GM 4M变更教程
1. What is 4M change4M = Man + Machine + Material + Method
Any change for the 4 aspects in suppliers should be reported out as 4M change. If the change follow GM formal process, such as EWO change procedure, or BTAB procedure, then no need follow 4M process
GM Confidential
GM 4M变更教程
2. 4M Change Process
GM Confidential
GM 4M变更教程
3. 4M Change ItemsMan Operator change
- Process/line: change more than 30%- Special process: key operator change
Temporary operator due to sudden accident Shift change
GM Confidential
GM 4M变更教程
3. 4M Change ItemsMachine New, replacement or modification for a facility
New/replacement for an inspection facility Product produced after the tooling has been inactive for volume production for 6 months or more A thorough overhaul of existing tooling or equipment Lay-out change of facility
Change trouble tooling to temporary tooling
GM Confidential
GM 4M变更教程
3. 4M Change ItemsMaterial Material change
Change of subcontractor for part or material Change the grade, color and combination ratio of material
Change the identification(Paint, label, marking, etc.) Change cleaner and anti-corrosive agent Change the packing(Protection cap, packing method and rack)
GM Confidential
GM 4M变更教程
3. 4M Change ItemsMethod Change process flow and operation method - Manual <=> Automatic - Baseline of processing standard and setting method - Spot welding <=> Arc welding Change process parameter - Operation standard and control standard - Change the forming temperature Change, delete, add and integrate the sequence of process flow
Production from tooling and equipment transferred to a different plant location or from an additional plant location Add/delete the cleaning operationGM Confidential
GM 4M变更教程
4. Important Things About 4M Change Make sure any change happens in supplier, which will have impact on parts or process, is reported out All 4M changes need to be approved by customers before implementation PTR is required if the change has potential impact on vehicle assembly
Clear “Break Point” shall be set up to identify parts with 4M change
GM Confidential
正在阅读:
优秀管理者颁奖词.doc03-22
那一刻我哭了作文600字07-03
无锡小学开学时间02-15
客户反馈处理程序09-03
“大检修”专业自评估总结报告(天津参考)12-17
台达PLC连续脉冲输出如何控制速度03-30
- 教学能力大赛决赛获奖-教学实施报告-(完整图文版)
- 互联网+数据中心行业分析报告
- 2017上海杨浦区高三一模数学试题及答案
- 招商部差旅接待管理制度(4-25)
- 学生游玩安全注意事项
- 学生信息管理系统(文档模板供参考)
- 叉车门架有限元分析及系统设计
- 2014帮助残疾人志愿者服务情况记录
- 叶绿体中色素的提取和分离实验
- 中国食物成分表2020年最新权威完整改进版
- 推动国土资源领域生态文明建设
- 给水管道冲洗和消毒记录
- 计算机软件专业自我评价
- 高中数学必修1-5知识点归纳
- 2018-2022年中国第五代移动通信技术(5G)产业深度分析及发展前景研究报告发展趋势(目录)
- 生产车间巡查制度
- 2018版中国光热发电行业深度研究报告目录
- (通用)2019年中考数学总复习 第一章 第四节 数的开方与二次根式课件
- 2017_2018学年高中语文第二单元第4课说数课件粤教版
- 上市新药Lumateperone(卢美哌隆)合成检索总结报告
- Introduction
- Process
- 4M
- 实验一 RFID设备调试及软件开发_学
- 09年5月运输管理(二)
- PDF全文阅览- 在生物化学教学中渗透人文素养教育
- CO2气体保护焊操作技能讲义
- 爆破应用技术——聚能装药在预裂爆破中的应用
- 北师大八年级数学 等腰三角形第3课时
- 机器人技术基础_复习资料
- 得实平台教师简明使用手册doc
- 浅谈英语听力课的教学
- NASS循证临床指南:退行性腰椎管狭窄的诊断和治疗(2011版)
- 10测专顶岗实习手册
- 计算机控制技术 于海生 课后答案
- 如何辨别欧洲品牌壁挂炉是原装进口还是国产的
- -二建考试建筑工程管理与实务试题及答案解析(第一套)
- 混凝土结构设计原理重点
- 紧固件安装培训教材
- 吸收式太阳能制冷系统的研究
- topworx回讯器说明书
- 2008年浙江金华中考政治试卷及参考答案
- 中小型企业划型标准