房建施工总承包项目机电的管理

摘要:房建施工总承包项目机电管理在房建这项大工程中占有越来越重要的地位,它的成败不仅体现着施工承包企业的管理水平,对项目承包商是否履约也是一重要的考核指标。然而,目前我国的的房建施工项目机电承包的管理水平较低。因此,本文对我们现阶段的房屋施工总承包项目机电的管理现状中存在的问题做一个简要的分析,然后再针对出现的问题提出相应的解决办法,希望能为相关的工作管理人员提供一些参考意见。

关键词:房建施工; 总承包项目; 机电管理

Abstract: the fittest construction contract project management in the fittest mechanical and electrical engineering plays more and more important in the position, it not only embodies the success or failure of the construction enterprise management level, on a project contractor performance is also a important whether the evaluation index. However, at present our country the construction project of the fittest of mechanical and electrical contracting management level is low. Therefore, in this paper the present stage of our housing construction contract project mechanical and electrical present situation of the management of the problems existing in a brief analysis, then the problem put forward relevant measures, the hope can the work related to the management personnel to provide some Suggestions.

Keywords: fittest construction; Overall contracts; Mechanical and electronic management

近年来,我国的科技不断迅猛发展,房建项目机电的功能也不断创新,取得了一个又一个新的发展和突破。项目机电的工程造价在房建施工总承包项目中所占的比例已经逐渐超过了了土建部分。我们知道,在房建施工总承包项目中,最主要的责任主体是总承包单位,而项目机电的管理是贯穿于整个总承包项目中,是其中不可或缺的一环,对房间施工总承包项目的成败起着十分关键的作用。目前我国的房屋施工中的项目机电管理状况不容乐观,存在着很多急需解决的问题,影响着我国房建工程的健康顺利发展。这些问题主要体现在以下几个方面

一、 房建施工总承包项目机电管理存在的问题

总的来看我国现阶段房建施工总承包项目机电的管理中存在着以下三个方面的问题。一是合同界面工作管理的混乱,二是设计方面的深度不够,三是质量与进度方面的问题。下面本文将对这三方面进行具体的分析。