洲黑杨种质资源库,是中国螃蟹之乡、全国水产百强县、生态示范县、商品粮基地县、平原绿化先进县。双沟、分金亭、双洋三大名酒享有盛誉,金水牌洪泽湖大闸蟹、蟹园牌无公害大米等特色产品畅销大江南北。地下蕴藏有石英砂、金刚石、铁锰矿、天然矿泉水等矿产资源。 XX物产丰饶,生态优越。现有耕地206万亩,水面166万亩,辖
8
泗洪县重岗山生活垃圾及粪便无害化处理工程可行性研究报告 项目概况 烟波浩淼、日出斗金的洪泽湖48%的水面,湖岸线165公里,可开发滩涂50万亩。拥有省级洪泽湖湿地自然保护区和亚洲最大的美洲黑杨种质资源库,是中国螃蟹之乡、全国水产百强县、生态示范县、商品粮基地县、平原绿化先进县。双沟、分金亭、双洋三大名酒享有盛誉,金水牌洪泽湖大闸蟹、蟹园牌无公害大米等特色产品畅销大江南北。地下蕴藏有石英砂、金刚石、铁锰矿、天然矿泉水等矿产资源。洪泽湖百里生态旅游风光带景色怡人,美不胜收。
XX区位良好,交通便捷。位于某、徐州两大都市圈交汇处,宁宿徐高速公路纵贯南北,至某不到2小时,到徐州观音机场仅需1小时。境内河道纵横,水路畅通,经洪泽湖可通江达海。县工业园区设施完善,功能齐全,已有46家企业进入园区,32家企业建成投产。近年来,XX坚持工业化、城市化、农业产业化三化并举,经济社会快速发展,城乡面貌日新月异。形成了食品、机械、化工、建材、纺织、印刷等工业支柱行业,水产、林木、瓜果、蚕桑、蔬菜、畜禽等农业主导产业初具规模,城市、交通、通讯等基础设施建设突飞猛进,服务环境不断优化。
2007年,县城总体规划面积283平方公里,控制性详规面积30平方公里,建成区面积28平方公里,详规覆盖率达100%;城区绿化面积983万平方米,绿化覆盖率达37.6%;城市化水平达35.2%。城区人口23万。 2.3.2 自然条件 2.3.2.1地貌
9
Gay is now a provincial key construction project of aluminum Ltd---province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern company's \e of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation,\oal. He and Engineering Department under the leadership of all the staff in the company's technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. echnical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry's fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other buildingmaterials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumpton can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good ...XX县位于苏北平原西部,洪泽湖西岸,地理坐标为北纬33°08'-33°44',东经117°56'-118°46',县境南北最大纵距69.1公里,东西最大横距78.2公里。XX县境内地形以平原、岗地为主,亦有零星丘陵,岗、坡、平、洼蜿蜒交错,地形起伏,形如姜状。西南和西部有零星残丘蛰伏于宽广岗地之上,北部为黄泛平原,南部和西南部为岗地与平原相间排列地形。总地势是西南、西部高,东南、南部低,最高点海拔62.8米,最低点海拔12.1米。
XX县境内主要河流有淮河、怀洪新河、新汴河、濉河、汴河、徐洪河、民便河等,都从西北向东南流入洪泽湖。 2.3.2.2气象
XX县属于北暖温带半湿润季风气候区,四季分明,多年平均气温在14℃,历年最高气温40.2℃,最低气温-16.1℃,最热月份在7~8月份,最冷月份1~2两个月。年平均日照总时2291.6小时。多年平均降水量839.4mm,最大年降水量为1297.0mm,最小年降水量500.6mm。夏季多东南风,冬季多西北风。最大堆雪厚度为25cm,最大冻结深度为24cm。 2.3.2.3 地震
该区域地质构造主要为断裂构造,由新华夏系和北西向断裂构造组成,主要有郯庐断裂带以及海---泗断裂带,该区域有多条北西向次一级断裂。
根据《中国地震动参数区划图》(GB18306-2001),本地区地震基本烈度为7度。基本地震加速度值为0.15g,地震反应谱特征周期
10
泗洪县重岗山生活垃圾及粪便无害化处理工程可行性研究报告 项目概况 为0.35S。
2.4 场地地质地形条件 2.4.1 工程地质条件
拟建场址位于XX县XX镇XX社区以北水泥路东测,场地西侧为原XX县水务局黄砂厂废弃空地,东侧大部分为废弃采矿坑,积水较多,场地地势起伏较大;根据江苏省徐淮地区第四纪地质资料,场区基岩埋深大于3~50米。
1、西侧配套工程区
地质勘察报告显示,配套工程区地基土自上而下可分为③层,各层土的工程地质特征如下:
①层:耕植土,褐灰色,局部含植物根系,土质松散,成份较杂; 该层厚度0.50~2.30米,平均值1.03米;层底标高42.09~51.30米;层底埋深0.50~2.30米。
②层:粘土夹砂,褐黄色~粽红色,可塑~硬塑,光滑,稍湿~湿,含铁锰结核、钙质结核,干强度高,韧性高;含水率14.8~36.5%,a1-2=0.22~0.38mpa-1,中压缩性土;压缩模量ES=4.80~7.23mpa。该层厚度0.70~4.90米,平均值2.32米;层底标高39.09~50.40米;层底埋深1.20~5.60米。
③层:中砂夹砾砂等,灰黄色,密实,湿,摇振反应中等,场区普遍分布;含水率16.0~21.5%,a1-2=0.15~0.19mpa-1,中压缩性。本次勘察钻探时最大孔深20.00米,未穿透该层。
2、东侧填埋区
11
Gay is now a provincial key construction project of aluminum Ltd---province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern company's \e of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation,\oal. He and Engineering Department under the leadership of all the staff in the company's technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. echnical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry's fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other buildingmaterials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumpton can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good ...东侧填埋区在钻孔深度控制范围内,填埋区地基土自上而下可分为③层,各层土的工程地质特征如下:
①层:素填土,主要以粘性土为主,局部夹少量中粗砂、砾砂等。黄褐色~褐黄色,软塑,场区普遍分布;厚度0.50~9.60m,平均3.92m;层底标高20.55~32.42m,平均27.25m;层底埋深0.50~9.60m,平均3.92m。
②层:粘土夹中砂、砾砂等,褐黄色~粽红色,可塑,光滑,稍湿~湿,含少量铁锰结核,中压缩性,场区普遍分布;厚度1.00~13.00m,平均5.12m;层底标高14.00~29.65m,平均22.33m;层底埋深1.50~17.50m,平均9.14m。
③层中砂夹砾砂、角砾等:灰黄色,密实,湿,摇振反应中等,中压缩性土,场区普遍分布,中压缩性。该层未穿透。 2.4.2 地下水
场区地下水分布为第四纪孔隙潜水—上层滞水,地下初见水位埋深在钻探时自然地面下约6.0米,稳定水位埋深在钻探时自然地面下约6.50米;主要接受大气降水及人工废水补给,通过蒸发及顺流排泄,地下水位随季节降水量而变化。一般在雨季到来之前的5月上旬~6月中旬达到最低点,6月下旬以后,随着雨季的到来,水位开始回升,至7~9月份降雨高峰季节孔隙水位达到高点。根据地方资料,本区多年平均降水量约915毫米左右,最高年份降水量1373毫米,最低年份降水量531毫米;近期地下水位最高时约5.0米,最低时约8.0米,年变幅约2.50米。
12
正在阅读:
热和能单元复习学案12-20
2018年中国高尔夫球车行业分析报告-市场运营态势与发展前景预测(目录)09-06
未来的我是名好医生作文800字06-28
16秋浙大《护理心理学(乙)》在线作业11-14
第7课时 回顾与整理—三位数乘两位数 台儿庄 田仲粉11-12
ChemWindow6.0在3D分子模型绘制中的应用03-15
民航“十二五”规划调整机场建设重点05-23
苏教版三年级数学上册期末归类复习406-11
电子商务实务复习题-选择判断05-13
- 多层物业服务方案
- (审判实务)习惯法与少数民族地区民间纠纷解决问题(孙 潋)
- 人教版新课标六年级下册语文全册教案
- 词语打卡
- photoshop实习报告
- 钢结构设计原理综合测试2
- 2014年期末练习题
- 高中数学中的逆向思维解题方法探讨
- 名师原创 全国通用2014-2015学年高二寒假作业 政治(一)Word版
- 北航《建筑结构检测鉴定与加固》在线作业三
- XX县卫生监督所工程建设项目可行性研究报告
- 小学四年级观察作文经典评语
- 浅谈110KV变电站电气一次设计-程泉焱(1)
- 安全员考试题库
- 国家电网公司变电运维管理规定(试行)
- 义务教育课程标准稿征求意见提纲
- 教学秘书面试技巧
- 钢结构工程施工组织设计
- 水利工程概论论文
- 09届九年级数学第四次模拟试卷
- 无害化
- 粪便
- 工程项目
- 可行性
- 研究报告
- 垃圾
- 处理
- 生活
- 近五年有关小学语文朗读教学文献综述
- 物理化学习题七章 电化学
- 2018年春部编人教版八年级语文下单元期中期末考试试卷及答案解析
- 水彩画中的留白--以我的毕业创造为例 - 图文
- 电路理论复习题及答案
- 论广东省旅游业发展趋势
- 英语作文请假条(精选多篇)
- 芗城第二实验小学庆趣味六一(修订)
- 社会实践活动先进个人申报表
- 中资公司常驻伊朗代表处
- 稻瘟病实际操作标准及国家标准
- 部编版小学一年级语文下册单元三识字5.动物儿歌教案1
- KB复旦年新闻学新闻实务真题
- 大学物理力学试题 (1)
- 机械基础复习题总
- 八年级文言文总结一
- 精品解析:【全国省级联考】河南省中原名校2018届高三高考预测金
- 《公路工程机械化施工与管理》B
- QJZ1-400低压智能馈电开关技术协议1
- 爱国爱教