CCT-3320T 电导率表说明书英文版(原CM230)
更新时间:2023-05-15 17:06:01 阅读量: 实用文档 文档下载
- cct-3320T说明书推荐度:
- 相关推荐
ROC
CCT-3320T
Conductivity(TDS)Monitor ®
Manual
1. Specifications Instrument Specifications
Item
Measuring
Ranges Measuring Range(S/cm Electrode Constant(cm-1) 0.5~199.9 1.0~1999
5~9999
Conductivity
Temperature 0.100 1.000 5.000 1.5%(FS) ≤±0.8℃ Accuracy
Tem. Range
4—20mA
Direct
Current
Power In.
Power
Consumption
environmenta
l conditions
Dimension
Install Hole 0~50℃;Compensation base on 25℃ Channel Technical Feature Translate Accuracy 1 Isolate、Reversible、Fully adjustable 1.5%(FS) AC220V±10% 50/60Hz ≤2.5W Temperature:0~50℃;Humidity≤85%RH (48×96×80)mm(H×W×D) (44×92)mm(H×W)
Electrode Parameter
Liquid Tem. (5~50)℃
Screw Size
Liquid
Pressure
Cable
Length 1/2" G 0~ 0.5Mpa 5m OR as customized
2.Backside Wiring Diagram and Description
W—Electrode white line; G/B—Electrode green line;
Y—Electrode yellow line; R—Electrode red line;
I+/I-:4~20mA measuring mode, internal power;
T+/T-:4~20mA transmit mode,internal adjusting
module power;
0V/220V:Alternating current AC 220V Inlet;
Emc grounded protection(earthing); :
NC: No connected(empty connect inside);
3.Measuring Electrode Installation
Bubble or static water can cause electrode measuring errors,
ensure electrode inset enough length. In strict accordance with the below installation:
Correct installation method (1) to ensure that the electrode inset enough length into the measured water.
Correct installation method (2) to ensure that the water flow from the small hole of the electrode
Notice:
1.Electrode should be installed in the low position of the pipe, where velocity stability and not easy to accumulation of air bubbles.
2.Electrode horizontal or vertical installation must inset deep into the water.
3.Measurement signal is a weak electrical signal, its cable should go line independently, avoid power line and control line connection in the same set of cable connector or terminal board.
4.If measuring cable need to be longer, please contract length before delivery.
4. Button Introduction
5.Operating Interface Introduction
M" button for 3 seconds automatically enter the Setup menu
Setup No.Setup Item Function
Label flashing, operate the
Electrode "Position" and "Add" button to input
1
constant electrode constant value, press "Enter" to
save and enter the next parameter settings
Decimal point identification flashing,
Constant decimal "Position" key to select position; Press
2
point "Enter" to save and enter next parameter
settings
measuring Unit (PPM, PPT or S/cm,
3 Units select
mS/cm), and press "Enter" to save and
enter next parameter settings
4 corresponding value; "Enter" to save, 4mA Parallelism"Position" to select decimal point, "Enter"
to save and enter next parameter settings
5 corresponding value; "Enter" to save, 20mAParallelism"Position" to select decimal point, "Enter"
to save and enter next parameter settings
6.Trouble Shooting
When there is measurement data is not correct, unstable faults, perform the following inspection and judgment:
1.To analyze problems caused by instrument or electrode ?
White on the meter terminal line (White) to be removed, display show the measuring is zero, excluding instrument failure, review the
installation of the electrode.
2.Electrode installation and faults
Uninstall the electrode from the pipe, use of known conductivity water to test, such as the correct value for consideration fault cause by the installation.
7.Maintenance
Measuring electrode is precision components decomposition, do not change the conductivity pool shape and size; Do not use strong acid, alkali cleaning, in order to avoid changing electrode constants, affect the measure precision of the instrument.
1.Regularly use neutral cleanser or dilute hydrochloric acid(10%) for short soak, then wash with pure water, in order to keep the conductivity pool surface clean. Measurement cable is special cable, do not change, so as not to introduce significant error.
2.Instrument should be placed in dry environment or control box, avoid water splash or wet leakage meter or measurement error.
河北科瑞达仪器科技股份有限公司
地址:石家庄市新石北路368号金石工业园2号楼1层 邮编:050091
电话:0311-83056195 83056196
Http://
E-mail:webmaster@
正在阅读:
CCT-3320T 电导率表说明书英文版(原CM230)05-15
关于2021法院优秀干警先进事迹材料08-08
几个必要的摄影名词解释:ISO与图片质量、光圈、焦距、变焦、景05-11
2013年福建省中学生生物学竞赛初赛试卷06-06
关于高二历史教学工作总结2022年04-04
勘察任务与技术要求06-17
周一问候语02-11
首师大二附中 期中优秀作文12-05
- 教学能力大赛决赛获奖-教学实施报告-(完整图文版)
- 互联网+数据中心行业分析报告
- 2017上海杨浦区高三一模数学试题及答案
- 招商部差旅接待管理制度(4-25)
- 学生游玩安全注意事项
- 学生信息管理系统(文档模板供参考)
- 叉车门架有限元分析及系统设计
- 2014帮助残疾人志愿者服务情况记录
- 叶绿体中色素的提取和分离实验
- 中国食物成分表2020年最新权威完整改进版
- 推动国土资源领域生态文明建设
- 给水管道冲洗和消毒记录
- 计算机软件专业自我评价
- 高中数学必修1-5知识点归纳
- 2018-2022年中国第五代移动通信技术(5G)产业深度分析及发展前景研究报告发展趋势(目录)
- 生产车间巡查制度
- 2018版中国光热发电行业深度研究报告目录
- (通用)2019年中考数学总复习 第一章 第四节 数的开方与二次根式课件
- 2017_2018学年高中语文第二单元第4课说数课件粤教版
- 上市新药Lumateperone(卢美哌隆)合成检索总结报告
- 电导率
- 英文版
- 说明书
- CM230
- 3320
- CCT
- 消防演习步骤Process for Fire Drill
- 诚信计生双向承诺书
- 第11讲 状态图和活动图
- DCYX6576-黑弧奥美-华润外滩九里核心idea2011.3
- 珠海洗浴设备生产线项目商业计划书
- 唐五代时期敦煌的宴饮“赌射”——敦煌文献P.3272卷“射羊”一词小解
- 人体常见疾病与保健
- 商用车车架常用横梁的力学性能研究
- CI-900便携式乙烯气体分析仪
- XX社区卫生服务中心2011工作计划
- 四川理工学院安全知识竞赛答案
- 2013一级安徽省建造师市政最新考试试题库(完整版)
- 项目重大危险源监控和管理
- 建筑物防雷装置年度检测报告
- 六年级语文课外阅读试题2
- 小学必读四大名著的歇后语
- 上海师范大学高数试题 (9)
- 2010年修订版_毛概课后习题答案
- 2014北京军转干考试申论热点:社会诚信问题
- 农村集体三资管理及财务规范化建设汇报