PSW_零件提交保证书模板
更新时间:2023-08-27 23:40:01 阅读量: 教育文库 文档下载
一款带中文翻译标注的零件提交保证书模板
Part Submission WarrantPart Name Shown on Drawing Number Engineering Change Level Additional Engineering Changes Safety and/or Government Regulation Checking Aid Number Yes No Purchase Order No. Cust. Part Number Supplier Part Number Dated Dated Weight (kg) Dated
Checking Aid Eng. Change Level CUSTOMER SUBMITTAL INFORMATION
ORGANIZATION MANUFACTURING INFORMATION
Organization Name & Supplier/Vendor Code
Customer Name/Division
Street Address
Buyer/Buyer Code
City
Region
Postal Code
Country
Application
MATERIALS REPORTING Has customer-required Substances of Concern information been reported? Submitted by IMDS or other customer format: Are polymeric parts identified with appropriate ISO marking codes? REASON FOR SUBMISSION (Check at least one) Initial submission Engineering Change(s) Tooling: Transfer, Replacement, Refurbishment, or additional Correction of Discrepancy Tooling Inactive > than 1 year REQUESTED SUBMISSION LEVEL (Check one) Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report) submitted to customer. Level 2 - Warrant with product samples and limited supporting data submitted to customer. Level 3 - Warrant with product samples and complete supporting data submitted to customer. Level 4 - Warrant and other requirements as defined by customer. Level 5 - Warrant with product samples and complete supporting data reviewed at organization's manufacturing location. SUBMISSION RESULTS The results for dimensional measurements material and functional tests Yes NO appearance criteria statistical process package These results meet all design record requirements: Mold / Cavity / Production Process DECLARATION I affirm that the samples represented by this warrant are representative of our parts, which were made by a process that meets all Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples were produced at the production rate of 60PCS/1 hours. I also certify that documented evidence of such compliance is on file and available for your review. I have noted any deviation from this declaration below. EXPLANATION/COMMENTS: Is each Customer Tool properly tagged and numbered? Organization Authorized Signature Print Name Title Phone No. E-mail FOR CUSTOMER USE ONLY (IF APPLICABLE) PPAP Warrant Disposition: Customer Signature Print Name Customer Tracking Number (optional) Approved Rejected Other Date Yes No n/a Date Fax No. (If "NO" - Explanation Required) Change to Optional Construction or Material Sub-Supplier or Material Source Change Change in Part Processing Parts produced at Additional Location Other - please specify Yes No n/a Yes No n/a
正在阅读:
PSW_零件提交保证书模板08-27
EDA-D触发器的设计02-26
毕业论文----国际贸易方式的类型和影响因素及对策 国贸094 李倩 -10-12
最炫民族风舞蹈串词02-20
仓库管理员年终个人工作总结多篇精编08-02
(2)施工组织设计 - 图文04-17
国家体育场钢结构设计优化方案05-13
钢筋混凝土梁两种常用加固方法的比较06-06
水上钢栈桥施工方案—已审批05-25
顶管施工技术研究10-10
- exercise2
- 铅锌矿详查地质设计 - 图文
- 厨余垃圾、餐厨垃圾堆肥系统设计方案
- 陈明珠开题报告
- 化工原理精选例题
- 政府形象宣传册营销案例
- 小学一至三年级语文阅读专项练习题
- 2014.民诉 期末考试 复习题
- 巅峰智业 - 做好顶层设计对建设城市的重要意义
- (三起)冀教版三年级英语上册Unit4 Lesson24练习题及答案
- 2017年实心轮胎现状及发展趋势分析(目录)
- 基于GIS的农用地定级技术研究定稿
- 2017-2022年中国医疗保健市场调查与市场前景预测报告(目录) - 图文
- 作业
- OFDM技术仿真(MATLAB代码) - 图文
- Android工程师笔试题及答案
- 生命密码联合密码
- 空间地上权若干法律问题探究
- 江苏学业水平测试《机械基础》模拟试题
- 选课走班实施方案
- 保证书
- 零件
- 提交
- 模板
- PSW
- 连锁酒店客房使用表格
- Making Friends 原文及翻译高二下新世纪英语课文
- 温度传感器论文--杨双卉
- 《开学第一节音乐课》教学设计
- 化学中考复习--氧气空气微粒
- 广东省韶关市乳源瑶族自治县红云中学八年级数学上月考试卷
- 实验三 嵌入式Linux开发环境的搭建
- 河南省2010年度注册会计师任职资格检查第二批公告人员名单
- 2009-2010年时间频率计量标准器具市场研究及预测报告
- 3总结
- 电动单梁桥式起重机安装施工方案
- 前期介入物业方案
- 平面广告设计与制作(3)
- 万载县国防经济动员和保障预案
- ——梅特勒-托利多智能传感器管理系统
- 十二生肖英文故事1
- 2015届高三一轮复习生长素的发现及生理作用
- 2015年北京房山初三一模英语试题及答案(word版)
- 入职员工档案登记表
- 高中物理 经典习题及答案 选修3-5