1.公司决定外包其技术支持中心。在一个概念项目验证后,许多用户抱怨沟通不畅,因此公司终止该项目并外包支持中心。
这项决定的驱动因素是什么?
A.验收测试
B.产品审查
C.阈值控制界限
D.客户反馈
2.In a virtual organization, what should be done to manage the flow of project information during the planning stage?
A. Develop a structured communications management plan
B. Establish a formal channel for communications
C. Assemble a team of people that work in the same time zone.
D. Review lessons learned form previous virtual project
2.在一个虚拟组织中,应事先完成下列哪一项来管理规划阶段的项目信息流?
A.制定结构化的沟通管理计划。
B.制定正式的沟通渠道。
C.组建一支在相同时区工作的人员团队。
D.审查过往虚拟项目的经验教训。
3.A project by ineffective weekly team meetings. Some more vocal team members are turning the meetings into lengthy discussions of areas they view as problematic.
To improve the meetings' effectiveness, what should the project manager do?
A.Increase the length of the meetings.
B.Exclude the more vocal team members from the meetings.
C.Ensure that no team members' feelings are hurt.
D.Set clear agendas with specific time limits for each item.
3.项目经理对无效率的团队周会感到失望。一些发言更为积极的团队成员都将会议转向他们认为有问题的领域进入长时间的讨论。
若要提高会议的效率,项目经理应该怎么做?
A.增加会议时间。
B不让发言更为积极的团队成员参加会议。
C.确保没有团队成员感觉受到伤害。
D.设定明确的议程,为每个事项限制具体的时间。
4.A consultant informs the project manager that an internal customer resource is working on the project and wants to be informed of project status. What document should be updated?
3e1d055353e79b89680203d8ce2f0066f4336464anization chart
B.Procurement contract
3e1d055353e79b89680203d8ce2f0066f4336464munications management plan
- - 总结资料
- - -
D.Meeting minutes
4.一位顾问告知项目经理,一名内部客户资源正在为项目工作,并希望获知项目状态。哪份文件应更新?
A.组织图
B.采购合同
C.沟通管理计划
D.会议记录
5.A company must develop a project management culture to survive in a changing environment. In the past, the organization’s vision was driven by the supply department. However, the supply department's vice president (VP), who is a key project stakeholder, refuses to adopt the new culture. How can alignment with this new culture be obtained?
A.Invite the VP to project meetings.
B.Speak with the VP to determine the issue s root cause.
C.Conduct coaching sessions with the VP.
D.Ask management to schedule a strategic meeting with all project stakeholders.
5.为了在不断变化的环境中生存下来,公司必须制定项目管理文化。过去,该组织的愿景主要受供应部门驱动。然而,作为关键项目相关方的供应部门副总裁却拒绝采用新文化.如何能够获得对这种新文化的一致认可?
A.邀请供应部门副总裁参加项目会议
B.与供应部门副总裁谈话,确定问题的根本原因
C.给供应部门副总裁开辅导课
D.让管理层安排一次所有项目相关方参与的战略会议
6.A team member is inconsistent with the delivery of tasks and has been late for the last three project status meetings. This impacts the project’s critical path.
What should the project manager do?
A.Speak privately with the team member.
B.Remove the team member from critical-path tasks.
C.Address the issue during the next project status meeting.
D.Ignore the issue.
6.一名团队成员不遵守任务交付时间,过去三次项目状态会议都迟到。这影响到项目关键路径。
项目经理应该怎么做?
A.与该团队成员私下谈谈
B.将该团队成员从关键路径任务上移除
C.在下一次项目状态会议上解决该问题
D.忽视该问题
7.A project manager will communicate with three community members and three internal customers. How many communication channels will the project have?
A.10
B.15
C.21
D.36
7.项目经理将与三名社区成员和三名内部客户沟通。项目将有多少个沟通渠道?
A.10
B.15
C.21
D.36
- - 总结资料
- - -
8.A project manager invites a customer to monthly meetings, but the but the customer does not always attend. What should the project manage do?
A.Continue to invite the customer.
B.Update the risk register. .
C.Escalate the issue to the project sponsor.
D.Review and update the communications management plan.
8.项目经理邀请客户参加月会,但客户不常参加。项目经理应该怎么做?
A.继续邀请客户
B.更新风险登记册
C.将该问题上报给项目发起人
D.审查并更新沟通管理计划
9.A new project includes stakeholders from various countries with different expectations. What should the project manager do to ensure that all stakeholders will be informed about the project status?
A.Develop a communications management plan.
B.Develop a project charter.
C.Develop a stakeholder register.
D.Develop a stakeholder management plan.
9.新项目包括来自不同国家、带有不同期望的相关方。若要确保所有相关方都能获得项目状态的通知,项目经理应该怎么做?
A.制定沟通管理计划
B.制定项目章程
C.制定相关方登记册
D.制定相关方管理计划
10.During a project’s implementation phase, the project manager must communicate a scope change and obtain approval from multinational key stakeholders. Which of the following communication methods should the project manager use?
A.Push communication
B.Interactive communication
C.Stakeholder communication
D.Pull communication
10.在项目实施阶段,项目经理必须沟通范围变更,并获得跨国关键相关方的批准。项目经理应采用下列哪一种沟通方法?
A.推式沟通
B.交互式沟通
C.相关方沟通
D.拉式沟通
11.Due to an internal organizational. Restructure. The deliverables of key strategic projects are substantially delayed. The organization’s CEO is surprised to learn this.
What should the project manager have done to avoid this?
- - 总结资料
- - -
A. Reprioritized impacted projects ’
B. Defined a communications management plan
C. Complied with performance ^reporting
D. Defined a stakeholder management plan
11.由于内部组织结构调整,重点战略项目的可交付成果被严重推迟。该组织的首席执行官听到此消息感到十分惊讶
若要避免这个问题,项目经理应该事先做什么?
A. 未受影响的项目重新排列优先顺序
B. 制定一份沟通管理计划
C. 尊从绩效报告
D. 制定一份相关方管理计划
12.A project manager communicates with different project stakeholder at various levels, sharing different types of project information at any given time. The project manager now needs to send a data report to a specific group of project stakeholders.
What communication method should the project manager us?
A. Interactive
B. Push
C. Inpidual
D. Pull
12.项目经理与不同层次的不同项目相关方沟通,在任何给定时间分享不同类型的项目信息。项目经理现在需要向某一特定项目相关方组别发一份数据报告。项目经理应该使用什么沟通方法?
A 交互式沟通
B 推式沟通
C. 个体沟通
D. 拉式沟通
13.A new project manager joins a team midway through a project. The project has five influential stakeholders and 30 project team members. The project manager wants to update the team on the project status.
What should the project manager use?
A. Communications management plan
B. Shared workspace
C. Informal status meetings
D. Stakeholder management plan
13.新项目经理在项目中途参加团队。项目有五位有影响的相关方和30 名项目团队成员。项目经理希望向团队更新项目状态。项目经理应该怎么做?
A. 沟通管理计划
B. 共享的工作空间
C. 非正式状态会议
D. 相关方管理计划
14.The portfolio manager and the project director complain that they are missing essential project - - 总结资料
- - -
information required for decision making. The project manager knows that this information is available in the project reports and that both stakeholders have been identified to receive them. What should the project manager do to resolve this?
A. Review and update the project reports.
B. Review and update the stakeholder register.
C. Send both, stakeholders an email with the latest project report.
D. Review and update the communications management plan.
14.项目组合经理和项目总监抱怨说他们缺少制定决策所需的基本项目信息。项目经理了解到这些信息在项目报告中的提供,而且这两名项目相关方均已被识别接收这些报告。若要解决这个问题,项目经理应该怎么做?
A. 审查和更新项目报告。
B. 审查并更新相关方登记册。
C. 向两名项目相关方发送一封电子邮件,附上最新项目报告。
D. 审查并更新沟通管理计划。
15.Project stakeholders are dissatisfied with the type information provided in the project manager’s monthly report. What caused this?
A. Stakeholders were not invited to the project’s kick-off meeting.
B. The project requirements document is inaccurate.
C. The stakeholder communication strategy is ineffective.
D. The responsible, accountable, consult, and inform (RACI) matrix is improperly defined.
15.项目相关方对项目经理月报中提供的类型信息不满意。这是什么原因造成的?
A. 未邀请项目相关方参加项目启动大会。
B. 项目需求文件不准确。
C. 相关方沟通策略无效。
D. 执行、负责、咨询和知情(RACI)矩阵未正确定义。
16.A customer disagrees with the development manager on project cost estimates. The project manager meets with the customer, and the development manager to obtain alignment.
What is the project manager using?
A. Conflict management
B. Cost estimation
C. Project governance
D. Project approval
16.客户与开发经理对项目成本估算意见不一致。项目经理与客户和开发经理开会获得一致。
项目经理使用的是什么?
A. 冲突管理
B. 成本估算
C. 项目治理
D. 客户批准
17.After discovering that several external stakeholders were not properly identified, a project manager devises a method to better identify them. What should the project manager update to
- - 总结资料
- - -
ensure that the issue and solution are communicated to the entire company’s project management Community?
A. Lessons learned
B. Stakeholder management plan
C. Communications management plan
D. Project management office (PMO) documentation
17.发现多个外部相关方未正确识别后,项目经理发明一种方法,以便更好的识别这些相关方。为确保将这个问题和解决方案与整个公司的项目管理群体沟通,项目经理应更新什么?
A. 经验教训
B. 相关方管理计划
C. 沟通管理计划
D. 项目管理办公室(PMO)文档
18.Before the stakeholder meeting. What communication method should the project manager use to obtain key stakeholder approval of the project management plan?
A. Email
B. Interactive
C. Pull
D. push
18. 在相关方会议之前,项目经理应使用什么沟通方式获得相关方对项目管理计划的认可?
A. 电子邮件
B. 交互式沟通
C. 拉式沟通
D. 推式沟通
19.A project manager assigns an activity to a team member. The team member performs the activity as the understood. However, the results do not meet the project manager’s expectations
To avoid this situation, what tool should have been used?
A. Interactive communication
B. Active listening
C. Encode and decode
D. Push communication
19. 项目经理将一项活动分配给团队成员。团队成员按其理解执行活动。但是,执行结果未能满足项目经理的期望。
为避免这种情况,项目经理应该事先使用什么工具?
A. 交互式沟通
B. 积极倾听
C. 编码和解码
D. 推式沟通
20.Before project status meeting, the project manager uses electronic mail to report project progress and project performance reports. What communication method project manager used?
A. Interactive communication
B. Push communication
- - 总结资料
- - -
C. Pull communication
D. Active communication
20. 在状态会议前,项目经理采用电子邮件邮寄进度和绩效报告。这使用的是哪种类型的沟通方法?
A. 交互式沟通
B. 推式沟通
C. 拉式沟通
D. 主动式沟通
答案
1.参考答案:D
2.参考答案:A
3.参考答案:D。解析:会议管理是采取步骤确保会议有效并高效地达到预期目标。规划
会议时应采取以下步骤:准备并发布会议议程(其中包含会议目标);确保会议在规定的时间开始和结束;确保适当参与者受邀并出席;切题;处理会议中的期望、问题和冲突;记录所有行动以及所分配的行动责任人。
4.参考答案:C。解析:内部客户资源希望获知项目状态,这是相关方的沟通需求,要记
录在沟通管理计划中。
5.参考答案:B。解析:首先确定副总裁拒绝采用新文化的根本原因,然后再寻找解决方
案。
6.参考答案:A。解析:首先推荐非正式口头沟通,与该名成员私下交流。
7.参考答案:C。解析:1+3+3=7,7*6/2=21
8.参考答案:D。解析:沟通管理计划,里面有:相关方的沟通需求、需要沟通的信息、
发布信息的原因等。邀请了客户,却不常参加。需要先审查沟通管理计划,看看是否沟通的需求没有满足客户导致不常参加,并在之后对计划进行更新。
9.参考答案:A。解析:确保相关方能够接收到信息,要制定沟通管理计划。
10.参考答案:B。解析:范围变更,是涉及了基准的变更,需要使用交互式沟通,即交互
沟通。
11.参考答案:B。解析:对消息感到惊讶,说明没有保持及时的沟通。
12.参考答案:B。解析:向某一特定项目相关方发一份数据报告,这是把信息发送出去,
推式沟通。
13.参考答案:A。解析:pm 希望传递信息,应该通过沟通管理计划。
14.参考答案:D。解析:相关方被包含在接受报告的名单中,但还是抱怨缺少某些方面的
信息,说明沟通方法,沟通渠道等还是有问题,应该更新沟通管理计划。
15.参考答案:C。解析:提供的信息不满意,说明时传递信息产生了问题,这是沟通的问
题。
16.参考答案:A。解析:相关方意见不一致,这是有冲突,PM 与他们开会解决冲突。
17.参考答案:C。解析:此问题和方案要和“整个公司的项目管理群体”沟通,这是要和
相关方沟通,应该更新沟通管理计划。
18.参考答案:B。解析:交互式沟通(老版本里的叫法,第六版已改为互动沟通)。在两方
或多方之间进行多向信息交换。这是确保全体参与者对特定话题达成共识的最有效的方法,包括会议、、即时通信、视频会议等。
- - 总结资料
- - -
19.参考答案:A。解析:交互式沟通,有来有去,减少误解。
20.参考答案:B。解析:邮寄进度和绩效报告,这是推式沟通。
- - 总结资料
正在阅读:
PMP项目管理之沟通管理练习题04-08
扩散炉工艺文件04-27
自由落体运动说课02-19
《进化危机》经典观后感集12-12
会计学试题库12-04
压桩机行业市场调研行情及投资前景预测分析报告2018年目录06-29
架空线路类施工技术措施07-02
筏板混凝土浇筑专项施工方案106-02
今天我掌勺08-19
- 教学能力大赛决赛获奖-教学实施报告-(完整图文版)
- 互联网+数据中心行业分析报告
- 2017上海杨浦区高三一模数学试题及答案
- 招商部差旅接待管理制度(4-25)
- 学生游玩安全注意事项
- 学生信息管理系统(文档模板供参考)
- 叉车门架有限元分析及系统设计
- 2014帮助残疾人志愿者服务情况记录
- 叶绿体中色素的提取和分离实验
- 中国食物成分表2020年最新权威完整改进版
- 推动国土资源领域生态文明建设
- 给水管道冲洗和消毒记录
- 计算机软件专业自我评价
- 高中数学必修1-5知识点归纳
- 2018-2022年中国第五代移动通信技术(5G)产业深度分析及发展前景研究报告发展趋势(目录)
- 生产车间巡查制度
- 2018版中国光热发电行业深度研究报告目录
- (通用)2019年中考数学总复习 第一章 第四节 数的开方与二次根式课件
- 2017_2018学年高中语文第二单元第4课说数课件粤教版
- 上市新药Lumateperone(卢美哌隆)合成检索总结报告
- 练习题
- 项目管理
- 沟通
- 管理
- PMP
- 幼儿园妇女节教案《三八节来历》+《三八节活动》
- 初三数学数与代数专题试题
- 运动会800米跑作文600字
- 中医为何能延长胃癌患者的生存时间
- 校园文化建设工作计划表模板
- 2022-2023年隆尧县装配式建筑市场发展前景研究报告(目录)
- 起重设备资质代办如何申请?(三级)
- 例谈古诗词教学的“深入浅出”与“浅入深出”
- 黑龙江省大庆铁人中学2022届高三数学第一次模拟考试试卷理
- 重庆科创职业学院自动生产线安装与调试课程标准
- 2016年最新青岛版小学数学五年级下册备课全册教案(精品)
- 2022七年级数学教师工作计划下册3篇
- 华东师范大学版 初中数学 七年级下册 一课一练 课堂精练 同步练
- 煤矿顶板事故心得体会
- 龙驹古寨文化旅游区旅游基础设施建设项目投资可行性研究报告
- 四年级四年级下册看拼音写词语
- 风电场电力线路部分安规试题
- 金驰能源材料有限公司10000吨年电池材料生产基地建设项目环境影
- 多组分赛络针织纱的开发
- 部编人教版四年级下册语文《记金华的双龙洞》优质说课稿